TY12x — Equinix English facility page ↗
Published Date unavailable · Retrieved 2026-10-09
Lists TY12x at 2-101-8 Izumino, Inzai City, Chiba, Japan; displays 62,054 square feet, N+1 power and N+20% cooling redundancy.
Japan / Facility
TY12x · EQUINIX TY12x
Operational xScale hyperscale colocation facility in Inzai, Chiba, within the Tokyo metro. Opened March 1, 2021. Operator advertises up to 54 MW of IT deployments; the opening announcement describes this as capacity after completion of all phases. Actual current IT load and phase completion remain unknown. Adjacent TY13x is a separate facility.

Site / building photo
TY12x property image 1 published in Obayashi's completed-project portfolio; capture date not disclosed.
Published date unknown · Captured date unknown · Checked 2026-10-09
Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.
www.obayashi.co.jp · Source and attribution ↗Contractor-published project photograph; photographer and reuse license not established. Permission required before import/publication. Publication and capture dates were not independently established.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 54 MW IT load | TY12x total capacity after all phases are completed Planned · cumulative | 2021-03-09 | Reported claim ↗ Excluded from capacity totals. As-of is the dated opening announcement. Describes ultimate supported power for hyperscale customers; IT basis clarified by the operator facility page. Does not establish current delivered or occupied load. |
| 54 MW IT load | TY12x advertised maximum supported IT deployments Unknown · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval of an undated page. Source says up to 54 MW; exact refers to the advertised ceiling. Overlaps c1 and must not be added to it. Completion and energized capacity are unspecified. |
Equinix and GIC closed the Japan joint venture acquiring three sites; subsequent operator announcement identifies TY12x as included.
Supporting source ↗Obayashi project record gives November 2020 completion; this is distinct from service opening.
Supporting source ↗Equinix reports opening its first Asian xScale data center.
Supporting source ↗Current English operator page; phase and area definition unspecified.
Source ↗2021 all-phases plan; differs in scope or timing from current English-page space figure.
Source ↗Operator listing; certificate scope, dates and LEED level not independently established.
Source ↗Historical opening report; current deployed count unknown.
Source ↗Opening-era description.
Source ↗Opening-era report; current configuration unverified.
Source ↗Commitment reported in March 2021; tenant identity and current occupancy undisclosed.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Lists TY12x at 2-101-8 Izumino, Inzai City, Chiba, Japan; displays 62,054 square feet, N+1 power and N+20% cooling redundancy.
Published Date unavailable · Retrieved 2026-10-09
Identifies Tokyo TY12x as an xScale facility in Chiba supporting up to 54 MW of IT deployments for hyperscalers; address includes an additional 210-6 component.
Published 2021-03-09 · Retrieved 2026-10-09
Reports March 1 opening, hyperscale colocation, full-build capacity of 54 MW and more than 186,000 square feet, an unnamed anchor tenant, and inclusion in the Japan Equinix–GIC joint venture.
Published 2020-12-15 · Retrieved 2026-10-09
Discloses Japan sites held by wholly owned subsidiaries of APAC 1 Hyperscale LP, with Equinix 20% and GIC 80%; Equinix manages and operates the facilities.
Published 2023-06-30 · Retrieved 2026-10-09
Identifies TY13x as adjacent to TY12x in Inzai and includes TY12x among opened facilities. Approximately 20 MW leased across TY12x and OS2x is a combined figure, not TY12x capacity.
Published Date unavailable · Retrieved 2026-10-09
Lists Inzai, Chiba; client Equinix Hyperscale 1 Japan special-purpose company; designer Nikken Sekkei; construction completion November 2020. Provides property photographs.
Published 2021-03-11 · Retrieved 2026-10-09
Opening coverage reports five-story base-isolated building, initial 960 racks, eventual approximately 6,500 racks, fan-wall cooling and 48-hour diesel fuel reserve.
Published Date unavailable · Retrieved 2026-10-09
TY12x property image 1 published in Obayashi's completed-project portfolio; capture date not disclosed. Original image: https://www.obayashi.co.jp/works/upload/img/2517_01.jpg
Name: TY12x — Equinix English facility page; TY12x — Equinix French xScale facility page; EQUINIX TY12x — Obayashi project record
Aliases: TY12x — Equinix English facility page; EQUINIX TY12x — Obayashi project record
Kind: TY12x — Equinix French xScale facility page; Hyperscale Connectivity Drives $3 Billion in Data Center Projects by Equinix and JV Partners
Country: TY12x — Equinix English facility page; TY12x — Equinix French xScale facility page
Region: TY12x — Equinix English facility page; EQUINIX TY12x — Obayashi project record
City: TY12x — Equinix English facility page; EQUINIX TY12x — Obayashi project record
Metro: TY12x — Equinix French xScale facility page; Hyperscale Connectivity Drives $3 Billion in Data Center Projects by Equinix and JV Partners
Address: TY12x — Equinix English facility page
Operator: TY12x — Equinix English facility page; Equinix Form 8-K — December 15, 2020 joint venture closing
Owner: Hyperscale Connectivity Drives $3 Billion in Data Center Projects by Equinix and JV Partners; Equinix Form 8-K — December 15, 2020 joint venture closing
Business Model: Hyperscale Connectivity Drives $3 Billion in Data Center Projects by Equinix and JV Partners
Scale: TY12x — Equinix French xScale facility page; Hyperscale Connectivity Drives $3 Billion in Data Center Projects by Equinix and JV Partners
Statuses: Hyperscale Connectivity Drives $3 Billion in Data Center Projects by Equinix and JV Partners; Equinix announcement of TY13x opening
Summary: TY12x — Equinix French xScale facility page; Hyperscale Connectivity Drives $3 Billion in Data Center Projects by Equinix and JV Partners; Equinix announcement of TY13x opening
Location: TY12x — Equinix English facility page
Stable identifier: 359ae5d4-6abf-40dc-8160-55210707af8d