DCD: ECOS 60 MW cryptomine launch ↗
Published 2022-07-27 · Retrieved 2026-10-07
Reports a 60 MW launch on 22,000 m² at Hrazdan Power Plant, with possible further expansion.
Armenia / Site
ECOS-M Hrazdan · ECOS Free Economic Zone mining center
Crypto-mining data center reported launched at 60 MW in 2022 at Hrazdan Power Plant. Included as a specialized data-center candidate; current usable capacity and expansion delivery are unconfirmed.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 60 MW Unspecified power | Mining-center capacity reported at 2022 launch Operational · cumulative | 2022-07-27 | Reported claim ↗ Excluded from capacity totals. Historical reporting; not verified current IT load. Enterprise Armenia describes electricity supply, so boundary between connection and facility capacity remains unresolved. |
Publication July 27; exact commissioning day unknown.
Supporting source ↗Kept explicit so it is distinguishable from general-purpose colocation.
Source ↗No 200 MW numeric claim imported because additional-versus-total wording and current project status require reconciliation.
Source ↗Direct operator site returned HTTP 403 during this research.
Source ↗ECOS-M declaration confirmed 2026-02-19; not a land or building title record.
Source ↗Goldberg is also reported as managing partner. Sukiasyan ownership does not establish a personal day-to-day mining role or separate prior mining business.
Source ↗Retain as dated company claim alongside the newer beneficial ownership declaration; no current direct stake percentage established for Tashir.
Source ↗Accessible Google Maps embedded search returned EcoSense at 44 Purakayin street, Hrazdan, not the ECOS mining facility. Rejected as unrelated; no coordinate assigned. General Maps search did not expose usable matching place results. This does not establish that no ECOS listing exists. Photo galleries were not accessible in the available public response; no property photograph visually verified or imported. No assertion that no photos exist.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published 2022-07-27 · Retrieved 2026-10-07
Reports a 60 MW launch on 22,000 m² at Hrazdan Power Plant, with possible further expansion.
Published Date unavailable · Retrieved 2026-10-07
Describes 60 MW electricity supply from high-voltage networks and more than 20,000 devices; delivered IT load not established.
Published Date unavailable · Retrieved 2026-10-07
ECOS-M identifies its own mining/hosting data center in the Hrazdan Free Economic Zone; business address Gortsaranain street 1 is not independently confirmed as the individual building entrance.
Published 2026-02-19 · Retrieved 2026-10-07
Declaration confirmed 2026-02-19: Ilya Goldberg 30% indirect and Semyon Sukiasyan 70% indirect beneficial ownership. Intermediary organizations include PATRAS and ECOS HOLDING. This establishes corporate beneficial ownership, not real-estate title.
Published 2022-03-04 · Retrieved 2026-10-07
Company help article names Ilya Goldberg as founder and Tashir Group as main investor in March 2022. Historical statement; it does not establish the present shareholder chain.
Published 2022-07-27 · Retrieved 2026-10-07
Reports ECOS Hrazdan crypto-mining operation and quotes managing partner Ilya Goldberg.
Published Date unavailable · Retrieved 2026-10-07
Accessible Google Maps embedded search returned EcoSense at 44 Purakayin street, Hrazdan, not the ECOS mining facility. Rejected as unrelated; no coordinate assigned. General Maps search did not expose usable matching place results. This does not establish that no ECOS listing exists. Photo galleries were not accessible in the available public response; no property photograph visually verified or imported. No assertion that no photos exist.
Name: DCD: ECOS 60 MW cryptomine launch
Aliases: DCD: ECOS 60 MW cryptomine launch
Kind: DCD: ECOS 60 MW cryptomine launch
Country: DCD: ECOS 60 MW cryptomine launch
Region: DCD: ECOS 60 MW cryptomine launch
City: DCD: ECOS 60 MW cryptomine launch
Operator: ECOS-M company description
Statuses: DCD: ECOS 60 MW cryptomine launch
Summary: DCD: ECOS 60 MW cryptomine launch
Address: DCD: ECOS 60 MW cryptomine launch
Stable identifier: 4fce04d3-1999-4b39-8f57-ad2ec651de62