MY-01 opened as the first of three Sedenak facilities; combined full-build campus capacity is 90 MW.
Malaysia / Site
BrightRay Sedenak campus
Campus total, not 90 MW per building. Company identity and first-phase opening corroborated by named industry reporting; IT basis not explicit.

Site / building photo
Property exterior: BrightRay Sedenak MY-01–MY-03 campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
www.datacenterdynamics.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 90 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Campus total, not 90 MW per building. Company identity and first-phase opening corroborated by named industry reporting; IT basis not explicit. |
No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
MY-01 opened as the first of three Sedenak facilities; combined full-build campus capacity is 90 MW.
Published Date unavailable · Retrieved 2026-09-11
Named place result BRIGHTRAY SCIENCE DATA CENTRE; POI coordinates 1.6990433, 103.4048552. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: BrightRay Sedenak MY-01–MY-03 campus. Image reference: https://media.datacenterdynamics.com/media/images/brightray_johor.2e16d0ba.fill-1200x630.png Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
BrightRay operator brand mark. Image reference: https://cdn.baxtel.com/data-centers/brightray-dc/logo/display_brightray-dc-logo..jpeg Visually inspected against the cited source and profile identity.
Name: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Aliases: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Kind: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Country: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Region: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Metro: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Operator: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Statuses: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Summary: BrightRay Sedenak MY-01–MY-03 campus — supporting evidence
Location: Google Maps · BRIGHTRAY SCIENCE DATA CENTRE
Media: Property imagery · www.datacenterdynamics.com
Operator Logo: Operator logo · baxtel.com
Stable identifier: 44f77164-8712-4149-b5d6-85cc39e85860