Australia / Facility

NEXTDC S2 · S2 Sydney · S2 Macquarie Park · Giffnock Data Centre

Operational

Operational NEXTDC hyperscale colocation facility in Macquarie Park, Sydney, distinct from S1. Advertised IT capacity is 30 MW, with 30 MW installed reported in FY21. Contractor-reported 2025 power upgrades have no disclosed incremental MW.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
S2 exterior photograph from iTnews's property gallery published 5 August 2020; capture date not established.

Site / building photo

S2 exterior photograph from iTnews's property gallery published 5 August 2020; capture date not established.

Published date unknown · Captured date unknown · Checked 2026-10-09

Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.

www.itnews.com.au · Source and attribution ↗
Image rights and date notes

Gallery states copyright iTnews.com.au, all rights reserved. Photographer attribution and import/reuse permission are unresolved; review before importing. Publication and capture dates were not independently established.

Site profile

Operator
NEXTDC
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
New South Wales / Sydney
City / locality
Macquarie Park
Address
6-8 Giffnock Avenue, Macquarie Park NSW 2113
Location
PeeringDB facility geocode for the address corroborated by NEXTDC and NSW planning records; marker placement has not been independently checked against property boundaries or Google Maps.
Precision: approximate · -33.785125, 151.125301
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode for the address corroborated by NEXTDC and NSW planning records; marker placement has not been independently checked against property boundaries or Google Maps.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

6-8 Giffnock Avenue, Macquarie Park NSW 2113

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
30 MW
IT load
S2 facility advertised total IT capacity
Operational · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated operator page, not commissioning date or measured consumption. Current brochure calls the same figure target IT capacity.

30 MW
Unspecified power
S2 total installed capacity following FY21 fitout
Operational · cumulative
2021-06-30Reported claim ↗

Excluded from capacity totals. As-of represents FY21 reporting period end; announcement published 27 August 2021. Installed capacity basis is not explicitly labelled IT in this announcement; overlaps c1.

22 MW
Unspecified power
S2 total installed capacity reported for FY20
Operational · cumulative
2020-06-30Reported claim ↗

Excluded from capacity totals. As-of represents FY20 period end; published 27 August 2020. Historical installed capacity superseded by FY21 report; do not add to subsequent totals.

Development timeline

  1. 2017-08-07 · actual_approval

    Development application approved

    Sydney North Planning Panel approved LDA2017/0192 for the Giffnock Avenue data centre.

    Supporting source ↗
  2. 2020 · actual_completion

    Initial building completed

    Contractor reports initial construction completion in 2020; early access and later fitout should be distinguished from building completion.

    Supporting source ↗
  3. FY21 · actual_fitout

    Fitout reached 30 MW installed capacity

    Operator reports completed fitout during the financial year ended 30 June 2021.

    Supporting source ↗
  4. 2025-06-12 · announcement_actual_completion

    Power upgrade practical completion announced

    Multiplex announced integration of six prefabricated skids; no incremental MW was disclosed.

    Supporting source ↗

Disclosed specifications

Technical space

8,700 m²

Technical space, not land or gross building area.

Source ↗

Rack capacity

4,543

Advertised capacity, not occupied rack count.

Source ↗

Building levels

8

Contractor description; planning approval also describes eight storeys.

Source ↗

Cooling

Hot aisle containment; indirect free-cooling CRAC; modular cooling towers; N+1 cooling

Operator-reported configuration; minimum 24-hour on-site water storage also advertised.

Source ↗

Energy efficiency

PUE 1.29 yearly average / 1.15 yearly lowest

Operator webpage figures; brochure describes target PUE and load-dependent annual/instantaneous ratios. No independent measured reporting period established.

Source ↗

Resilience certification

Uptime Institute Tier IV design and construction

Operator claim; current certificate validity was not independently checked.

Source ↗

Connectivity

Carrier-neutral colocation and interconnection with S1 and S3

Network links do not establish a parent campus relationship or named tenant contracts.

Source ↗

Power upgrade configuration

Three modified switchrooms and three generator enclosures

Contractor describes 2025 upgrades without additional MW.

Source ↗

Public network presence

EdgeIX Sydney, IX Australia Sydney and MegaIX Sydney

PeeringDB listings; network presence is not proof of customer tenancy or contracted power.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

S2 Sydney NEXTDC Data Centre ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies S2 in Macquarie Park, with 30 MW IT capacity, 8,700 m² technical space and 4,543 rack capacity; describes Tier IV design/construction certification, cooling and interconnection.

Sydney Data Centres Technical Specifications ↗

Published Date unavailable · Retrieved 2026-10-09

Pages 3–5 identify the Australian facility address and target IT capacity; S2 section describes a hyperscale facility. Publication date not established from filename.

NEXTDC announces strong FY20 results ↗

Published 2020-08-27 · Retrieved 2026-10-09

FY20 development activity reports building completion and four additional halls, bringing installed capacity to 22 MW.

NEXTDC S2 — PeeringDB ↗

Published Date unavailable · Retrieved 2026-10-09

Facility record gives matching Macquarie Park address, AU country code and geocode -33.785125, 151.125301; lists exchanges and networks.

Inside NEXTDC's new Sydney data centre, S2 ↗

Published 2020-08-05 · Retrieved 2026-10-09

Dated gallery reports newly opened S2 in Macquarie Park and provides exterior/interior property photographs; capture dates and reuse permission are not established.

Property photo · www.itnews.com.au ↗

Published Date unavailable · Retrieved 2026-10-09

S2 exterior photograph from iTnews's property gallery published 5 August 2020; capture date not established. Original image: https://i.nextmedia.com.au/Utils/ImageResizer.ashx?c=0&h=450&n=https%3A%2F%2Fi.nextmedia.com.au%2FGalleries%2F20200805040755_Xenia_S2_Exteriors_003.jpg&s=0&w=800

Profile field evidence

Name: S2 Sydney NEXTDC Data Centre; NEXTDC S2 — Development Application Clarifications regarding Amenity and Hazards

Aliases: S2 Sydney NEXTDC Data Centre; Giffnock Data Centre — NSW Planning Portal; NEXTDC S2 — Development Application Clarifications regarding Amenity and Hazards

Kind: S2 Sydney NEXTDC Data Centre; NEXTDC S2 Sydney Data Centre — Multiplex project

Country: NEXTDC S2 Sydney Data Centre — Multiplex project; NEXTDC S2 — PeeringDB

Region: Sydney Data Centres Technical Specifications; NEXTDC S2 Sydney Data Centre — Multiplex project

City: S2 Sydney NEXTDC Data Centre; Sydney Data Centres Technical Specifications

Metro: Sydney Data Centres — Colocation and Cloud Connectivity

Address: Sydney Data Centres Technical Specifications; Giffnock Data Centre — NSW Planning Portal; NEXTDC S2 — Development Application Clarifications regarding Amenity and Hazards

Operator: S2 Sydney NEXTDC Data Centre; Sydney Data Centres — Colocation and Cloud Connectivity

Business Model: Sydney Data Centres — Colocation and Cloud Connectivity

Scale: Sydney Data Centres Technical Specifications

Statuses: S2 Sydney NEXTDC Data Centre; NEXTDC announces strong FY21 results; Inside NEXTDC's new Sydney data centre, S2

Location: NEXTDC S2 — PeeringDB; Sydney Data Centres Technical Specifications; Giffnock Data Centre — NSW Planning Portal

Summary: S2 Sydney NEXTDC Data Centre; NEXTDC announces strong FY21 results; Announcing Practical Completion at NEXTDC S2 Sydney; Sydney Data Centres — Colocation and Cloud Connectivity

Media: Property photo · www.itnews.com.au

Stable identifier: 01b1de15-d8c5-4874-aecd-3d76c1e9593b