Netherlands / Site

CyrusOne Amsterdam I · Amsterdam I Data Center · CyrusOne AMS1 - Halfweg

OperationalPlanned

CyrusOne's purpose-built PolanenPark campus in Halfweg serves the Amsterdam market. The operator describes potential ultimate IT capacity of 54 MW across two buildings, rather than confirmed energized capacity. Existing operations are supported by operator service descriptions and historical tenant reporting. A January 2026 permit authorizes building B at Linieweg 3 within a two-data-center campus; its construction and commissioning status remain unresolved.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
CyrusOne
Ownership
CyrusOne
Business model / scale
Colocation / Unknown
Region / metro
Noord-Holland / Amsterdam
City / locality
Halfweg
Address
Linieweg 1, 1165 AA Halfweg, Netherlands
Location
PeeringDB facility geocode associated with Linieweg 1, independently corroborated as the operator's street address; marker position and building footprint were not verified. An older syndicated datasheet gives a different nearby point.
Precision: approximate · 52.383057, 4.703489
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode associated with Linieweg 1, independently corroborated as the operator's street address; marker position and building footprint were not verified. An older syndicated datasheet gives a different nearby point.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Linieweg 1, 1165 AA Halfweg, Netherlands

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
54 MW
IT load
Ultimate two-building AMS1 campus
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval-date observation of an undated operator page. The narrative explicitly describes potential capacity; this is not evidence of energized load.

60 MW
Grid connection
AMS1 active/active A&B mains supply arrangement
Unknown · unclear
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval-date observation of an undated datasheet specifying diversely routed 20 kV incomers and 60 MW capacity. Redundancy and per-feed versus total interpretation require review; no energization date is supplied.

≈72 MW
Unspecified power
Two-building PolanenPark campus proposed in 2018
Planned · cumulative
2018-12-06Estimate claim ↗

Excluded from capacity totals. Announcement-date estimated capacity. Basis is unstated; cannot be reconciled automatically with later IT and grid figures.

3 MW
Unspecified power
Historical Cyxtera leased portion of the Linieweg campus
Operational · incremental
2023-06-09Reported claim ↗

Excluded from capacity totals. Publication-date tenant footprint, with a proposed subsequent exit. Overlaps campus capacity and does not establish current energized load.

Development timeline

  1. 2018-12-06 · announcement

    PolanenPark land acquisition announced

    SADC announced CyrusOne's purchase of 6.3 hectares for a two-building campus.

    Supporting source ↗
  2. 2018-12 · actual_construction_start_reported

    Construction began

    Construction coverage reports works starting in December 2018.

    Supporting source ↗
  3. 2019-09 · planned_completion

    Original construction completion target

    Contractor coverage describes September 2019 as the target, not proof of commissioning.

    Supporting source ↗
  4. 2019-10 · actual_operation_reported

    Cyxtera operations reportedly launched

    DCD reports operation of a leased portion beginning in October 2019; a directory instead dates first-building operation to 2021.

    Supporting source ↗
  5. 2020-09-15 · announcement

    Waste-heat feasibility agreement

    CyrusOne, Haarlem and PolanenPark agreed to study a heat network for 15,000 homes; delivery was conditional.

    Supporting source ↗
  6. 2023-06-09 · announcement

    Cyxtera tenant exit reported

    DCD reported plans to reject the AMS1 lease effective September 6, 2023; this does not establish campus closure.

    Supporting source ↗
  7. 2026-01-23 · actual_permit_decision

    Building B permit granted

    Permit for a data center at Linieweg 3 within the existing two-data-center campus, applicant CyrusOne AMS3 B.V.; published January 30.

    Supporting source ↗

Disclosed specifications

Ultimate technical space

29,350 m² across two buildings

Operator campus potential; not confirmed completed or fitted-out area.

Source ↗

Land acquisition

6.3 hectares

2018 land purchase announcement; current cadastral extent unverified.

Source ↗

Original proposed development area

33,445 m²

2018 proposal; differs in scope and date from current technical-space figure.

Source ↗

Cooling

Ring chilled-water system, N+1 free-cooling air-cooled chillers, circulation pumps N+1

Operator design specifications; no measured PUE or WUE supplied.

Source ↗

Backup power

Distributed redundant UPS with 10-minute battery backup; generators with 48-hour fuel autonomy

Operator datasheet design claims.

Source ↗

Raised floor and clear height

900 mm raised floor; 3,600 mm data-hall clear height

Operator design specification.

Source ↗

Connectivity

Carrier-neutral diverse fiber; A&B meet-me rooms; euNetworks, Zayo and Megaport mentioned

Undated operator datasheet; current carrier availability requires confirmation.

Source ↗

Certification claims

ISO 9001, ISO 14001, ISO 45001, ISO 27001, SOC2 and PCI

Operator datasheet lists compliance certifications; certificates, expiry and scope were not inspected. Tier III is described as design resilience, not independently verified certification.

Source ↗

Renewable electricity

Operator reports 100% renewable energy since 2021

Procurement mechanism and independently audited site allocation were not established.

Source ↗

Public business contact

info@cyrusone.com; +31 (20) 899 0895

Published association contact; no contact was made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Amsterdam, Netherlands: AMS1 | CyrusOne ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies AMS1 in the Netherlands, describes potential 54 MW IT capacity across two buildings, on-site engineering and sustainability features.

AMS1 CyrusOne Data Center datasheet ↗

Published Date unavailable · Retrieved 2026-10-09

Operator supplies the Halfweg address, ultimate technical space and IT capacity, redundant electrical supplies, cooling, connectivity and compliance specifications.

CyrusOne - Parkmanagement Polanenpark ↗

Published Date unavailable · Retrieved 2026-10-09

Business-park directory identifies CyrusOne Amsterdam I at Linieweg 1, 1165 AA Halfweg, and places PolanenPark in Haarlemmermeer.

CyrusOne Amsterdam I - PeeringDB ↗

Published Date unavailable · Retrieved 2026-10-09

Facility record supplies Halfweg, Noord-Holland, address and geocode 52.383057, 4.703489; record displays an update timestamp of 2025-09-26.

Profile field evidence

Name: Amsterdam, Netherlands: AMS1 | CyrusOne; AMS1 CyrusOne Data Center datasheet

Aliases: CyrusOne - Parkmanagement Polanenpark; CyrusOne - Dutch Data Center Association; CyrusOne AMS1 - Halfweg Data Center in Amsterdam

Kind: Amsterdam, Netherlands: AMS1 | CyrusOne; AMS1 CyrusOne Data Center datasheet

Country: Amsterdam, Netherlands: AMS1 | CyrusOne; AMS1 CyrusOne Data Center datasheet

Region: CyrusOne Amsterdam I - PeeringDB; Vergunning verleend - Linieweg 3, Halfweg - het realiseren van een datacenter

City: AMS1 CyrusOne Data Center datasheet; CyrusOne - Parkmanagement Polanenpark

Metro: Amsterdam, Netherlands: AMS1 | CyrusOne; CyrusOne breidt uit in Nederland met next-gen datacenter op PolanenPark in samenwerking met SADC

Address: AMS1 CyrusOne Data Center datasheet; CyrusOne - Parkmanagement Polanenpark

Operator: Amsterdam, Netherlands: AMS1 | CyrusOne; CyrusOne - Parkmanagement Polanenpark

Owner: CyrusOne breidt uit in Nederland met next-gen datacenter op PolanenPark in samenwerking met SADC; Cyxtera rejects leases in Washington and Amsterdam - DCD

Business Model: CyrusOne - Dutch Data Center Association; Cyxtera rejects leases in Washington and Amsterdam - DCD

Statuses: Amsterdam, Netherlands: AMS1 | CyrusOne; Cyxtera rejects leases in Washington and Amsterdam - DCD; Vergunning verleend - Linieweg 3, Halfweg - het realiseren van een datacenter

Summary: Amsterdam, Netherlands: AMS1 | CyrusOne; AMS1 CyrusOne Data Center datasheet; Cyxtera rejects leases in Washington and Amsterdam - DCD; Vergunning verleend - Linieweg 3, Halfweg - het realiseren van een datacenter

Location: CyrusOne Amsterdam I - PeeringDB; AMS1 CyrusOne Data Center datasheet

Stable identifier: 3b5e5ac1-5c87-465d-9b22-de335c0b0b57