Finland / Facility

Telia Helsinki Data Center

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

Telia HDC

Operational

Operational colocation facility in Pitäjänmäki, Helsinki, opened on 5 June 2018. Telia reports 24 MW IT capacity. Industry reporting describes a 4 MW expansion and 28 MW installed total, which remain unreconciled with operator documentation. Numerical coordinates are unverified.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Telia Finland Oyj
Ownership
Unknown / not established
Business model / scale
Colocation / Unknown
Region / metro
Uusimaa / Helsinki metropolitan area
City / locality
Helsinki
Address
Valimotie 3-5, 00380 Helsinki, Finland
Location
Operator address corroborated by Helsinki municipal permit evidence; no verified geographic point.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
24 MW
IT load
Whole facility advertised redundant critical IT capacity
Operational · cumulative
2026-10-07Conflicting claim ↗

Excluded from capacity totals. As_of is retrieval date of undated operator brochure; advertised capacity is not measured current load. Conflicts with industry-reported 28 MW installed total.

≥6 MW
Unspecified power
Facility starting capacity before opening
Planned · cumulative
2018-05-09Reported claim ↗

Excluded from capacity totals. As_of is release date. Starting capacity is stated alongside planned IT capacity, but its basis is not separately explicit; not proof of current installed load.

4 MW
Unspecified power
Additional facility capacity announced in 2024
Under Construction · incremental
2024-05-03Reported claim ↗

Excluded from capacity totals. As_of is article date; completion was anticipated for early 2025. Basis and relationship to existing advertised 24 MW require reconciliation.

28 MW
Unspecified power
Reported facility installed capacity after expansion
Operational · cumulative
2025-05-27Conflicting claim ↗

Excluded from capacity totals. As_of is article date. Industry report describes installed total; operator documents continue to advertise 24 MW IT and do not independently confirm this electrical total.

100 MW
Unspecified power
Operator-described total power capacity
Operational · cumulative
2024-09-26Reported claim ↗

Excluded from capacity totals. As_of is whitepaper publication date. Source distinguishes this from 24 MW IT but does not define contracted grid capacity, redundancy or available usable facility load. Do not convert transformer MVA into MW.

100 MW
IT load
Historical potential ultimate site IT capacity
Planned · cumulative
2024-05-03Reported claim ↗

Excluded from capacity totals. As_of is reporting date of a historical operator statement: site could eventually support up to 100 MW IT. Conditional ceiling, not committed development or installed capacity; distinct from whitepaper total-power claim.

Development timeline

  1. 2016–2018 · actual_construction

    Facility development

    Ramboll reports project management and construction work during 2016–2018.

    Supporting source ↗
  2. 2018-06-05 · actual_opening

    Operations begin

    Telia release announces the facility starts operations that day.

    Supporting source ↗
  3. early 2023 · actual_commissioning

    District heating supply begins

    Helen confirms waste heat entered Helsinki’s district heating network from early 2023.

    Supporting source ↗
  4. 2024-05-03 · announcement

    4 MW expansion reported

    Industry report describes additional capacity under development, scheduled for early 2025.

    Supporting source ↗
  5. early 2025 · planned_completion

    Expansion target

    Completion target reported in May 2024; exact commissioning date remains unconfirmed.

    Supporting source ↗
  6. 2025-05-26 · announcement

    Heat recovery capacity increased

    Telia reports heat recovery capability up to 90% with increased data-hall capacity and equipment.

    Supporting source ↗

Disclosed specifications

Building and white-space area

Approximately 34,000 m² building; 15,000 m² data-center area

Operator colocation brochure; older brochure gives 34,340 m² total building area. Building area must not be treated as white space.

Source ↗

Maximum rack and server capacity

5,000 racks; 200,000 servers

Advertised maxima, not installed or occupied counts.

Source ↗

Electrical infrastructure

110 kV supply; two 50 MVA main transformers

Nameplate apparent power and redundant infrastructure do not establish contracted usable MW.

Source ↗

Cooling

Closed-loop water cooling with heat reuse; WUE below 0.1 L/kWh

Operator whitepaper claim; site-wide measured period for WUE is unspecified.

Source ↗

AI rack cooling options

Air cooling up to 30 kW/rack; rear-door cooling up to 50 kW/rack; direct-to-chip cooling up to 100 kW/rack

Available configurations described in September 2024; not a statement that all racks operate at these densities.

Source ↗

Design efficiency

Design PUE target below 1.2

Design target, distinct from observed operating PUE.

Source ↗

Energy

Carbon-neutral renewable energy

Operator statement; supply mix and contractual instruments not independently audited here.

Source ↗

Heat recovery

Capacity to recover and reuse up to 90% of waste heat

Telia May 2025 claim, previously approximately 60%; future 28,000-apartment target is not current delivery.

Source ↗

Standards and certifications

Tier III and EN 50600 design; LEED Gold, CEEDA Gold; ISO 9001, ISO 27001, ISO 22301, PCI DSS and Katakri 2020 advertised

Operator brochure statements; Tier design is not evidence of independent Uptime Institute certification. Certification scope and validity were not checked against registries.

Source ↗

Connectivity and services

Multiple operators; local and international backbone connections; colocation from 12 RU to dedicated halls; smart hands

Operator brochure service offering.

Source ↗

Public customer

UpCloud FI-HEL2

UpCloud identifies Telia Helsinki Data Center as its FI-HEL2 hosting facility.

Source ↗

Developer and project management

Telia development; Ramboll project management and construction oversight

Historical project relationship; does not establish legal property ownership.

Source ↗

Historical property company

Kiinteistö Oy Pitäjänmäen Data Central c/o TeliaSonera Finland Oyj

Named in 2017 municipal permit search extract; current ownership unestablished.

Source ↗

Business contact route

https://telia.fi/datacenter

Public operator contact route advertised in brochure; no form submitted.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Telia Helsinki Data Center ↗

Published Date unavailable · Retrieved 2026-10-07

Search-indexed operator page identifies Valimotie 3-5, 00380 Helsinki, Finland and 24 MW IT capacity; direct opening failed.

Telia Helsinki Data Center colocation brochure ↗

Published Date unavailable · Retrieved 2026-10-07

Operator brochure names Telia Finland Oyj, describes colocation services, 24 MW redundant critical IT power, approximately 34,000 m² building and 15,000 m² data-center area.

Telia HDC: Pohjoismaiden suurin datakeskus ↗

Published Date unavailable · Retrieved 2026-10-07

Project manager identifies Helsinki facility, Telia client, 2016–2018 project period and 2018 completion; confirms involvement in 110 kV supply design.

Telia Data Center brochure ↗

Published Date unavailable · Retrieved 2026-10-07

Operator reports 34,340 m² building, 15,000 m² white space, maximum 5,000 racks, two 50 MVA transformers, 110 kV supply and design PUE below 1.2.

UpCloud Data Center Information ↗

Published Date unavailable · Retrieved 2026-10-07

UpCloud identifies its FI-HEL2 deployment with Telia Helsinki Data Center and describes carrier-neutral access to providers and internet exchanges.

Profile field evidence

Name: Cooling options for AI/GPU loads in Telia Helsinki Data Center; Telia Helsinki Data Center colocation brochure

Aliases: Cooling options for AI/GPU loads in Telia Helsinki Data Center

Kind: Telia Helsinki Data Center colocation brochure; Telia HDC: Pohjoismaiden suurin datakeskus

Country: Cooling options for AI/GPU loads in Telia Helsinki Data Center; Telia HDC: Pohjoismaiden suurin datakeskus

Region: Welcome to Helsinki – tips for newcomers

City: Cooling options for AI/GPU loads in Telia Helsinki Data Center; Telia HDC: Pohjoismaiden suurin datakeskus

Metro: Welcome to Helsinki – tips for newcomers

Address: Telia Helsinki Data Center; Valimotie 3-5, 46. Pitäjänmäki, Kiinteistö Oy Pitäjänmäen Data Central, lupa yksityisten rakenteiden sijoittamiseksi yleiselle alueelle

Operator: Telia Helsinki Data Center colocation brochure; Helsinki Data Center lämmittää nyt jopa 14 000 kerrostalokaksiota – Hukkalämmön talteenoton kapasiteettia nostettu

Business Model: Telia Helsinki Data Center colocation brochure

Statuses: Suomen suurin avoin datakeskus aloitti toimintansa Helsingissä; Helsinki Data Center lämmittää nyt jopa 14 000 kerrostalokaksiota – Hukkalämmön talteenoton kapasiteettia nostettu; Helen and Telia’s Collaboration Brings Even More Data Center Heat to Helsinki Residents

Summary: Cooling options for AI/GPU loads in Telia Helsinki Data Center; Suomen suurin avoin datakeskus aloitti toimintansa Helsingissä; Telia Helsinki Data Center colocation brochure; Telia to add 4MW to Helsinki data center; Telia increases capacity of district heating solution at data center in Helsinki

Location: Telia Helsinki Data Center; Valimotie 3-5, 46. Pitäjänmäki, Kiinteistö Oy Pitäjänmäen Data Central, lupa yksityisten rakenteiden sijoittamiseksi yleiselle alueelle