Yongin Jukjeon Pacific Sunny Data Center

용인 죽전 퍼시픽써니 데이터센터 · Yongin Jukjeon Data Center · 용인 죽전 데이터센터 · Pacific Sunny Data Centre · Jukjeon Data Centre

Operational

Two-building carrier-neutral hyperscale colocation development commissioned by Pacific Asset Management, with LG CNS responsible for infrastructure and operation and Hyundai E&C responsible for construction. Completion was announced on 2025-10-24. Reported site capacities are 64 MW IT and 100 MW grid receiving capacity; these overlap and must not be added. Operational status is supported by completion and KakaoBank's current Jukjeon IDC disclosure, but utilization and individual-building commissioning are unknown.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
LG CNS
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Gyeonggi-do / Seoul metropolitan area
City / locality
Yongin
Address
233 Daeji-ro, Suji-gu, Yongin, Gyeonggi-do, South Korea
Location
Municipal inventory establishes 233 Daeji-ro; no corroborated facility-marker coordinates were obtained.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
100 MW
Grid connection
Original Yongin Jukjeon development
Planned · cumulative
2022-03-29Reported claim ↗

Excluded from capacity totals. As-of is announcement date. Source explicitly defines receiving capacity as electricity received from the utility; not IT load. Overlaps the later completion claim.

64 MW
IT load
Completed Pacific Sunny site; two buildings collectively
Operational · cumulative
2025-10-24Reported claim ↗

Excluded from capacity totals. As-of is completion announcement date, not a load measurement or commercial opening date. Installed/design capability; utilization and per-building distribution are undisclosed.

100 MW
Grid connection
Completed Pacific Sunny site receiving capacity
Operational · cumulative
2025-10-24Reported claim ↗

Excluded from capacity totals. As-of is completion announcement date. Receiving capacity includes power supporting IT and infrastructure and must not be added to 64 MW IT or the earlier 100 MW claim.

Development timeline

  1. 2022-03-21 · announcement

    Development joint venture announced

    CPP Investments and Pacific Asset Management announced the Jukjeon development joint venture.

    Supporting source ↗
  2. 2024-06 · planned

    Original completion target

    Investor announcement targeted June 2024 completion; subsequent builder disclosures show a later staged completion.

    Supporting source ↗
  3. 2024-12 · actual

    A-building construction completed

    Builder's September 2025 retrospective reports A-building construction finished in December 2024; commercial opening was not specified.

    Supporting source ↗
  4. 2025-09 · planned

    B-building completion target

    September 23 builder article expected B-building completion at the end of September.

    Supporting source ↗
  5. 2025-10-24 · announcement

    Site completion announced

    Hyundai E&C announced recent completion of the two-building project without specifying the exact completion day.

    Supporting source ↗

Disclosed specifications

Developer and investment relationships

Commissioned by Pacific Asset Management; CPP Investments and Shinhan co-investment

Investor announcement also names Dreammark 1 and GS Retail. Current legal title and investor percentages were not established.

Source ↗

Builder

Hyundai Engineering & Construction

Completion announcement.

Source ↗

Buildings

Two data-center buildings and ancillary facilities

Retained as one site; no separate profiles or unsupported parent hierarchy created.

Source ↗

Land area

34,730.3 m²

Municipal inventory; publication/update date unavailable.

Source ↗

Gross floor area — municipal inventory

99,142.19 m²

Differs from builder's completion value of 99,125 m² and original 99,070 m²; measurement scope is unresolved.

Source ↗

Gross floor area — completion release

99,125 m²

Reported as gross floor area, not land area; preserve competing municipal figure.

Source ↗

Floors — municipal inventory

B3/5

Differs from original four below-ground/four above-ground design disclosure; reconciliation requires as-built records.

Source ↗

Power supply

154 kV underground connection from substation

Builder description; no utility interconnection record obtained.

Source ↗

PUE

1.3

Builder-reported performance; measurement period, utilization and independent validation undisclosed.

Source ↗

Resilience

Tier III-or-better design; redundant generators, UPS and chillers

Design/performance assertion; no independent certification certificate located.

Source ↗

Cooling

High-efficiency cooling, free cooling and real-time energy monitoring

Completion release describes installed systems; no confirmed liquid-cooling specification.

Source ↗

Density

Designed for high-density operation of at least 10 kW

Release does not explicitly state the unit denominator; do not automatically interpret as per-rack measured density.

Source ↗

Rack layout — original design

Approximately 1,000 racks per data hall

Planned layout capability, not installed site rack count.

Source ↗

Connectivity

Carrier-neutral

Tenants may choose telecom carriers; named carriers and fiber-route diversity were not disclosed in reviewed primary sources.

Source ↗

Public tenant

KakaoBank

2025 reporting links planned tenancy to this property; current KakaoBank policy lists an operating Jukjeon IDC. Leased capacity and fit-out date unknown.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

지식산업센터현황 — 용인시청 ↗

Published Date unavailable · Retrieved 2026-10-07

Municipal inventory row 20 names Yongin Jukjeon Pacific Sunny Data Center at Suji-gu Daeji-ro 233; lists land 34,730.3 square metres, gross floor area 99,142.19 square metres and B3/5 floors. Row was accessible through a publicly indexed variant of this page.

영상정보처리운영방침 — 카카오뱅크 ↗

Published Date unavailable · Retrieved 2026-10-07

Current policy, with equipment count dated 2026-07-16, includes Jukjeon IDC among locations with operating video equipment; supports tenant presence and operation, not whole-site utilization.

Pacific Sunny Data Centre in Seoul | LG CNS ↗

Published Date unavailable · Retrieved 2026-10-07

Directory identifies Jukjeon-dong, Yongin, Gyeonggi-do and LG CNS; lists parcel 1358 and a nearby separate DAOU Jukjeon facility. Its under-construction status is inconsistent with newer builder evidence.

Profile field evidence

Name: 국내 최대, 멈추지 않는 데이터의 심장: 용인 죽전 퍼시픽써니 데이터센터 준공 스토리; 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공; 지식산업센터현황 — 용인시청

Aliases: LG CNS, 국내 최대 규모 ‘죽전 데이터센터’ 구축 — LG CNS-issued release distributed by Newswire; CPP Investments and Pacific Asset Management To Develop the Largest Carrier-Neutral Data Centre in South Korea; 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공; Pacific Sunny Data Centre in Seoul | LG CNS

Kind: 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공

Country: CPP Investments and Pacific Asset Management To Develop the Largest Carrier-Neutral Data Centre in South Korea; Pacific Sunny Data Centre in Seoul | LG CNS

Region: 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공; Pacific Sunny Data Centre in Seoul | LG CNS

City: 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공; 지식산업센터현황 — 용인시청

Metro: CPP Investments and Pacific Asset Management To Develop the Largest Carrier-Neutral Data Centre in South Korea

Address: 지식산업센터현황 — 용인시청; 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공

Operator: LG CNS, 국내 최대 규모 ‘죽전 데이터센터’ 구축 — LG CNS-issued release distributed by Newswire; CPP Investments and Pacific Asset Management To Develop the Largest Carrier-Neutral Data Centre in South Korea; Pacific Sunny Data Centre in Seoul | LG CNS; LG CNS, 상반기 매출 2.8조원…대외 사업 확대로 실적 견인

Business Model: LG CNS, 국내 최대 규모 ‘죽전 데이터센터’ 구축 — LG CNS-issued release distributed by Newswire; CPP Investments and Pacific Asset Management To Develop the Largest Carrier-Neutral Data Centre in South Korea

Scale: 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공

Statuses: 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공; 영상정보처리운영방침 — 카카오뱅크; 카카오뱅크, '액티브 데이터센터' 추가 구축…은행권 최다 5개 센터 운영

Summary: LG CNS, 국내 최대 규모 ‘죽전 데이터센터’ 구축 — LG CNS-issued release distributed by Newswire; 현대건설, ‘용인 죽전 퍼시픽써니 데이터센터’ 준공; 영상정보처리운영방침 — 카카오뱅크; 카카오뱅크, '액티브 데이터센터' 추가 구축…은행권 최다 5개 센터 운영

Location: 지식산업센터현황 — 용인시청

Stable identifier: 2437ee8b-0e5a-460c-bf8b-974c8d87d55d