EdgeConneX Amsterdam data sheet ↗
Published Date unavailable · Retrieved 2026-10-09
Search-indexed operator PDF identifies five buildings, mixed colocation/build-to-suit use and building power. Direct opening failed; publication date unconfirmed.
Netherlands / Site
Amsterdam Data Center Campus
Established campus combining colocation and customer-specific hyperscale facilities. This record covers AMS01–AMS05; later Amsterdam projects require separate boundary review. Published power is not verified energized IT load. AMS05 commissioning remains uncertain.
PeeringDB AMS01 facility geocode; its street address matches operator and municipal evidence. Used as a campus anchor, not a surveyed point or campus centroid; Maps marker and footprint were not inspected.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 7 MW Unspecified power | AMS01 Operational · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Undated sheet retrieved on as_of; N+1 advertised power, not measured load. |
| 20 MW Unspecified power | AMS02 Operational · unclear | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. Retrieval date, not commissioning date; N+1 advertised power. |
| 15 MW Unspecified power | AMS03 Operational · unclear | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. Retrieval date; N+1 advertised power. |
| 21 MW Unspecified power | AMS04 Operational · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date; N+1; other sheet reports 20.8 MW, possibly rounding. |
| 46 MW Unspecified power | AMS05 customer-specific build in datasheet Planned · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date; N+1; sheet describes future delivery, not energized capacity. |
| 20 MW Unspecified power | AMS01 Colo Operational · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Undated product sheet retrieved on as_of; conflicts with 7 MW. |
| 20.8 MW Unspecified power | AMS04 Operational · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date; compare 21 MW without selecting a preferred value. |
| 240 MW Grid connection | Amsterdam phased substation for future hyperscale requirements Planned · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. Retrieval date; described as delivered in multiple phases. Actual energized phases and allocation to AMS01–AMS05 unknown. |
Municipality reported receiving the establishment notification; not evidence of a commissioning date.
Supporting source ↗Municipal policy inventory classified AMS01–AMS04 operating and AMS05 under construction.
Supporting source ↗Operator policy. Municipal inventory instead uses 55A for AMS02 and 32 for AMS04.
Source ↗Indexed datasheet; other narrative says over 44,000 m² building space. Definitions unreconciled.
Source ↗Customer-specific future facility in operator sheet; directory gives conflicting 5,140 m².
Source ↗Historical operator product sheet; not a verified current parcel footprint.
Source ↗Advertised capability, not installed average density.
Source ↗Directory description of AMS01; not independently validated across all buildings.
Source ↗Public PeeringDB entries; no contractual service availability verification.
Source ↗Datasheet claims; certificates, scope and validity not inspected.
Source ↗2023 policy statement; does not establish real-estate ownership or current group structure.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Search-indexed operator PDF identifies five buildings, mixed colocation/build-to-suit use and building power. Direct opening failed; publication date unconfirmed.
Published Date unavailable · Retrieved 2026-10-09
Opened PDF lists AMS01–AMS05 addresses and Dutch operating entities. It says four properties but enumerates five; corporate ownership is distinct from property title.
Published 2020-11-23 · Retrieved 2026-10-09
Municipal inventory identifies AMS01–AMS04 as operating and AMS05 as under construction at distinct Schiphol-Rijk addresses.
Published Date unavailable · Retrieved 2026-10-09
Opened operator PDF reports four existing Amsterdam buildings, future AMS05, land bank and phased substation; power differs from the Amsterdam sheet.
Published Date unavailable · Retrieved 2026-10-09
Industry directory identifies an operational Schiphol-Rijk campus in Amsterdam metro, North Holland; says EdgeConneX does not own the building without naming its owner.
Published Date unavailable · Retrieved 2026-10-09
Directory labels AMS05 operational at Koolhovenlaan 6, but its 5,140 m² specification conflicts with operator material.
Published Date unavailable · Retrieved 2026-10-09
Public facility record gives Koolhovenlaan 12, geocode 52.286093, 4.768444, carriers and NL-ix; displayed record update is 2025-09-26.
Published Date unavailable · Retrieved 2026-10-09
Government organization register lists Schiphol-Rijk among Haarlemmermeer localities and identifies North Holland.
Published Date unavailable · Retrieved 2026-10-09
Contractor identifies an additional Amsterdam data centre, client Winthrop, and groundworks/landscaping scope; no commissioning date.
Published 2024-12-31 · Retrieved 2026-10-09
Municipal disclosure identifies later EdgeConneX projects at separate addresses, including AMS06 and AMS07; not added to this five-building lead.
Published 2016-07-26 · Retrieved 2026-10-09
Municipal notice records receipt of an environmental notification for establishing the EdgeConnex facility at Koolhovenlaan 12.
Name: EdgeConneX Amsterdam data sheet; Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084
Aliases: EdgeConneX Amsterdam data sheet
Kind: EdgeConneX Amsterdam data sheet; EdgeConneX hyperscale data center product sheet
Country: EdgeConneX Amsterdam data sheet; Netherlands Environmental Management Policy 2023
Region: EdgeConnex Amsterdam Data Center; Contactgegevens Gemeente Haarlemmermeer — Overheid.nl
City: Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084
Metro: EdgeConnex Amsterdam Data Center
Address: Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084; EdgeConneX Amsterdam (EDCAMS01) — PeeringDB
Operator: Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084
Business Model: EdgeConneX Amsterdam data sheet; Netherlands Environmental Management Policy 2023
Scale: EdgeConneX hyperscale data center product sheet
Statuses: Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084; EdgeConnex Amsterdam Data Center
Summary: EdgeConneX Amsterdam data sheet; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084; EdgeConneX hyperscale data center product sheet; EdgeConnex Amsterdam Data Center; EdgeConnex: AMS05 Data Center; Beschikbare ontwikkelruimte voor datacenters — Gemeenteblad 2024, 549662
Location: EdgeConneX Amsterdam (EDCAMS01) — PeeringDB; Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084
Stable identifier: 56c7b050-0ba3-4921-8fd6-86828e13d958