Map
Sign in
← Explore registry

Malaysia / Site

DayOne Kempas Tech Park campus

OperationalPlanned

108 MW is a historical directory development figure. Operator confirms campus identity/operation but not this individual MW allocation. Conflicting combined portfolio totals are not assigned to Kempas.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
DayOne
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Johor / Johor Bahru
City / locality
Unknown
Address
Unknown
Location
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Precision: approximate · 1.5598494, 103.7159676
View location on map →
Parent
Not assigned

Location detail

Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
108 MW
Unspecified power
Reported design/development capacity; delivered share unconfirmed
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. 108 MW is a historical directory development figure. Operator confirms campus identity/operation but not this individual MW allocation. Conflicting combined portfolio totals are not assigned to Kempas.

Development timeline

  1. No dated milestones established.

Disclosed specifications

Research clarification · 2026-09-11

Operator confirmed directly; current page does not allocate its shared Johor total to Kempas. Existing 108 MW remains a secondary, unclassified claim.

Source-backed research proposal; publication requires review.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

DayOne · Johor campuses ↗

Published Date unavailable · Retrieved 2026-09-11

Operator identifies Kempas Tech Park among its two Johor campuses.

Google Maps · Kempas Tech Park ↗

Published Date unavailable · Retrieved 2026-09-11

Named place result Kempas Tech Park; POI coordinates 1.5598494, 103.7159676. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.

Operator logo · dayonedc.com ↗

Published Date unavailable · Retrieved 2026-09-11

DayOne operator brand mark. Image reference: https://dayonedc.com/markets/singapores-dayone-breaks-ground-on-first-data-center-in-singapore#header-logo Visually inspected against the cited source and profile identity.

Profile field evidence

Name: DayOne Kempas Tech Park campus — supporting evidence

Kind: DayOne Kempas Tech Park campus — supporting evidence

Country: DayOne Kempas Tech Park campus — supporting evidence

Region: DayOne Kempas Tech Park campus — supporting evidence

Metro: DayOne Kempas Tech Park campus — supporting evidence

Operator: DayOne Kempas Tech Park campus — supporting evidence; DayOne · Johor campuses

Statuses: DayOne Kempas Tech Park campus — supporting evidence

Summary: DayOne Kempas Tech Park campus — supporting evidence

Location: Google Maps · Kempas Tech Park

Operator Logo: Operator logo · dayonedc.com

Stable identifier: 1bce809d-e0d5-481a-8366-7ae7cd1c31d4