Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

NRTキャンパス · 首都圏NRTデータセンター

OperationalPlanned

Connected data-center campus with three opened buildings: NRT10, NRT12 and NRT14. Current operator information lists additional expansion beyond 120 MW IT capacity. Historical planned capacities differ from current building disclosures; no reconciled aggregate is proposed.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
MC Digital Realty
Ownership
Unknown / not established
Business model / scale
Colocation / Unknown
Region / metro
Chiba Prefecture / Greater Tokyo
City / locality
Inzai
Address
Otsuka, Inzai City, Chiba; NRT10: 2-9-3 Otsuka; NRT12: 2-4-1 Otsuka; NRT14: 2-4-3 Otsuka
Location
Operator building addresses establish Otsuka, Inzai; campus boundary and representative point remain unresolved.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
39 MW
IT load
NRT10 server-power capacity
Operational · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated current operator page; as_of is retrieval date, not commissioning or measurement date.

34 MW
IT load
NRT12 server-power capacity
Operational · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated current operator page; as_of is retrieval date. Earlier construction announcement used 36 MW.

25 MW
IT load
NRT14 server-power capacity
Operational · incremental
2026-04-08Reported claim ↗

Excluded from capacity totals. Opening announcement date; differs from earlier maximum planned 31 MW.

≈100 MW
IT load
NRT Campus after NRT14 opening
Operational · cumulative
2026-04-08Reported claim ↗

Excluded from capacity totals. Opening release describes approximately 100 MW campus server power; this is not measured occupied load.

>120 MW
IT load
Ultimate NRT Campus including additional development
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated campus page; as_of is retrieval date. Expansion target overlaps opened buildings and has no delivery date.

31 MW
IT load
Historical NRT14 maximum planned server power
Planned · incremental
2024-05-09Conflicting claim ↗

Excluded from capacity totals. Announcement date; explicitly a planned maximum, subsequently differing from 25 MW opening disclosure.

104 MW
IT load
Historical maximum campus capacity after NRT14 completion
Planned · cumulative
2024-05-09Conflicting claim ↗

Excluded from capacity totals. Announcement-date forecast, explicitly maximum; differs from approximately 100 MW opening description.

36 MW
Unspecified power
Historical NRT12 development announcement
Under Construction · incremental
2022-10-31Conflicting claim ↗

Excluded from capacity totals. Announcement headline capacity; basis retained as unspecified. Current campus page reports 34 MW server power.

Development timeline

  1. 2019-06-05 · actual reported acquisition

    Initial land acquired

    Operator announced closing on a five-acre Inzai parcel for NRT10; release published June 6.

    Supporting source ↗
  2. 2021-09 · actual opening

    NRT10 opened

    First NRT Campus building.

    Supporting source ↗
  3. 2022-10 · actual construction start

    NRT12 construction began

    Operator announced construction of the second Inzai campus building.

    Supporting source ↗
  4. 2024-03 · actual opening

    NRT12 opened

    Second NRT Campus building.

    Supporting source ↗
  5. 2024-04-01 · actual construction start

    NRT14 construction began

    Construction-start date in operator project table.

    Supporting source ↗
  6. 2025-12 · planned opening

    Original NRT14 opening target

    Historical target; actual opening subsequently announced in April 2026.

    Supporting source ↗
  7. 2026-04-08 · actual opening announcement

    NRT14 opened

    Third NRT Campus building; announcement establishes opening by this date.

    Supporting source ↗
  8. 2026-04-08 · actual opening announcement

    Innovation lab opened in NRT12

    DRIL in Japan established within NRT12.

    Supporting source ↗

Disclosed specifications

Building floor areas

NRT10: 37,850 m²; NRT12: 27,571 m²; NRT14: 22,867 m²

Operator campus-page gross floor areas; not summed into a campus area.

Source ↗

Rack capacity

NRT10 approximately 4,800; NRT12 approximately 4,000

Disclosed rack capacities, not occupied rack counts.

Source ↗

NRT14 racks and density

Approximately 2,800 racks; colocation density up to 150 kW/rack

Opening disclosure; maximum density is not a uniform campus density.

Source ↗

NRT14 cooling

Hybrid liquid and air cooling

Opening release describes support for high-density AI workloads.

Source ↗

NRT14 renewable energy

Planned effective 100% renewable electricity for colocation data halls

Scoped operator commitment; does not establish whole-campus physical renewable supply or independently verified performance.

Source ↗

NRT14 building-area discrepancy

6,100 m² on Digital Realty facility page versus 22,867 m² gross floor area in opening release

Definitions or stale content unresolved; preserve both disclosures.

Source ↗

NRT14 resilience and compliance

N+1 UPS and cooling; SOC2 and PCI-DSS listed

Operator facility-page claims; certificates and audit scope were not inspected.

Source ↗

Initial development land

Five acres, approximately 20,000 m²

2019 acquired NRT10 parcel only; not established as current total campus land area.

Source ↗

GLBB connectivity

GLBB Japan PoP; F::Xpress internet and dedicated lines

Joint release dated April 9, 2025.

Source ↗

JPNAP connectivity

NRT Campus connection point for JPNAP Tokyo

January 2022 announcement targeted May 2022 service commencement; actual launch was not independently checked.

Source ↗

Corporate structure

MC Digital Realty is a 50/50 Mitsubishi Corporation–Digital Realty joint venture

Corporate ownership does not establish current legal title to every campus parcel.

Source ↗

Public business contact

marketing@mc-digitalrealty.com

Published product/services inquiry address; no contact made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

NRT Campus — MC Digital Realty ↗

Published Date unavailable · Retrieved 2026-10-09

Lists Inzai campus, three opened buildings, current server-power capacities and an expansion plan exceeding 120 MW IT.

NRT14 Data Center | 2-4-3 Otsuka ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies NRT14 address; lists N+1 UPS/cooling, SOC2 and PCI-DSS, and 6,100 square metres as total building size.

Profile field evidence

Name: NRT Campus — MC Digital Realty; MC Digital Realty opens NRT14, third building at NRT Campus

Aliases: NRT Campus — MC Digital Realty

Kind: NRT Campus — MC Digital Realty; MC Digital Realty opens NRT14, third building at NRT Campus

Country: MC Digital Realty opens NRT14, third building at NRT Campus; GLBB Japan opens first Inzai-area PoP at NRT Campus

Region: MC Digital Realty opens NRT14, third building at NRT Campus; NRT10 Data Center | 2-9-3 Otsuka; NRT12 Data Center | 2-4-1 Otsuka; NRT14 Data Center | 2-4-3 Otsuka

City: MC Digital Realty opens NRT14, third building at NRT Campus; NRT10 Data Center | 2-9-3 Otsuka; NRT12 Data Center | 2-4-1 Otsuka; NRT14 Data Center | 2-4-3 Otsuka

Metro: MC Digital Realty closes on five-acre land parcel in Tokyo

Address: NRT10 Data Center | 2-9-3 Otsuka; NRT12 Data Center | 2-4-1 Otsuka; NRT14 Data Center | 2-4-3 Otsuka

Operator: MC Digital Realty opens NRT14, third building at NRT Campus; JPNAP Tokyo service launches at MC Digital Realty NRT Campus

Business Model: MC Digital Realty opens NRT14, third building at NRT Campus; GLBB Japan opens first Inzai-area PoP at NRT Campus

Statuses: NRT Campus — MC Digital Realty; MC Digital Realty opens NRT14, third building at NRT Campus

Summary: NRT Campus — MC Digital Realty; MC Digital Realty opens NRT14, third building at NRT Campus; MC Digital Realty begins construction of NRT14

Location: NRT10 Data Center | 2-9-3 Otsuka; NRT12 Data Center | 2-4-1 Otsuka; NRT14 Data Center | 2-4-3 Otsuka

Stable identifier: 3aef23bf-877a-4c5a-bd28-993ad014b761