Map
Sign in
← Explore registry

Australia / Facility

NEXTDC P2 Perth

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

P2 Perth · NEXTDC P2 Perth Data Centre

Operational

Operational NEXTDC hyperscale colocation facility in Perth CBD, officially opened in July 2020. Advertised 20MW+ IT capacity is a facility-scale claim, not measured consumption or confirmation of full fit-out. Later disclosures describe staged expansion.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
NEXTDC
Ownership
NEXTDC (identified as owner in July 2020 council records; current title unconfirmed)
Business model / scale
Colocation / Hyperscale
Region / metro
Western Australia / Perth
City / locality
Perth
Address
11 Newcastle Street, Perth WA 6000, Australia
Location
Destination marker encoded in NEXTDC's published Google Maps directions link for P2 at 11 Newcastle Street; address corroborated by operator and council records. Listing and marker could not be visually inspected; no surveyed or block accuracy asserted.
Precision: approximate · -31.9496948, 115.8685493
View location on map →
Parent
Not assigned

Location detail

Destination marker encoded in NEXTDC's published Google Maps directions link for P2 at 11 Newcastle Street; address corroborated by operator and council records. Listing and marker could not be visually inspected; no surveyed or block accuracy asserted.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

11 Newcastle Street, Perth WA 6000, Australia

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≥20 MW
IT load
P2 advertised facility IT capacity
Operational · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval-date observation of undated 20MW+ marketing claim. Plus sign retained as lower-bound wording; does not establish commissioned load or consumption.

20 MW
IT load
P2 target IT capacity in operator brochure
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated brochure retrieved on this date explicitly calls this target capacity. Overlaps current advertised capacity; no commissioning date established.

3.9 MW
IT load
P2 white-space and infrastructure expansion initial IT capacity
Operational · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval-date observation of contractor's undated account of expansion completed April 2023. Relationship to other expansion disclosures is unresolved.

3.5 MW
IT load
Further capacity reserved in P2 expansion works
Planned · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval-date observation; contractor describes capacity reserved for future growth, not commissioned capacity. Potential overlap with subsequent works unknown.

4 MW
Unspecified power
P2 capacity being progressed at 31 December 2025
Under Construction · unclear
2025-12-31Reported claim ↗

Excluded from capacity totals. Source's reporting cutoff, not completion date. Development disclosure says being progressed; precise power basis, construction stage and overlap with earlier fit-outs are unclear.

Development timeline

  1. 2018-11-01 · actual_approval

    Data centre complex approved

    Council records LDAP approval with conditions for further use and development of 11 Newcastle Street.

    Supporting source ↗
  2. 2019-08-19 · announcement

    P2 microsite launched

    Operator announced connectivity microsite within P2 while the main facility was under construction.

    Supporting source ↗
  3. 2020-07 · actual_completion

    Main facility completed

    Multiplex reports completion of the main P2 building.

    Supporting source ↗
  4. 2020-07-30 · announcement_actual_opening

    Official opening announced

    NEXTDC announced the official opening of P2 Perth.

    Supporting source ↗
  5. 2022-07 · actual_engagement

    Expansion contractor engaged

    Multiplex reports engagement for white-space and infrastructure expansion fit-out works.

    Supporting source ↗
  6. 2023-04 · actual_completion

    Expansion works completed

    Contractor reports completion of the described expansion project.

    Supporting source ↗

Disclosed specifications

Technical space

12,000m²

Operator advertised capacity; architect describes this scale at full fit-out, versus over 10,000m² initially.

Source ↗

Rack capacity

6,300

Advertised capacity, not installed or occupied racks.

Source ↗

Data halls / interconnect rooms

10 / 3

Operator brochure figures; no occupancy claim.

Source ↗

Cooling

Hot-aisle containment; indirect free-cooling CRACs; N+1 facility cooling circuits; N+2 CRAC units per hall

Operator design specifications; includes 24-hour peak-design water storage.

Source ↗

Design heat load

4,000W/m² peak

Design capability, not measured operating density.

Source ↗

Certification

Uptime Institute Tier IV design and constructed facility

Operator-reported certification; current certificate validity not independently checked.

Source ↗

Connectivity

DCI connection to P1 Malaga; AXON access to cloud services

P1 is a separate facility. Opening announcement locates locally hosted Microsoft/AWS on-ramps at P1.

Source ↗

Historical public customer

Superloop — P2 microsite

Identified as first microsite customer in August 2019; current tenancy unconfirmed.

Source ↗

Public sales contact

sales@nextdc.com; Australia 136398; overseas +61 7 3177 4799

General operator business contacts, not site-specific staff.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Perth Data Centres — Facility Overview ↗

Published Date unavailable · Retrieved 2026-10-09

Operator brochure lists P2 at 11 Newcastle Street, target IT capacity 20MW, ten data halls, three interconnect rooms and 12,000m² technical space.

NEXTDC P2 Perth Data Centre | Multiplex ↗

Published Date unavailable · Retrieved 2026-10-09

Contractor locates P2 in Western Australia, Australia; reports July 2020 main completion and April 2023 expansion completion, with 3.9MW initial IT capacity and a further 3.5MW reserved.

ASX Release: 1H26 Record Results ↗

Published 2026-02-25 · Retrieved 2026-10-09

Webpage date is 25 February; announcement body says 26 February 2026. Lists 4MW at P2 among capacity being progressed at 31 December 2025.

City of Perth Ordinary Council Meeting Minutes — 28 July 2020 ↗

Published 2020-07-28 · Retrieved 2026-10-09

Item 13.1 names NEXTDC as owner of 11 and 27 Newcastle Street; records 2018 approvals, an operational communication pod and a nine-level data centre nearing completion. Combined two-lot area is 7,896m², not a standalone P2 footprint.

NEXTDC-published Google Maps directions to P2 ↗

Published Date unavailable · Retrieved 2026-10-09

Operator contact page links this destination. URL encodes destination latitude/longitude separately from viewport center; accessible page contains only a JavaScript shell.

NEXTDC Data Centre – P2 Perth | Hames Sharley ↗

Published Date unavailable · Retrieved 2026-10-09

Architect identifies NEXTDC as client, ten high-density halls, over 10,000m² initial technical space and over 12,000m² at full fit-out; publishes exterior images.

Profile field evidence

Name: P2 Perth Data Centre, Perth CBD | Tier IV Colocation; NEXTDC P2 Perth Data Centre | Multiplex

Aliases: P2 Perth Data Centre, Perth CBD | Tier IV Colocation; NEXTDC P2 Perth Data Centre | Multiplex

Kind: P2 Perth Data Centre, Perth CBD | Tier IV Colocation; Accelerating growth in WA with a new digital interconnectivity hub

Country: NEXTDC P2 Perth Data Centre | Multiplex

Region: NEXTDC P2 Perth Data Centre | Multiplex; Get in Touch: Contact NEXTDC for Your Data Centre Solutions

City: Get in Touch: Contact NEXTDC for Your Data Centre Solutions; NEXTDC Data Centre – P2 Perth | Hames Sharley

Metro: P2 Perth Data Centre, Perth CBD | Tier IV Colocation; Accelerating growth in WA with a new digital interconnectivity hub

Address: Get in Touch: Contact NEXTDC for Your Data Centre Solutions; Perth Data Centres — Facility Overview; City of Perth Ordinary Council Meeting Minutes — 28 July 2020

Operator: P2 Perth Data Centre, Perth CBD | Tier IV Colocation; Accelerating growth in WA with a new digital interconnectivity hub

Owner: City of Perth Ordinary Council Meeting Minutes — 28 July 2020

Business Model: Accelerating growth in WA with a new digital interconnectivity hub

Scale: Accelerating growth in WA with a new digital interconnectivity hub; NEXTDC P2 Perth Data Centre | Multiplex

Statuses: Accelerating growth in WA with a new digital interconnectivity hub; NEXTDC FY25 Annual Report

Summary: P2 Perth Data Centre, Perth CBD | Tier IV Colocation; Accelerating growth in WA with a new digital interconnectivity hub; NEXTDC P2 Perth Data Centre | Multiplex; ASX Release: 1H26 Record Results

Location: NEXTDC-published Google Maps directions to P2; Get in Touch: Contact NEXTDC for Your Data Centre Solutions; City of Perth Ordinary Council Meeting Minutes — 28 July 2020

Stable identifier: 07e778ce-7a1b-4070-8f6a-af3c93e65744