Three-building campus in Keihanna, Seika, Kyoto Prefecture, within Japan's Kansai region and marketed in STACK's Osaka market. First building KIX01A is under construction with 18 MW IT capacity and planned readiness in Q2 2027. ESR reports an ultimate 72 MW IT campus; STACK's Japanese materials advertise 80 MW. Future expansion remains planned, and no operational capacity was established.
Sources and references
Source attribution does not imply independent verification or permission to reuse images.
Published 2025-04-28 · Retrieved 2026-10-09
Announces joint construction and operation of KIX01A, 18 MW IT, within a 72 MW IT Keihanna campus; Q2 2027 readiness and LEED Gold pre-certification.
Published Date unavailable · Retrieved 2026-10-09
Lists a three-building 72 MW campus on 5.3 hectares, KIX01A at 18 MW and future expansion at 54 MW; offers colocation and build-to-suit.
Published Date unavailable · Retrieved 2026-10-09
Advertises 80 MW campus IT capacity, 5.3 hectares, dual 77 kV lines, N+1 electrical redundancy and air-cooled chillers.
Published Date unavailable · Retrieved 2026-10-09
Undated accessible brochure reports 72 MW, three buildings, KEPCO 154 kV, water-cooled chillers, carrier-neutral connectivity and annualized PUE target below 1.3.
Published 2025-06-17 · Retrieved 2026-10-09
Reports actual KIX01A construction start on March 1, 2025 and planned Q2 2027 service; identifies 72 MW as IT power.
Published 2026-08-28 · Retrieved 2026-10-09
On-location industry reporting identifies ESR–STACK construction in Seika, Kyoto, on former Panasonic research land west of Colt's separate facility; reiterates 18 MW first building and 72 MW eventual IT capacity.
Published Date unavailable · Retrieved 2026-10-09
Directory lists 3 Chome Hikaridai, 619-0237 Seika and campus sublistings; its Q2 2025 service target is inconsistent with later developer announcements.
Profile field evidence
Name: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan; KIX01 — STACK Infrastructure
Aliases: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan; KIX01 — STACK Infrastructure; ESRとSTACKがけいはんな地区でデータセンター共同展開。「KIX01A」は2027年第2四半期運用開始へ
Kind: KIX01 — STACK Infrastructure
Country: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan
Region: 関西の新興DC集積地、京都府精華町
City: 関西の新興DC集積地、京都府精華町; STACK Infrastructure KIX01 Campus — Data Center Map
Metro: KIX01 — STACK Infrastructure; Osaka, Japan KIX01/CAMPUS brochure
Operator: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan
Business Model: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan; KIX01 — STACK Infrastructure
Scale: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan; KIX01 — STACK Infrastructure
Statuses: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan; KIX01 — STACK Infrastructure; 関西の新興DC集積地、京都府精華町
Summary: ESR and STACK Break Ground on First Phase of 72 MW Data Centre Campus in Kansai, Japan; KIX01 — STACK Infrastructure; Keihanna / KIX01 — STACK Infrastructure Japan; 関西の新興DC集積地、京都府精華町
Location: 関西の新興DC集積地、京都府精華町