Japan / Facility

Colt Tokyo Inzai 3 Data Centre

Colt Tokyo Inzai Data Centre Three · 印西3

Operational

Operational hyperscale colocation facility in Chiba New Town, Inzai, Greater Tokyo. Colt announced service commencement on 9 November 2020 with 27 MW IT capacity. The current facility page describes it as fully leased and the third of four campus facilities. The shared campus address does not establish the individual building position.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Colt Data Centre Services
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Chiba Prefecture / Greater Tokyo
City / locality
Inzai
Address
2-3 Otsuka, Inzai-shi, Chiba 270-1352, Japan (shared campus address)
Location
Locality and shared campus address established; individual building coordinates not established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
27 MW
IT load
Inzai 3 facility
Operational · cumulative
2020-11-09Reported claim ↗

Excluded from capacity totals. As-of is the dated service-commencement announcement. Reported facility capacity, not metered consumption; current undated facility page repeats 27 MW.

50 MW
IT load
Historical Inzai campus total across facilities 1, 2 and 3
Operational · cumulative
2020-11-09Reported claim ↗

Excluded from capacity totals. As-of is announcement date. Campus context only: includes Inzai 3's 27 MW and must not be assigned to this building or added to c1. Subsequent campus expansion makes this a historical total.

27 MW
Unspecified power
Inzai 3 planned completed facility capacity
Under Construction · cumulative
2019-06-11Reported claim ↗

Excluded from capacity totals. As-of is construction announcement date. Release does not explicitly label this MW figure as IT; later opening announcement does. Overlaps c1.

Development timeline

  1. 2019-06-11 · announcement

    Inzai 3 construction announced

    Colt described the facility as under construction and targeted completion in Q4 2020.

    Supporting source ↗
  2. 2020-Q4 · planned_completion

    Original completion target

    Planned completion quarter in the June 2019 announcement; subsequent opening was announced in November 2020.

    Supporting source ↗
  3. 2020-11-09 · actual_service_commencement_announcement

    Service commencement announced

    Colt announced opening with 27 MW IT capacity and more than 90% pre-contracting.

    Supporting source ↗
  4. 2026-03-10 · announcement

    Inzai campus TRUE certification reported

    Operator reported Certified-level TRUE Zero Waste certification for the campus; certification award date was not established.

    Supporting source ↗

Disclosed specifications

White space

8,000 m²

Facility whitespace, not established land or gross floor area. Website headline inconsistently calls this gross site area; body and datasheet identify whitespace.

Source ↗

Building

Six-storey steel structure with seismic base isolation

Four data floors with two 1,000 m² halls per data floor are described in the construction announcement.

Source ↗

Design compute density

3.375 kW/m²

Disclosed design density; not observed rack density.

Source ↗

Electrical receiving system

66 kV active-standby

Voltage does not establish grid capacity in MW.

Source ↗

Backup generation

N+1 gas turbine generators; 48 hours onsite fuel at full load

Operator specification.

Source ↗

Cooling

Chilled water; hot aisle containment; CRAH on mechanical UPS backup

Sheet specifies N+2 chilled-water configuration per hall but elsewhere describes air conditioning as N+1; subsystem distinction requires clarification.

Source ↗

PUE

Average annual PUE below 1.4

Operator datasheet claim; measurement period and independently measured performance not provided.

Source ↗

Connectivity

Carrier-neutral; national and international carrier choices

Named carriers and route diversity were not established.

Source ↗

Tier design

Colt tier 3 specification

Design description; does not establish independent Uptime Institute Tier certification.

Source ↗

Waste certification

TRUE Zero Waste certification covering Tokyo Inzai 1–3

Operator-reported campus coverage; not a separately inspected building certificate.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Tokyo Inzai 3 Data Centre — Colt DCS ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies the third of four campus facilities in Chiba New Town; reports 27 MW IT, 8,000 m² whitespace, fully leased status and carrier-neutral connectivity.

Decarbonising our Business — Colt DCS ↗

Published Date unavailable · Retrieved 2026-10-09

Explicitly includes Tokyo Inzai 1–3 in the operator's TRUE Zero Waste certification statement. Other energy and PUE figures are global rather than facility-specific.

Profile field evidence

Name: Tokyo Inzai 3 Data Centre — Colt DCS; Colt Tokyo Inzai 3 Data Centre — Location Data Sheet

Aliases: Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表; Colt Technology Services Group Limited — BSI IS 78946 certificate

Kind: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表

Country: Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表; Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO

Region: Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO

City: Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO

Metro: Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO

Address: Colt Technology Services Group Limited — BSI IS 78946 certificate

Operator: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表

Business Model: Tokyo Inzai 3 Data Centre — Colt DCS; Colt launches 27MW Inzai 3 data center in Japan — DCD

Scale: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表

Statuses: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表

Summary: Tokyo Inzai 3 Data Centre — Colt DCS; Coltデータセンターサービス、日本最大級のデータセンター「印西3」のサービス提供開始を発表; Colt Technology Services Group Limited — BSI IS 78946 certificate; Japan’s Booming Data Center Market Draws Multinationals as Digitization, 5G and AI Drive Growth — JETRO

Location: Tokyo Inzai 3 Data Centre — Colt DCS; Colt Technology Services Group Limited — BSI IS 78946 certificate

Stable identifier: 0ace9583-5569-4329-8ef2-eda6a5905cd5