True IDC EEC mega campus — supporting evidence ↗
Published 2026-03-31 · Retrieved 2026-09-11
True IDC announced up to 250 MW total power and a first-phase operating target in 2027.
Thailand / Site
Total facility power, not IT load. EEC location confirmed; CSV Chon Buri province attribution needs property-level corroboration.

Site / building photo
Property exterior: True IDC EEC mega campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
www.trueidc.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 250 MW Facility power | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Total facility power, not IT load. EEC location confirmed; CSV Chon Buri province attribution needs property-level corroboration. |
No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published 2026-03-31 · Retrieved 2026-09-11
True IDC announced up to 250 MW total power and a first-phase operating target in 2027.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: True IDC EEC mega campus. Image reference: https://www.trueidc.com/webimg/News/20260331-New-Data-Center-Groundbreaking/Groundbreaking-Site-Construction2.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
True operator brand mark. Image reference: https://www.trueidc.com/en/news-detail/232/images/True-IDC-Logo-194x59-2025.png Visually inspected against the cited source and profile identity.
Name: True IDC EEC mega campus — supporting evidence
Kind: True IDC EEC mega campus — supporting evidence
Country: True IDC EEC mega campus — supporting evidence
Metro: True IDC EEC mega campus — supporting evidence
Operator: True IDC EEC mega campus — supporting evidence
Statuses: True IDC EEC mega campus — supporting evidence
Summary: True IDC EEC mega campus — supporting evidence
Media: Property imagery · www.trueidc.com
Operator Logo: Operator logo · www.trueidc.com
Stable identifier: 3ff2d201-5c7d-40a9-b10c-d65ee5abba86