Operational hyperscale colocation facility in Seoul, opened by KT in November 2020 and currently marketed by kt cloud. UPS capacity and receiving-power expansion potential are separate disclosures; current IT load remains unknown. Historical expansion is retained within this facility.
Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
Site / building photo
Yongsan IDC entrance shown in Electronic Times' 2020-11-11 report; capture date undisclosed.
Published date unknown · Captured date unknown · Checked 2026-10-07
Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.
Electronic Times article identifies the facility entrance. Individual photographer attribution and reusable license were not established; permission required before import. Publication and capture dates were not independently established.
Site profile
Operator
kt cloud
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Seoul / Seoul
City / locality
Seoul
Address
33 Wonhyo-ro 41-gil, Yongsan-gu, Seoul 04363, South Korea
Location
PeeringDB facility geocode associated with the corroborated street address; Google Maps and property-marker alignment could not be inspected. Not surveyed or block-verified. Precision: approximate · 37.535381, 126.958805 View location on map →
Parent
Not assigned
Location detail
PeeringDB facility geocode associated with the corroborated street address; Google Maps and property-marker alignment could not be inspected. Not surveyed or block-verified.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
33 Wonhyo-ro 41-gil, Yongsan-gu, Seoul 04363, South Korea
Loading local map…
Capacity evidence
Statements retain their dates, definitions and development scope. Do not add these rows together.
Excluded from capacity totals. As_of is retrieval date of an undated operator page. Converted from approximately 40,800 kW. Redundant UPS capacity does not establish usable IT load or total facility demand.
Excluded from capacity totals. As_of is retrieval date of an undated page. Source says expansion is possible up to 400 MW; this is an upper-limit potential, not a committed project, current connection or IT load.
Development timeline
2020-11-04 · actual_opening
KT DX IDC Yongsan opened
Opening date stated in the KT-supplied announcement caption; some contemporary reporting describes operations beginning November 5.
3Q22 investor presentation targeted completion through Q2 2023 and referred to 38.5 MW upon completion. Actual completion and power basis remain unresolved.
3Q22 presentation; unspecified power basis and unclear cumulative/incremental meaning. No full publication date established, so excluded from dated capacity_claims. Do not add to UPS or grid figures.
Names Yongsan as a Seoul hyperscale DC; lists approximately 40,800 kW aggregate UPS capacity in N+1 configuration, approximately 5,000 racks, seven above-ground and six underground floors, dual 154 kV supply and receiving-power expansion potential up to 400 MW.
KT-supplied announcement identifies KT DX IDC Yongsan in Seoul, Korea, opened November 4; reports 48,000 square metres, capacity for over 100,000 servers, flexible 4–15 kW zones and HCX connectivity.
Lists kt cloud organization, 33 Wonhyo-ro 41-gil, Wonhyoro 3-Ga, Yongsan-gu, Seoul 04363, country KR and geocode 37.535381, 126.958805. Record shows update timestamp 2025-11-30; this is not a publication or survey date.
PDF pages 20 and 36 associate the named 2018 KT Yongsan IDC new-build construction project with 33 Wonhyo-ro 41-gil, Yongsan-gu, Seoul, Wonhyoro 3-ga. Used for address corroboration only.
Page 13 targets Yongsan IDC expansion through Q2 2023 and states 38.5 MW secured upon completion; power basis and incremental versus total interpretation are not specified.
Operator announcement describes an established public cloud zone at Yongsan operated alongside Cheonan CDC for disaster recovery. Search-accessible text was available, but direct open returned no readable body.
Describes customer ICT equipment accommodation, power, cooling, security and backbone connectivity; service-level certification references are not treated as Yongsan-specific certifications.
On-site report locates the facility at the former KT Wonhyo telephone office, describes leased space for unnamed global customers and a planned PUE of 1.4. Exterior photograph credited to reporter Kim Na-in.
Reports eight server rooms, six-metre room height, dual feeds from Mapo and Yongsan substations and backup generation designed for up to 48 hours. Shows facility entrance photograph.
Yongsan IDC entrance shown in Electronic Times' 2020-11-11 report; capture date undisclosed. Original image: https://img.etnews.com/photonews/2011/1354723_20201111182503_267_0003.jpg