Australia / Site

AirTrunk SYD2

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

SYD2 Sydney North

OperationalUnder ConstructionPlanned

Hyperscale campus serving cloud customers in Sydney’s north. Existing buildings operate alongside further development; campus capacity versions require reconciliation.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
AirTrunk
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
New South Wales / Sydney
City / locality
Sydney
Address
1 Sirius Road, Lane Cove West
Location
Property identified by address and Lot 15 DP 1179953; no independently sourced point coordinates.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
>110 MW
Unspecified power
Original ultimate SYD2 campus capacity
Planned · cumulative
2021-03-23Reported claim ↗

Excluded from capacity totals. Announcement date; first phase opened, while full campus was described as scalable beyond this value.

70 MW
Unspecified power
Two-phase SYD2 expansion announced in 2023
Under Construction · incremental
2023-06-15Reported claim ↗

Excluded from capacity totals. Announcement date; planned completion in 2024 was an expectation, not proof of delivery.

>120 MW
Unspecified power
SYD2 total after announced expansion
Planned · cumulative
2023-06-15Reported claim ↗

Excluded from capacity totals. Announcement date; total following the 70MW expansion, not a separate additive claim.

>120 MW
Unspecified power
Campus total on current facility page
Unknown · cumulative
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Retrieval date of undated operator search extract; conflicts in version or scope with 158MW+ announcement. Commissioned share is unspecified.

>158 MW
Unspecified power
SYD2 campus in Australian platform announcement
Unknown · cumulative
2025-12-24Conflicting claim ↗

Excluded from capacity totals. Publication date; no explicit power basis, commissioned share or explanation of difference from facility-page total.

45 MW
Unspecified power
Adjacent Apollo Place Phase 5 project SSD-67407231
Planned · unclear
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval date of project description; approved 2025-10-09. Inclusion in existing campus claims is unconfirmed; do not add to 120MW or 158MW.

Development timeline

  1. 2021-03-22 · actual

    Official opening ceremony

    Operator gallery reports official opening on this date; next-day release announces first-phase opening.

    Supporting source ↗
  2. 2023-06-15 · announcement

    70MW expansion announced

    Two further phases announced, with completion expected in 2024.

    Supporting source ↗
  3. 2024 · planned

    Expansion completion target

    Original expected completion; current operator extract still identifies Shell C construction in April 2026.

    Supporting source ↗
  4. 2024-06 · actual

    Shell D completion reported

    Operator project timeline reports Shell D completion.

    Supporting source ↗
  5. 2025-10-09 · actual

    Apollo Place planning approval

    NSW portal records approval of adjacent 45MW project.

    Supporting source ↗
  6. 2026-04 · actual

    Shell C construction reported

    Operator timeline identifies Shell C as under construction; no later completion established.

    Supporting source ↗

Disclosed specifications

Site area

3.95ha in 2023; 4.2ha on current operator extract

Boundary or version difference unresolved.

Source ↗

Current published area

4.2ha

Undated operator search extract.

Source ↗

Technical space

29,000m²; 24 data halls

Published campus design, not measured occupied space.

Source ↗

Office and storage

4,000m²

Operator specification.

Source ↗

Power infrastructure

Dedicated 200MVA, 132kV substation

Apparent-power rating retained as MVA; no conversion to MW or inference of IT load.

Source ↗

Design efficiency

PUE 1.15

Design target, not measured annual operational PUE.

Source ↗

Cooling

High-temperature air-cooled chillers with free cooling and customised fan-wall units

Operator design description.

Source ↗

Connectivity

Carrier neutral; multiple entry paths

Operator specification; individual carriers unconfirmed.

Source ↗

Security and hosting

Australian Government Certified Strategic hosting provider; SCEC Zone 3 or higher design

Operator claims; certificate scope and current validity not independently checked.

Source ↗

Corporate ownership

Blackstone and CPP Investments-led consortium alongside Robin Khuda, acquired in 2024

Corporate ownership only; legal property owner unknown.

Source ↗

Contractor electrical design claim

130MW

Undated contractor figure; basis and scope differ from operator totals. No dated capacity claim created.

Source ↗

Public business enquiries

info@airtrunk.com; +61 2 9953 4780

Operator corporate contact, not an on-site operations contact.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

SYD2 Sydney North ↗

Published Date unavailable · Retrieved 2026-10-09

Operator search extracts identify Sydney North, campus specifications, Shell C under construction in April 2026, and adjacent Apollo Phase 5 intended to integrate with the existing campus. Initial open returned a page reference; subsequent opens timed out.

Apollo Place Data Centre ↗

Published Date unavailable · Retrieved 2026-10-09

Government project SSD-67407231 describes a 45MW data centre and records approval on 9 October 2025.

Our Investors ↗

Published Date unavailable · Retrieved 2026-10-09

AirTrunk reports acquisition in 2024 by a Blackstone and CPP Investments-led consortium alongside founder Robin Khuda; corporate ownership does not establish property title.

Connect with AirTrunk ↗

Published Date unavailable · Retrieved 2026-10-09

Public business contact lists info@airtrunk.com and +61 2 9953 4780; Sydney office address is separate from SYD2.

Profile field evidence

Name: AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market; Acoustic Assessment AirTrunk Data Centre – 1 Sirius Road, Lane Cove West

Aliases: SYD2 Sydney North

Kind: 70-megawatt expansion underway at AirTrunk SYD2; AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market

Country: 70-megawatt expansion underway at AirTrunk SYD2; AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market

Region: AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market; Acoustic Assessment AirTrunk Data Centre – 1 Sirius Road, Lane Cove West

City: AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market

Metro: AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market

Address: Acoustic Assessment AirTrunk Data Centre – 1 Sirius Road, Lane Cove West

Operator: AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market; Airtrunk SYD1 & SYD2 – Data Centre Case Study

Business Model: AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market

Scale: 70-megawatt expansion underway at AirTrunk SYD2; AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market

Statuses: AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market; SYD2 Sydney North; Apollo Place Data Centre

Summary: SYD2 Sydney North; 70-megawatt expansion underway at AirTrunk SYD2; AirTrunk opens second Sydney hyperscale data centre, cementing leadership in the Australian market

Location: Acoustic Assessment AirTrunk Data Centre – 1 Sirius Road, Lane Cove West

Stable identifier: 4e60c2de-4cbd-4d5c-b0f7-a976d771a7f0