← Equinix JH2

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 3 · Current

2026-09-11 12:15 UTC

Published profile snapshot

Equinix JH2 · Malaysia · Equinix

Directory-reported capacity, measurement basis and commissioning require verification.

Capacity statements: 2 · Sources: 4

7 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

7 MW (exact) · it · JH2 first phase; secondary report, not campus build-out · 2026-05-12

Revision 2

2026-09-11 11:26 UTC

Published profile snapshot

Equinix JH2 · Malaysia · Equinix

Directory-reported capacity, measurement basis and commissioning require verification.

Capacity statements: 2 · Sources: 3

7 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

7 MW (exact) · it · JH2 first phase; secondary report, not campus build-out · 2026-05-12

Revision 1

2026-09-11 09:58 UTC

Published profile snapshot

Equinix JH2 · Malaysia · Equinix

Directory-reported capacity, measurement basis and commissioning require verification.

Capacity statements: 1 · Sources: 1

7 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11