Map
Sign in
← Explore registry

Malaysia / Site

KUL1 · Cyberjaya I

Operational

Four-building Cyberjaya I campus: 31 MW critical IT load.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
Property exterior: Vantage KUL1 Cyberjaya I.

Site / building photo

Property exterior: Vantage KUL1 Cyberjaya I.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

vantage-dc.com · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
Vantage Data Centers
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Selangor / Greater Kuala Lumpur
City / locality
Cyberjaya
Address
Unknown
Location
Waze named KUL1 campus point on Jalan Cyber Point 4; property boundary and building allocation require review.
Precision: approximate · 2.9041863, 101.6519276
View location on map →
Parent
Not assigned

Location detail

Waze named KUL1 campus point on Jalan Cyber Point 4; property boundary and building allocation require review.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
31 MW
IT load
Campus full-build IT capacity, four buildings
Operational · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review.

Development timeline

  1. No dated milestones established.

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Vantage Cyberjaya I ↗

Published Date unavailable · Retrieved 2026-09-11

Four-building Cyberjaya I campus: 31 MW critical IT load.

Waze — KUL1 Campus ↗

Published Date unavailable · Retrieved 2026-09-11

KUL1 Campus, Jalan Cyber Point 4, Cyberjaya; public GeoCoordinates 2.9041863, 101.6519276, linked to vantage-dc.com.

Property imagery · vantage-dc.com ↗

Published Date unavailable · Retrieved 2026-09-11

Property exterior: Vantage KUL1 Cyberjaya I. Image reference: https://vantage-dc.com/wp-content/uploads/2021/11/KUL14_DataSheet.jpg Visually inspected against the cited source and profile identity.

Operator logo · vantage-dc.com ↗

Published Date unavailable · Retrieved 2026-09-11

Vantage operator brand mark. Image reference: https://vantage-dc.com/wp-content/uploads/2026/08/Vantage-Logo-Updated-RGB-Reverse-081726-1-1.png Visually inspected against the cited source and profile identity.

Profile field evidence

Name: Vantage Cyberjaya I

Operator: Vantage Cyberjaya I

Country: Vantage Cyberjaya I

Region: Vantage Cyberjaya I

Metro: Vantage Cyberjaya I

City: Vantage Cyberjaya I

Kind: Vantage Cyberjaya I

Statuses: Vantage Cyberjaya I

Summary: Vantage Cyberjaya I

Aliases: Vantage Cyberjaya I

Location: Waze — KUL1 Campus; Vantage Cyberjaya I

Media: Property imagery · vantage-dc.com

Operator Logo: Operator logo · vantage-dc.com

Stable identifier: 30fdf882-cdac-435a-bb8a-de039f25a30d