Map
Sign in
← Explore registry

Netherlands / Site

SilverFalcon AMS1 · Silver Falcon AMS 01 (Westpoort) · DC Westpoort

Under Construction

Three-tower leased hyperscale campus in Amsterdam Westpoort, previously promoted by SilverFalcon and developed through Caransa/FalconConnect entities. Pure DC announced acquisition and development in December 2025 and confirmed construction underway in May 2026. Its live substation does not establish operational data halls. Current operator plans identify 78 MW of data halls across three towers; historical figures require reconciliation.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Pure Data Centres Group
Ownership
Pure DC — acquired leasehold site; underlying land held through Port of Amsterdam leasehold
Business model / scale
Colocation / Hyperscale
Region / metro
North Holland / Amsterdam
City / locality
Amsterdam
Address
Plimsollweg 3, 13 and 23, 1042 AS Amsterdam
Location
Campus address corroborated by permits and DDA; no sourced property point or accessible Google Maps marker established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
78 MW
IT load
Entire three-tower AMS01 campus, ultimate data hall capacity
Under Construction · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated current operator page retrieved on this date; describes three towers containing 26 MW of data halls each. Planned ultimate load, not commissioned capacity.

26 MW
IT load
Each of three proposed towers; no individual tower assigned
Planned · incremental
2025-12-15Reported claim ↗

Excluded from capacity totals. Announcement date. Per-tower data hall design overlaps the 78 MW campus claim and must not be added to it.

100 MW
Unspecified power
Historical Caransa Westpoort project design
Planned · unclear
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Undated advisor page retrieved on this date. MW basis and historical applicability are unspecified; differs from current 78 MW data hall design and cannot be equated to the operator's 100 MVA connection.

Development timeline

  1. 2020-11-17 · announcement

    Initial permit grant published

    Government published permission for three DC Westpoort towers; Caransa Groep B.V. applicant.

    Supporting source ↗
  2. 2025-07-15 · actual

    Building permit amendment granted

    Facade changes and two water buffer tanks approved for FalconConnect B.V.; published 5 August 2025.

    Supporting source ↗
  3. 2025-12-15 · announcement

    Pure DC announces AMS01 development

    Acquisition and fully leased campus announced; private substation already live. Acquisition completion date was not separately disclosed.

    Supporting source ↗
  4. 2026-01 · planned

    Expected data hall construction start

    January 2026 start forecast in the December 2025 announcement.

    Supporting source ↗
  5. 2026-05-27 · actual

    Construction underway reported

    Pure DC confirmed construction underway; this is a dated status report, not the actual start date.

    Supporting source ↗

Disclosed specifications

Grid connection

100 MVA via private substation; firm 50 kV connection

Substation live by December 2025. Apparent power is retained in MVA and not converted to MW.

Source ↗

Campus layout

Three 85-metre towers

Current development design.

Source ↗

Land area

5.68 acres

Current operator disclosure; introductory text rounds to six acres.

Source ↗

Building size

94,660 m²

Operator wording; gross/net basis unspecified. Historical SilverFalcon area figures differ.

Source ↗

Efficiency

Target PUE 1.2

Design target, not measured operational performance.

Source ↗

Leasing

Entire campus fully leased

Operator identifies a hyperscale customer without naming it.

Source ↗

Reported tenant

Microsoft

De Westkrant attributes confirmation to NRC; primary tenant statement was not inspected.

Source ↗

Historical cooling design

N+1; air and immersion cooling; liquid-cooling readiness

SilverFalcon marketing; current implementation not verified.

Source ↗

Historical connectivity design

Carrier-neutral; dual fibre routing; AMS-IX and NL-IX connectivity claims

Historical marketing rather than verified live services.

Source ↗

Historical sustainability design

Renewable energy, non-potable cooling water, heat reuse and HVO backup fuel

Promotional design claims; current delivery and supply contracts unverified.

Source ↗

Historical compliance claims

Tier III compliance; ISO 14001, 45001, 9001, 50001, 27001 and PCI DSS listed

Certificates and site-specific certification scope were not obtained.

Source ↗

Public business contact

info@puredc.com

Published by DDA; not contacted.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Specs at AMS1 — SilverFalcon ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies AMS1 at Plimsollweg 3 in Amsterdam Westpoort as a three-building campus. Historical marketing lists 100 MVA, differing area measures and proposed technical features; footer address Radarweg 29 is a contact address.

Amsterdam Westpoort (AMS01) — Pure DC ↗

Published Date unavailable · Retrieved 2026-10-09

Current campus page reports 78 MW total capacity, three towers, 5.68 acres, 94,660 square metres building size, target PUE 1.2 and an operational substation.

Permit amendment for Plimsollweg data centre ↗

Published 2025-08-05 · Retrieved 2026-10-09

North Holland notice records a granted amendment dated 15 July 2025 for facade changes and two water buffer tanks; applicant FalconConnect B.V.; same three addresses and original permit reference.

Profile field evidence

Name: Pure Data Centres launches new Amsterdam data centre fully leased with power and permits; Amsterdam Westpoort (AMS01) — Pure DC

Aliases: Specs at AMS1 — SilverFalcon; Permit granted for DC Westpoort at Plimsollweg 3, 13 and 23

Kind: Amsterdam Westpoort (AMS01) — Pure DC; Permit granted for DC Westpoort at Plimsollweg 3, 13 and 23

Country: New global landmark 100MW data centre in Amsterdam Westpoort — Haskoning

Region: Permit amendment for Plimsollweg data centre

City: Pure Data Centres Group — Dutch Data Center Association; Permit granted for DC Westpoort at Plimsollweg 3, 13 and 23

Metro: Amsterdam Westpoort (AMS01) — Pure DC; New global landmark 100MW data centre in Amsterdam Westpoort — Haskoning

Address: Pure Data Centres Group — Dutch Data Center Association; Permit granted for DC Westpoort at Plimsollweg 3, 13 and 23; Permit amendment for Plimsollweg data centre

Operator: Pure Data Centres launches new Amsterdam data centre fully leased with power and permits; Pure DC Secures $2.7 Billion to Accelerate AI Infrastructure Growth Across Europe and the Middle East; Pure Data Centres Group — Dutch Data Center Association

Owner: Pure Data Centres launches new Amsterdam data centre fully leased with power and permits

Business Model: Pure Data Centres launches new Amsterdam data centre fully leased with power and permits; Amsterdam Westpoort (AMS01) — Pure DC

Scale: Pure Data Centres launches new Amsterdam data centre fully leased with power and permits

Statuses: Pure DC Secures $2.7 Billion to Accelerate AI Infrastructure Growth Across Europe and the Middle East

Summary: Specs at AMS1 — SilverFalcon; Pure Data Centres launches new Amsterdam data centre fully leased with power and permits; Pure DC Secures $2.7 Billion to Accelerate AI Infrastructure Growth Across Europe and the Middle East; Amsterdam Westpoort (AMS01) — Pure DC; Permit granted for DC Westpoort at Plimsollweg 3, 13 and 23; Permit amendment for Plimsollweg data centre

Location: Pure Data Centres Group — Dutch Data Center Association; Permit granted for DC Westpoort at Plimsollweg 3, 13 and 23

Stable identifier: 4eaa5337-9e26-4263-a00b-383d16770379