Marsden Park Data Centre

Under ConstructionPlanned

CDC-owned Sydney campus under construction at Marsden Park. The approved development reports 504 MW; an October 2026 modification proposal seeks 743.5 MW. Neither figure establishes operational load. Building configuration and power basis require reconciliation.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
CDC Data Centres
Ownership
CDC
Business model / scale
Unknown / Hyperscale
Region / metro
New South Wales / Sydney
City / locality
Marsden Park
Address
105–113 Hollinsworth Road, Marsden Park NSW 2765, Australia
Location
Street address and cadastral lots established by planning evidence; no sourced property coordinate established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
504 MW
IT load
Whole Marsden Park campus announced in 2024
Planned · cumulative
2024-10-25Reported claim ↗

Excluded from capacity totals. Announcement date; operator explicitly calls this ICT capacity. Not commissioned load.

504 MW
Facility power
Approved SSD-70889211 campus
Planned · cumulative
2025-11-27Conflicting claim ↗

Excluded from capacity totals. Planning determination date; portal calls this power consumption. Relationship to operator ICT figure unresolved.

720 MW
Grid connection
Substation associated with SSD-70889211
Planned · unclear
2025-11-27Reported claim ↗

Excluded from capacity totals. Determination date; reported substation capacity, not IT load or proof of energized connection.

>504 MW
Unspecified power
Marsden Park campus planned capacity
Planned · cumulative
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Retrieval date of undated operator page; says over 504 MW, unlike the exact approved figure.

≈1000 MW
Unspecified power
Potential ultimate Marsden Park campus scalability
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval date; one gigawatt converted to MW. Scalability towards this figure is an aspiration, not approved or operational capacity.

743.5 MW
Unspecified power
Proposed modified whole-campus capacity
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval date of October 2026 update; application being prepared. Replaces proposed total of 504 MW rather than adding 743.5 MW; approval not established.

5 MW
Unspecified power
Initial facility approved under DA-24-00542
Planned · unclear
2024-11-14Reported claim ↗

Excluded from capacity totals. Local approval date; inclusion within or overlap with SSD campus capacity is unresolved. Do not add to campus totals.

Development timeline

  1. 2024-10-25 · actual ceremonial groundbreaking

    Campus sod-turning

    CDC announced ceremonial commencement following initial approvals; distinct from subsequent main campus consent.

    Supporting source ↗
  2. 2024-11-14 · actual approval

    Initial 5 MW facility approved

    Local development approval DA-24-00542.

    Supporting source ↗
  3. 2025-11-27 · actual approval

    Main campus approved

    SSD-70889211 determination recorded as approved.

    Supporting source ↗
  4. 2026-10 · announcement of proposed modification

    743.5 MW capacity proposal

    CDC update describes preparation of modification application; anticipated determination mid-2027.

    Supporting source ↗
  5. 2027-09 to 2029-12 · planned commissioning and handover

    Staged campus handovers

    Operator schedule; does not establish completed commissioning.

    Supporting source ↗

Disclosed specifications

Land area

Approximately 20.91 hectares

2024 assessment title area; not building floor area.

Source ↗

Cadastral identification

Lots 10 and 11 DP 1262052

Planning assessment property identification.

Source ↗

Building configuration

Five four-storey buildings and one two-storey building

Current operator description differs from planning portal’s six four-storey buildings; final approved configuration unresolved.

Source ↗

Cooling

Closed-loop recirculating water cooling

Operator-described design, not measured operational performance.

Source ↗

Water efficiency target

WUE 0.01 L/kWh

Government-reported design target; not achieved operating result.

Source ↗

Energy

Planned renewable energy sourcing

Government describes ambition to reduce development greenhouse emissions by up to 99% by 2030; not evidence of achieved reductions.

Source ↗

Modification infrastructure

Additional diesel generators, chillers and roof plant; supply upgrades coordinated with Transgrid

Proposed modification scope.

Source ↗

Public project contact

marsdenparkcommunications@cdc.com; 1300 232 232

Published project contact; no contact made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Sydney | CDC Data Centres ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies Marsden Park as CDC’s second Sydney campus, in early construction, with over 504 MW planned capacity and scalability towards one gigawatt.

Marsden Park | CDC ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies Hollinsworth Road project on land owned by CDC; describes five four-storey buildings and one two-storey building, staged construction and planned handover through December 2029.

Marsden Park Data Centre: Social Impact Assessment ↗

Published 2024-11-01 · Retrieved 2026-10-09

Astrolabe assessment identifies 105 and 113 Hollinsworth Road, Blacktown LGA, Lots 10 and 11 DP 1262052, approximately 20.91 hectares; describes proposed 504 MW consumption and 720 MW substation.

CDC Marsden Park Project Update — October 2026 ↗

Published Date unavailable · Retrieved 2026-10-09

Document explicitly dated October 2026, without a publication day. CDC is preparing a modification to increase capacity from 504 to 743.5 MW within the same footprint; anticipated determination mid-2027. Describes additional generators/chillers and work with Transgrid.

Profile field evidence

Name: Sydney | CDC Data Centres

Aliases: Marsden Park Data Centre | NSW Planning Portal

Kind: Sydney | CDC Data Centres; CDC Marsden Park Project Update — October 2026

Country: CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct; Southern Hemisphere’s biggest data centre gets the green light | NSW Government

Region: Marsden Park Data Centre | NSW Planning Portal; Southern Hemisphere’s biggest data centre gets the green light | NSW Government

City: Canberra Data Centre | NSW Planning Portal; Marsden Park Data Centre: Social Impact Assessment

Metro: Sydney | CDC Data Centres; Southern Hemisphere’s biggest data centre gets the green light | NSW Government

Address: Canberra Data Centre | NSW Planning Portal; Marsden Park Data Centre: Social Impact Assessment

Operator: Marsden Park | CDC; CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct

Owner: Marsden Park | CDC

Scale: Southern Hemisphere’s biggest data centre gets the green light | NSW Government

Statuses: Sydney | CDC Data Centres; Marsden Park | CDC; CDC Marsden Park Project Update — October 2026

Summary: Sydney | CDC Data Centres; Marsden Park Data Centre | NSW Planning Portal; CDC Marsden Park Project Update — October 2026

Location: Canberra Data Centre | NSW Planning Portal; Marsden Park Data Centre: Social Impact Assessment

Stable identifier: 50850500-7aa0-4f46-bd7c-d4522f1e8d7b