← EdgeConneX KUL02 Bukit Jalil campus

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 3 · Current

2026-10-10 02:09 UTC

Published profile snapshot

EdgeConneX KUL02 Bukit Jalil campus · Malaysia · EdgeConneX

EdgeConneX’s Bukit Jalil development is located within MRANTI Technology Park in Greater Kuala Lumpur. Its brochure describes a planned 22.4 MW first phase expanding to 67 MW, without explicitly defining the Bukit Jalil measurement basis. The September 2023 announcement separately describes nearly 70 MW of ultimate IT-load capacity for hyperscale cloud or AI deployments. These overlapping claims must not be added. The directory still lists construction; commissioned capacity and an actual opening remain unconfirmed.

Capacity statements: 4 · Sources: 10

67 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

22.4 MW (exact) · unspecified · Bukit Jalil first phase · None

70 MW (approx) · it · Ultimate Bukit Jalil greenfield development · 2023-09-11

70 MW (exact) · unspecified · Bukit Jalil project in current-and-pipeline table; phase allocation unclear · 2025-12-09

Revision 2

2026-09-11 12:15 UTC

Published profile snapshot

EdgeConneX KUL02 Bukit Jalil campus · Malaysia · EdgeConneX

Initial 22.4 MW is included in the 67 MW ultimate campus plan; source does not explicitly identify the measurement basis.

Capacity statements: 1 · Sources: 3

67 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

Revision 1

2026-09-11 09:58 UTC

Published profile snapshot

EdgeConneX KUL02 Bukit Jalil campus · Malaysia · EdgeConneX

Initial 22.4 MW is included in the 67 MW ultimate campus plan; source does not explicitly identify the measurement basis.

Capacity statements: 1 · Sources: 2

67 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11