Identifies Marsden Park as CDC’s second Sydney campus, in early construction, with over 504 MW planned capacity and scalability towards one gigawatt.
Australia / Site
Marsden Park Data Centre
CDC-owned Sydney campus under construction at Marsden Park. The approved development reports 504 MW; an October 2026 modification proposal seeks 743.5 MW. Neither figure establishes operational load. Building configuration and power basis require reconciliation.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 504 MW IT load | Whole Marsden Park campus announced in 2024 Planned · cumulative | 2024-10-25 | Reported claim ↗ Excluded from capacity totals. Announcement date; operator explicitly calls this ICT capacity. Not commissioned load. |
| 504 MW Facility power | Approved SSD-70889211 campus Planned · cumulative | 2025-11-27 | Conflicting claim ↗ Excluded from capacity totals. Planning determination date; portal calls this power consumption. Relationship to operator ICT figure unresolved. |
| 720 MW Grid connection | Substation associated with SSD-70889211 Planned · unclear | 2025-11-27 | Reported claim ↗ Excluded from capacity totals. Determination date; reported substation capacity, not IT load or proof of energized connection. |
| >504 MW Unspecified power | Marsden Park campus planned capacity Planned · cumulative | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date of undated operator page; says over 504 MW, unlike the exact approved figure. |
| ≈1000 MW Unspecified power | Potential ultimate Marsden Park campus scalability Planned · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. Retrieval date; one gigawatt converted to MW. Scalability towards this figure is an aspiration, not approved or operational capacity. |
| 743.5 MW Unspecified power | Proposed modified whole-campus capacity Planned · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. Retrieval date of October 2026 update; application being prepared. Replaces proposed total of 504 MW rather than adding 743.5 MW; approval not established. |
| 5 MW Unspecified power | Initial facility approved under DA-24-00542 Planned · unclear | 2024-11-14 | Reported claim ↗ Excluded from capacity totals. Local approval date; inclusion within or overlap with SSD campus capacity is unresolved. Do not add to campus totals. |
CDC announced ceremonial commencement following initial approvals; distinct from subsequent main campus consent.
Supporting source ↗Local development approval DA-24-00542.
Supporting source ↗SSD-70889211 determination recorded as approved.
Supporting source ↗CDC update describes preparation of modification application; anticipated determination mid-2027.
Supporting source ↗Operator schedule; does not establish completed commissioning.
Supporting source ↗Planning assessment property identification.
Source ↗Current operator description differs from planning portal’s six four-storey buildings; final approved configuration unresolved.
Source ↗Operator-described design, not measured operational performance.
Source ↗Government-reported design target; not achieved operating result.
Source ↗Government describes ambition to reduce development greenhouse emissions by up to 99% by 2030; not evidence of achieved reductions.
Source ↗Proposed modification scope.
Source ↗Published project contact; no contact made.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Identifies Marsden Park as CDC’s second Sydney campus, in early construction, with over 504 MW planned capacity and scalability towards one gigawatt.
Published Date unavailable · Retrieved 2026-10-09
Identifies Hollinsworth Road project on land owned by CDC; describes five four-storey buildings and one two-storey building, staged construction and planned handover through December 2029.
Published Date unavailable · Retrieved 2026-10-09
SSD-70889211 approved 27 November 2025; describes 504 MW power consumption, six four-storey buildings and a 720 MW substation.
Published 2024-10-25 · Retrieved 2026-10-09
Dated ceremonial groundbreaking announcement identifies Sydney, Australia and describes 504 MW ICT capacity with six buildings.
Published Date unavailable · Retrieved 2026-10-09
DA-24-00542 / PPSSCC-562 at 105 and 113 Hollinsworth Road approved 14 November 2024 for a 5 MW facility.
Published 2024-11-01 · Retrieved 2026-10-09
Astrolabe assessment identifies 105 and 113 Hollinsworth Road, Blacktown LGA, Lots 10 and 11 DP 1262052, approximately 20.91 hectares; describes proposed 504 MW consumption and 720 MW substation.
Published 2025-11-28 · Retrieved 2026-10-09
Government approval announcement identifies Marsden Park in north-west Sydney, Australia; describes hyperscale development, renewable energy plans and target WUE of 0.01 L/kWh.
Published Date unavailable · Retrieved 2026-10-09
Document explicitly dated October 2026, without a publication day. CDC is preparing a modification to increase capacity from 504 to 743.5 MW within the same footprint; anticipated determination mid-2027. Describes additional generators/chillers and work with Transgrid.
Name: Sydney | CDC Data Centres
Aliases: Marsden Park Data Centre | NSW Planning Portal
Kind: Sydney | CDC Data Centres; CDC Marsden Park Project Update — October 2026
Country: CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct; Southern Hemisphere’s biggest data centre gets the green light | NSW Government
Region: Marsden Park Data Centre | NSW Planning Portal; Southern Hemisphere’s biggest data centre gets the green light | NSW Government
City: Canberra Data Centre | NSW Planning Portal; Marsden Park Data Centre: Social Impact Assessment
Metro: Sydney | CDC Data Centres; Southern Hemisphere’s biggest data centre gets the green light | NSW Government
Address: Canberra Data Centre | NSW Planning Portal; Marsden Park Data Centre: Social Impact Assessment
Operator: Marsden Park | CDC; CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct
Owner: Marsden Park | CDC
Scale: Southern Hemisphere’s biggest data centre gets the green light | NSW Government
Statuses: Sydney | CDC Data Centres; Marsden Park | CDC; CDC Marsden Park Project Update — October 2026
Summary: Sydney | CDC Data Centres; Marsden Park Data Centre | NSW Planning Portal; CDC Marsden Park Project Update — October 2026
Location: Canberra Data Centre | NSW Planning Portal; Marsden Park Data Centre: Social Impact Assessment
Stable identifier: 50850500-7aa0-4f46-bd7c-d4522f1e8d7b