Tokyo Inzai 3 Data Centre — Colt DCS ↗
Published Date unavailable · Retrieved 2026-10-09
Identifies the third of four campus facilities in Chiba New Town; reports 27 MW IT, 8,000 m² whitespace, fully leased status and carrier-neutral connectivity.
Japan / Facility
Colt Tokyo Inzai Data Centre Three · 印西3
Operational hyperscale colocation facility in Chiba New Town, Inzai, Greater Tokyo. Colt announced service commencement on 9 November 2020 with 27 MW IT capacity. The current facility page describes it as fully leased and the third of four campus facilities. The shared campus address does not establish the individual building position.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 27 MW IT load | Inzai 3 facility Operational · cumulative | 2020-11-09 | Reported claim ↗ Excluded from capacity totals. As-of is the dated service-commencement announcement. Reported facility capacity, not metered consumption; current undated facility page repeats 27 MW. |
| 50 MW IT load | Historical Inzai campus total across facilities 1, 2 and 3 Operational · cumulative | 2020-11-09 | Reported claim ↗ Excluded from capacity totals. As-of is announcement date. Campus context only: includes Inzai 3's 27 MW and must not be assigned to this building or added to c1. Subsequent campus expansion makes this a historical total. |
| 27 MW Unspecified power | Inzai 3 planned completed facility capacity Under Construction · cumulative | 2019-06-11 | Reported claim ↗ Excluded from capacity totals. As-of is construction announcement date. Release does not explicitly label this MW figure as IT; later opening announcement does. Overlaps c1. |
Colt described the facility as under construction and targeted completion in Q4 2020.
Supporting source ↗Planned completion quarter in the June 2019 announcement; subsequent opening was announced in November 2020.
Supporting source ↗Colt announced opening with 27 MW IT capacity and more than 90% pre-contracting.
Supporting source ↗Operator reported Certified-level TRUE Zero Waste certification for the campus; certification award date was not established.
Supporting source ↗Facility whitespace, not established land or gross floor area. Website headline inconsistently calls this gross site area; body and datasheet identify whitespace.
Source ↗Four data floors with two 1,000 m² halls per data floor are described in the construction announcement.
Source ↗Voltage does not establish grid capacity in MW.
Source ↗Operator specification.
Source ↗Sheet specifies N+2 chilled-water configuration per hall but elsewhere describes air conditioning as N+1; subsystem distinction requires clarification.
Source ↗Operator datasheet claim; measurement period and independently measured performance not provided.
Source ↗Named carriers and route diversity were not established.
Source ↗Design description; does not establish independent Uptime Institute Tier certification.
Source ↗Operator-reported campus coverage; not a separately inspected building certificate.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Identifies the third of four campus facilities in Chiba New Town; reports 27 MW IT, 8,000 m² whitespace, fully leased status and carrier-neutral connectivity.
Published 2020-11-09 · Retrieved 2026-10-09
Announces service commencement in Japan with 27 MW IT; distinguishes the facility from the then three-building campus total of 50 MW IT.
Published Date unavailable · Retrieved 2026-10-09
Facility sheet reports 27 MW IT, six-storey structure, 8,000 m² whitespace, receiving voltage, resilience and cooling specifications; publication date not established.
Published Date unavailable · Retrieved 2026-10-09
Lists Inzai Data Centers One, Two and Three jointly at 2-3 Otsuka, Inzai-shi, Chiba 270-1352, Japan. Revision dated 11 January 2023; expiry 26 April 2025.
Published Date unavailable · Retrieved 2026-10-09
Places Colt's Inzai operations in Chiba Prefecture and the Greater Tokyo Area, and identifies Inzai 3 as a 27 MW facility opened in November 2020.
Published 2019-06-11 · Retrieved 2026-10-09
Construction announcement targeted Q4 2020 completion, with 27 MW, eight 1,000 m² halls and four data floors. The 30,798 m² site area refers to the campus.
Published 2020-11-10 · Retrieved 2026-10-09
Industry reporting corroborates opening, 27 MW facility capacity and 50 MW campus IT total; identifies an exterior image credited to Colt DCS.
Published 2021-07-14 · Retrieved 2026-10-09
Describes a development and operations JV and Colt's service-provider role, but does not establish ownership of the existing Inzai 3 property.
Published 2026-03-10 · Retrieved 2026-10-09
Reports Certified-level TRUE certification for the operational Inzai campus and 90% waste diversion over 12 consecutive months.
Published Date unavailable · Retrieved 2026-10-09
Explicitly includes Tokyo Inzai 1–3 in the operator's TRUE Zero Waste certification statement. Other energy and PUE figures are global rather than facility-specific.
Name: Tokyo Inzai 3 Data Centre — Colt DCS; Colt Tokyo Inzai 3 Data Centre — Location Data Sheet
Aliases: Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表; Colt Technology Services Group Limited — BSI IS 78946 certificate
Kind: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表
Country: Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表; Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO
Region: Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO
City: Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO
Address: Colt Technology Services Group Limited — BSI IS 78946 certificate
Operator: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表
Business Model: Tokyo Inzai 3 Data Centre — Colt DCS; Colt launches 27MW Inzai 3 data center in Japan — DCD
Scale: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表
Statuses: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表
Summary: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表; Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO
Location: Tokyo Inzai 3 Data Centre — Colt DCS; Colt Technology Services Group Limited — BSI IS 78946 certificate
Stable identifier: 0ace9583-5569-4329-8ef2-eda6a5905cd5