BDx CGK1 — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
BDx's Indonesia inventory lists CGK1 total capacity 10 MW.
Operator-advertised design capacity; delivered/occupied load not established.

Site / building photo
Property exterior: BDx CGK1.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
www.bdxworld.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Named-facility directory point; independent property/block verification pending.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 10 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Operational · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Operator-advertised design capacity; delivered/occupied load not established. |
| 8 MW IT load | CGK1 operator technical capacity Operational · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation. |
Source-backed research proposal; publication requires review.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
BDx's Indonesia inventory lists CGK1 total capacity 10 MW.
Published Date unavailable · Retrieved 2026-09-11
BDx CGK1 - Jakarta City Center, Jakarta City Center. Public point -6.210889, 106.816168; directory updated 2025-09-26T23:00:05Z. Not surveyed coordinates.
Published Date unavailable · Retrieved 2026-09-11
Current operator profile states 8 MW IT capacity at Medan Merdeka Barat 21.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: BDx CGK1. Image reference: https://www.bdxworld.com/wp-content/uploads/2026/07/CGK1.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
BDx operator brand mark. Image reference: https://www.bdxworld.com/wp-content/uploads/2026/06/bdx-light-full.svg Visually inspected against the cited source and profile identity.
Name: BDx CGK1 — supporting evidence
Kind: BDx CGK1 — supporting evidence
Country: BDx CGK1 — supporting evidence
Region: BDx CGK1 — supporting evidence
Metro: BDx CGK1 — supporting evidence
City: BDx CGK1 — supporting evidence
Operator: BDx CGK1 — supporting evidence; BDx · CGK1 technical profile
Statuses: BDx CGK1 — supporting evidence
Summary: BDx CGK1 — supporting evidence
Location: BDx CGK1 — supporting evidence; PeeringDB named-site geocode
Address: PeeringDB named-site geocode
Media: Property imagery · www.bdxworld.com
Operator Logo: Operator logo · www.bdxworld.com
Stable identifier: 4917beec-8e36-46e6-91d6-e2fd1b7b3e59