Finland / Site

Pure DC SJK01 Seinäjoki campus

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

SJK01 · FIN01

Under ConstructionPlanned

AI campus in Kivenneva with Phase 1 under construction and later campus expansion planned. Operator reports 110 MW IT for the fully leased initial phase and an ultimate target above 550 MW IT, conditional on permissions and contracting.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
Municipal-page construction photograph identified as Pure DC's first phase in Kivenneva; image fetch failed, so visual suitability remains unconfirmed.

Site / building photo

Municipal-page construction photograph identified as Pure DC's first phase in Kivenneva; image fetch failed, so visual suitability remains unconfirmed.

Published date unknown · Captured date unknown · Checked 2026-10-07

Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.

www.seinajoki.fi · Source and attribution ↗
Image rights and date notes

Published by the City of Seinäjoki; photographer and reusable license not established. Capture date unknown. Review and obtain reuse permission before import. Publication and capture dates were not independently established.

Site profile

Operator
Pure Data Centres Group (Pure DC)
Ownership
Pure DC (FIN01) Projects Oy — confirmed owner of the initial development plot; wider campus ownership extent unresolved
Business model / scale
Colocation / Hyperscale
Region / metro
South Ostrobothnia (Etelä-Pohjanmaa) / Unknown
City / locality
Seinäjoki
Address
Unknown
Location
Coordinates printed in a September 2025 FIN01 presentation hosted by Baxtel. Municipal evidence corroborates the Kivenneva development area east of Eskoo interchange, between Itäväylä, Ämmäläntie and Seinäjoentie; the specific point has not been independently matched to a parcel or facility marker.
Precision: approximate · 62.72782, 22.88929
View location on map →
Parent
Not assigned

Location detail

Coordinates printed in a September 2025 FIN01 presentation hosted by Baxtel. Municipal evidence corroborates the Kivenneva development area east of Eskoo interchange, between Itäväylä, Ämmäläntie and Seinäjoentie; the specific point has not been independently matched to a parcel or facility marker.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
110 MW
IT load
Phase 1 of SJK01 campus
Under Construction · cumulative
2026-10-07Reported claim ↗

Excluded from capacity totals. As_of is retrieval date of the undated operator facility page. Design/delivery capacity of the initial phase, not evidence of commissioned load; included within ultimate campus target.

>550 MW
IT load
Ultimate SJK01 campus including Phase 1
Planned · cumulative
2026-07-14Reported claim ↗

Excluded from capacity totals. As_of is announcement date. Target above 550 MW requires further permissions and contracting; must not be added to Phase 1.

Development timeline

  1. 2025-12-15 · actual_planning_approval

    Kivenneva zoning amendment approved

    City council approved plan 16003 for the relevant development area; this is zoning evidence, not proof of full-campus construction approval.

    Supporting source ↗
  2. 2026-04 · actual_land_transaction

    Initial development plot sold

    City FAQ dates the sale to Pure DC’s project company to April 2026.

    Supporting source ↗
  3. 2026-07-14 · announcement

    SJK01 campus launch

    Pure DC announced the initial leased phase and conditional wider campus expansion.

    Supporting source ↗
  4. 2027–2028 · planned_operation

    First-phase operation expected

    Current municipal FAQ gives this operating window; no actual commissioning established.

    Supporting source ↗

Disclosed specifications

Initial development land

Approximately 22.3 hectares

Sold plot permitting three data-center buildings; distinct from ultimate campus footprint.

Source ↗

Wider development land

Approximately 155 hectares

Municipal preliminary agreements; not evidence that all land has been transferred.

Source ↗

Operator campus footprint

370 acres

Operator description of full campus.

Source ↗

Electrical capacity

More than 700 MVA

Announcement describes access to renewable power; apparent power is not MW IT or independently established delivered power.

Source ↗

Cooling

Air or direct liquid cooling; closed-loop systems

Operator design claim includes zero water use in operation; no measured operating performance established.

Source ↗

Development modules

Repeatable 40 MW AI-ready modules

Design units within one campus; not separate additional campus capacity.

Source ↗

Local development partner

SDC Project Ventures / SDC Ventures

Local partner identified by municipal development organization and operator.

Source ↗

Heat reuse

District heating integration intended

Municipal FAQ describes prospective heat use rather than an operating heat-export system.

Source ↗

Earlier readiness schedule

30 MW by December 2026; 80 MW by Q3 2027; 110 MW by Q4 2027

Targets printed in September 2025 presentation; not actual delivery. Current municipal window is 2027–2028. Month-dated historical figures are not promoted to day-dated capacity claims.

Source ↗

Earlier campus design

500 MW+ IT; five compounds

September 2025 presentation predates current 550 MW+ target; do not sum these alternative campus descriptions.

Source ↗

Connectivity concept

Carrier-neutral development site

Historical presentation mentions national trunk-network meeting points in Seinäjoki, without confirmed on-campus carriers.

Source ↗

Phase 1 financing

€1.3 billion committed senior debt

Industry report dated 22 July 2026; financing does not establish operational readiness.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Finland — Seinäjoki (SJK01) ↗

Published Date unavailable · Retrieved 2026-10-07

Official facility page reports Phase 1 development underway, 110 MW IT fully leased, 370 acres, 700 MVA accessible renewable power and partnership with SDC Ventures.

Datakeskukset — Seinäjoen kaupunki ↗

Published Date unavailable · Retrieved 2026-10-07

Municipal FAQ confirms construction in Kivenneva, initial plot ownership, April 2026 sale, later phases in planning and first-phase operation expected in 2027–2028.

Developing city — Data Center Development in Seinäjoki ↗

Published Date unavailable · Retrieved 2026-10-07

City places the approximately 22.3-hectare sold plot along Itäväylä east of Eskoo interchange; permit allows three data centers and supporting infrastructure. Wider approximately 155-hectare development is covered by preliminary agreements.

FIN01 — Seinäjoki, Finland campus overview ↗

Published Date unavailable · Retrieved 2026-10-07

Presentation explicitly dated September 2025 prints FIN01 coordinates, an incomplete address, earlier 500 MW+ design and staged readiness targets; third-party hosting limits provenance.

Asemakaavan selostus 16003 — Kivenneva, korttelit 1, 3 ja 4 ↗

Published Date unavailable · Retrieved 2026-10-07

Municipal planning report records council approval on 15 December 2025 and locates the approximately 46-hectare planning area between named roads in Kivenneva; includes South Ostrobothnia regional-plan context and Pure DC renderings.

Property photo · www.seinajoki.fi ↗

Published Date unavailable · Retrieved 2026-10-07

Municipal-page construction photograph identified as Pure DC's first phase in Kivenneva; image fetch failed, so visual suitability remains unconfirmed. Original image: https://www.seinajoki.fi/wp-content/uploads/2026/08/seinajoki-x-visio-x-datacenter-print-6-of-11-1024x576.jpg

Profile field evidence

Name: Pure DC Launches One of Europe’s Largest Ever AI Infrastructure Projects; Finland — Seinäjoki (SJK01)

Aliases: Finland — Seinäjoki (SJK01); Developing city — Data Center Development in Seinäjoki; FIN01 — Seinäjoki, Finland campus overview

Kind: Pure DC Launches One of Europe’s Largest Ever AI Infrastructure Projects; Finland — Seinäjoki (SJK01)

Country: Pure DC Launches One of Europe’s Largest Ever AI Infrastructure Projects; Finland — Seinäjoki (SJK01); Developing city — Data Center Development in Seinäjoki

Region: Asemakaavan selostus 16003 — Kivenneva, korttelit 1, 3 ja 4; Pure DC secures €1.3bn financing for Finnish data center campus

City: Pure DC Launches One of Europe’s Largest Ever AI Infrastructure Projects; Developing city — Data Center Development in Seinäjoki

Operator: Finland — Seinäjoki (SJK01); Datakeskukset — Seinäjoen kaupunki

Owner: Datakeskukset — Seinäjoen kaupunki; Developing city — Data Center Development in Seinäjoki

Business Model: Pure DC Launches One of Europe’s Largest Ever AI Infrastructure Projects; Finland — Seinäjoki (SJK01)

Scale: Pure DC Launches One of Europe’s Largest Ever AI Infrastructure Projects; Finland — Seinäjoki (SJK01)

Statuses: Finland — Seinäjoki (SJK01); Datakeskukset — Seinäjoen kaupunki

Summary: Pure DC Launches One of Europe’s Largest Ever AI Infrastructure Projects; Finland — Seinäjoki (SJK01); Datakeskukset — Seinäjoen kaupunki

Location: FIN01 — Seinäjoki, Finland campus overview; Developing city — Data Center Development in Seinäjoki; Asemakaavan selostus 16003 — Kivenneva, korttelit 1, 3 ja 4

Media: Property photo · www.seinajoki.fi

Stable identifier: 4d39104e-d22e-45c9-b58a-421b5ef2af4c