Philippines / Site

VITRO Santa Rosa

VITRO Sta. Rosa · VSR · ePLDT VITRO Sta Rosa

Operational

Operational VITRO hyperscale colocation site in Santa Rosa, Laguna, publicly launched in April 2025. Published specifications distinguish 36 MW IT load, 50 MW total power and a dedicated 60 MW substation. Initial-phase reporting does not establish how much ultimate capacity is currently commissioned. Legal ownership following the 2026 corporate restructuring remains unresolved.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 2
VITRO Santa Rosa exterior photograph showing the signed facade and upper building against a clear sky; capture date unknown.

Site / building photo

VITRO Santa Rosa exterior photograph showing the signed facade and upper building against a clear sky; capture date unknown.

Published date unknown · Captured date unknown · Checked 2026-09-11

Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.

metro.style · Source and attribution ↗
Image rights and date notes

ABS-CBN page states all rights reserved. Photographer and reuse permission not established. Publication and capture dates were not independently established.

Site profile

Operator
VITRO (ePLDT / PLDT Group)
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Laguna / Manila
City / locality
Santa Rosa
Address
Tagaytay-Balibago Road, Barangay Pulong Sta. Cruz, Santa Rosa City, Laguna, Philippines
Location
PeeringDB facility geocode, closely matching the user-reported pin at 14.26865, 121.081225. Locality corroborated by facility directories; parcel boundaries and street-level point placement were not established.
Precision: approximate · 14.268688, 121.081342
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode, closely matching the user-reported pin at 14.26865, 121.081225. Locality corroborated by facility directories; parcel boundaries and street-level point placement were not established.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Tagaytay-Balibago Road, Barangay Pulong Sta. Cruz, Santa Rosa City, Laguna, Philippines

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
36 MW
IT load
Advertised total IT load capacity of VITRO Santa Rosa
Operational · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated facility page. Operational describes the site; the source does not establish that all advertised capacity is commissioned or occupied.

50 MW
Facility power
VITRO Santa Rosa total power capacity
Operational · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated operator announcement, which explicitly calls this total power capacity. Do not add to IT load or substation capacity.

60 MW
Grid connection
Dedicated substation serving VITRO Santa Rosa
Operational · unclear
2026-09-11Reported claim ↗

Excluded from capacity totals. As-of is retrieval date. Advertised substation rating, corroborated by Mace, is not proof of contracted utility import capacity or actual demand.

≈10 MW
Unspecified power
First phase at April 2025 launch
Operational · incremental
2025-04-23Reported claim ↗

Excluded from capacity totals. As-of is article publication date. Article reports about 10 MW in the first phase without explicitly identifying the power basis.

10 MW
IT load
Historical initial IT capacity planned for 2024
Planned · incremental
2026-09-11Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated retained historical text; target year is 2024. Likely overlaps the launch-phase claim; no inference of a second 10 MW increment.

10 MW
IT load
Additional Santa Rosa IT-ready capacity targeted for activation by end-2026
Planned · incremental
2026-08-13Reported claim ↗

Excluded from capacity totals. As-of is the earnings-call date identified by the third-party transcript. IT basis follows the surrounding discussion of activated IT-ready capacity. This is a future activation target, not confirmation of commissioning; original operator transcript not located. Do not add to advertised ultimate site capacity.

Development timeline

  1. 2022-02 · announcement

    Santa Rosa data center announced

    DCD retrospectively dates initial project announcement to February 2022.

    Supporting source ↗
  2. 2022-03 · actual_groundbreaking

    Groundbreaking

    DCD reports groundbreaking in the month after the initial announcement.

    Supporting source ↗
  3. 2024-04 · planned_energization

    Switching-station energization target

    Historical operator announcement targeted energization of the dedicated Meralco switching station in April 2024; actual date not established.

    Supporting source ↗
  4. 2024-07 · planned_opening

    Original go-live target

    Operator targeted July 2024 opening; this target is not treated as proof of commercial service.

    Supporting source ↗
  5. 2024-07 · actual_structural_completion

    Topping-out reported

    DCD retrospectively reports topping-out in July 2024.

    Supporting source ↗
  6. 2024-09-05 · announcement

    Ciena interconnection announced

    Supplier announced planned connections to other VITRO facilities; completion date not established by this announcement.

    Supporting source ↗
  7. 2025-04-23 · actual_launch

    Public launch

    DCD reports inauguration and first-phase launch; government coverage corroborates the launch that month.

    Supporting source ↗
  8. 2026-05-22 · announcement

    LEED Gold announced

    Operator archive announces receipt of LEED Gold; certification award date and registry identifier remain unconfirmed.

    Supporting source ↗
  9. 2026-06-16 · announcement

    Toyota colocation partnership

    Operator archive announces a colocation agreement with Toyota Motor Philippines.

    Supporting source ↗
  10. 2026-03-03 · actual_certification_award

    TIA constructed-facility certification awarded

    TIA's registry records EPI certificate TIA942PH260303001, ANSI/TIA-942-B Constructed Facility Rated 3, expiring March 2, 2029. Earlier certification publicity requires reconciliation with this registry award.

    Supporting source ↗
  11. 2026 · planned_capacity_activation

    Additional 10 MW targeted by year-end

    August earnings-call reproduction reports a target to activate the next 10 MW at Santa Rosa by the end of 2026. Completion is not established.

    Supporting source ↗

Disclosed specifications

Land area

5 hectares

Published site area; parcel survey not obtained.

Source ↗

White space — facility page

12,140 sqm

Conflicts with brochure; retain both pending reconciliation.

Source ↗

White space — brochure

13,140 sqm

Conflicts with facility page; publication date unknown.

Source ↗

Data halls and racks

18 halls; up to 4,500 racks at 8 kW/rack

Advertised configuration, not occupied rack count.

Source ↗

Power redundancy

2N UPS per hall; dual utility feeds; N+1 generators; 72-hour fuel backup

Operator design specifications.

Source ↗

Cooling

Fully redundant water-cooled system; 10-minute thermal storage

No measured water consumption disclosed in reviewed material.

Source ↗

Service availability

99.99% uptime SLA

Contractual advertised target, not measured historical uptime.

Source ↗

Design PUE

1.4

Operator value; Baxtel lists 1.2 without reconciliation. Neither establishes measured operational PUE.

Source ↗

Renewable electricity

Minimum 35% on day one

Operator claim; Baxtel lists 11%. Current delivered share not independently established.

Source ↗

Network access

Carrier-neutral; at least three points of entrance; international cable-landing-station connections

Operator advertises diverse routes; PeeringDB lists the VITRO Internet Exchange.

Source ↗

Inter-data-center connectivity

Ciena Waveserver Ai and 6500 coherent optical technology

September 2024 announcement targeted links with Makati, Paranaque and Pasig.

Source ↗

TIA certification

TIA-942 Rated 3; Rated 4 readiness claimed

Operator reports Rated 3 certification; Rated 4 readiness does not establish Rated 4 certification.

Source ↗

Environmental certification

LEED Gold announced May 22, 2026

Supported by operator archive; underlying article fetch failed and certification registry was not checked.

Source ↗

Publicly disclosed customer

Toyota Motor Philippines

Operator archive announces colocation partnership June 16, 2026.

Source ↗

Publicly disclosed hosted platform

ePLDT NVIDIA-powered GPU servers

Operator reports hosting for ePLDT AI services; no private tenant details inferred.

Source ↗

Development and delivery

VITRO developer; Mace project and construction management

Mace identifies VITRO as commissioning client.

Source ↗

Public business contact

customercare@vitrodc.com; +63 (2) 888-VITRO

General operator contact. The website's Makati office address is not this facility address.

Source ↗

TIA constructed-facility certification

ANSI/TIA-942-B Rated 3; EPI certificate TIA942PH260303001

Registry status active; awarded 2026-03-03; expires 2029-03-02. Does not establish Rated 4 certification or reconcile earlier award publicity.

Source ↗

Environmental certification

LEED Gold

PLDT's August 13, 2026 SEC-filed release confirms the achievement. Registry identifier, award date and scorecard remain unresolved.

Source ↗

Electrical distribution equipment

ABB ZX2 and SafePlus gas-insulated switchgear; Tmax XT and Emax 2 circuit breakers; protection devices and M4M analyzers

ABB reports delivery with Distribution & Control Products, Inc. in its November 26, 2025 customer story.

Source ↗

Telecommunications space

608 sqm; eight telco rooms with 26 racks each

Advertised brochure configuration, not occupied rack count.

Source ↗

Inter-data-center connectivity

VITRO Data Centre Interconnect links to other flagship VITRO facilities and international cable landing stations

Mace describes existing connections; commissioning date and completion of each previously announced Ciena route are not specified.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

VITRO Santa Rosa — official facility page ↗

Published Date unavailable · Retrieved 2026-09-11

Facility specifications identify 36 MW IT load, 18 halls, 12,140 sqm white space, up to 4,500 racks, redundant cooling and a 60 MW substation; identifies VITRO as developer.

VITRO Santa Rosa — PeeringDB ↗

Published Date unavailable · Retrieved 2026-09-11

Facility entry identifies Vitro Inc., Santa Rosa, Laguna, PH, plus code 739J+FGG and coordinates 14.268688, 121.081342. Entry last updated September 26, 2025.

PLDT launches Sta. Rosa data center ↗

Published 2025-04-23 · Retrieved 2026-09-11

Reports launch, approximately 10 MW first phase, February 2022 announcement, March 2022 groundbreaking and July 2024 topping-out.

Data Center Sites — VITRO ↗

Published Date unavailable · Retrieved 2026-09-11

Retains forward-looking text for initial 10 MW IT power in 2024; this appears historical and does not prove current delivered capacity.

VITRO Santa Rosa — Mace ↗

Published Date unavailable · Retrieved 2026-09-11

Project manager describes 50 MW facility, 4,500 racks, adjacent 60 MW substation, redundant water cooling and delivery for VITRO.

ePLDT VITRO Sta Rosa — Data Center Map ↗

Published Date unavailable · Retrieved 2026-09-11

Lists Pulong Santa Cruz, Santa Rosa 4026, Philippines; offers suites, cages and cabinets and distinguishes nearby NARRA1 and A-FLOW ML1.

PLDT VITRO: Sta. Rosa — Baxtel ↗

Published Date unavailable · Retrieved 2026-09-11

Lists Pulong Santa Cruz in the Manila data-center market; labels operational with future phases planned, but gives PUE 1.2 and renewable energy 11%, differing from operator specifications.

Data Center category — VITRO announcements ↗

Published Date unavailable · Retrieved 2026-09-11

Operator archive dates Toyota colocation announcement June 16, 2026 and LEED Gold announcement May 22, 2026; excerpts identify Toyota partnership and receipt of LEED Gold.

VITRO Inc., VITRO Sta. Rosa Data Center — TIA certification registry ↗

Published Date unavailable · Retrieved 2026-09-11

Names the facility on Tagaytay-Balibago Road, Barangay Pulong Sta. Cruz, Santa Rosa City, Laguna, Philippines. Lists active ANSI/TIA-942-B Constructed Facility Rated 3 certification, EPI certificate TIA942PH260303001, awarded March 3, 2026 and expiring March 2, 2029.

PLDT first-half 2026 results — SEC-filed news release ↗

Published 2026-08-13 · Retrieved 2026-09-11

Discusses ePLDT and VITRO REIT's colocation business, Santa Rosa operations, TIA-942 Rated 3 Facility Certification and LEED Gold. Nearly 34 MW available, 44 MW end-2026 and 62.4 MW by 2027 are portfolio figures, not Santa Rosa-only capacities.

VITRO Santa Rosa — Mace project case study ↗

Published Date unavailable · Retrieved 2026-09-11

Identifies VITRO as commissioning client for project and construction management. Describes the hyperscale facility, redundant water cooling and existing VITRO Data Centre Interconnect links to flagship facilities and international cable landing stations.

VITRO brochure — Santa Rosa specifications ↗

Published Date unavailable · Retrieved 2026-09-11

PDF page 10 specifies 13,140 sqm white space, 36 MW IT load, 18 halls, 608 sqm telecommunications space and eight telco rooms with 26 racks each. Date is not inferred from filename.

Property photo · metro.style ↗

Published Date unavailable · Retrieved 2026-09-11

VITRO Santa Rosa exterior photograph showing the signed facade and upper building against a clear sky; capture date unknown. Original image: https://od2-image-api.abs-cbn.com/prod/editorImage/1757233388228Metro.Style%20VITRO%20Santa%20Rosa%20%28VSR%29%20Data%20Center.jpg

Profile field evidence

Name: VITRO Santa Rosa — PeeringDB; VITRO Inc., VITRO Sta. Rosa Data Center — TIA certification registry

Aliases: VITRO Santa Rosa — official facility page; PLDT launches Sta. Rosa data center; ePLDT VITRO Sta Rosa — Data Center Map

Kind: VITRO brochure — Santa Rosa facility specifications; PLDT launches Sta. Rosa data center

Country: VITRO Inc., VITRO Sta. Rosa Data Center — TIA certification registry; VITRO Santa Rosa — PeeringDB

Region: VITRO Inc., VITRO Sta. Rosa Data Center — TIA certification registry; VITRO Santa Rosa — PeeringDB

City: VITRO Inc., VITRO Sta. Rosa Data Center — TIA certification registry; VITRO Santa Rosa — PeeringDB

Metro: PLDT VITRO: Sta. Rosa — Baxtel

Address: VITRO Inc., VITRO Sta. Rosa Data Center — TIA certification registry

Operator: VITRO Santa Rosa — PeeringDB; PLDT first-half 2026 results — SEC-filed news release; VITRO Santa Rosa — Mace project case study

Business Model: ePLDT VITRO Sta Rosa — Data Center Map; PLDT first-half 2026 results — SEC-filed news release

Scale: ABB powers Philippines’ first AI-ready hyperscale data center with resilient, sustainable infrastructure; VITRO Santa Rosa — Mace project case study

Statuses: PLDT first-half 2026 results — SEC-filed news release

Location: VITRO Santa Rosa — PeeringDB; ePLDT VITRO Sta Rosa — Data Center Map

Summary: VITRO Santa Rosa — official facility page; VITRO Inc. sets benchmark in Data Center Excellence, led by AI-ready Santa Rosa Site; PLDT launches Sta. Rosa data center; PLDT seeks SEC, PSE nod for Vitro maiden share sale

Media: Property photo · metro.style

Stable identifier: 01519f56-baeb-4ce1-9d44-17dc5145dfcd