Netherlands / Site

EdgeConneX Amsterdam campus (AMS01–AMS05)

Amsterdam Data Center Campus

Operational

Established campus combining colocation and customer-specific hyperscale facilities. This record covers AMS01–AMS05; later Amsterdam projects require separate boundary review. Published power is not verified energized IT load. AMS05 commissioning remains uncertain.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
EdgeConneX
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
North Holland / Amsterdam
City / locality
Schiphol-Rijk
Address
Koolhovenlaan 12, 1119 NE Schiphol-Rijk, Netherlands (AMS01 campus anchor)
Location
PeeringDB AMS01 facility geocode; its street address matches operator and municipal evidence. Used as a campus anchor, not a surveyed point or campus centroid; Maps marker and footprint were not inspected.
Precision: approximate · 52.286093, 4.768444
View location on map →
Parent
Not assigned

Location detail

PeeringDB AMS01 facility geocode; its street address matches operator and municipal evidence. Used as a campus anchor, not a surveyed point or campus centroid; Maps marker and footprint were not inspected.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Koolhovenlaan 12, 1119 NE Schiphol-Rijk, Netherlands (AMS01 campus anchor)

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
7 MW
Unspecified power
AMS01
Operational · unclear
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Undated sheet retrieved on as_of; N+1 advertised power, not measured load.

20 MW
Unspecified power
AMS02
Operational · unclear
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval date, not commissioning date; N+1 advertised power.

15 MW
Unspecified power
AMS03
Operational · unclear
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval date; N+1 advertised power.

21 MW
Unspecified power
AMS04
Operational · unclear
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Retrieval date; N+1; other sheet reports 20.8 MW, possibly rounding.

46 MW
Unspecified power
AMS05 customer-specific build in datasheet
Planned · unclear
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Retrieval date; N+1; sheet describes future delivery, not energized capacity.

20 MW
Unspecified power
AMS01 Colo
Operational · unclear
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Undated product sheet retrieved on as_of; conflicts with 7 MW.

20.8 MW
Unspecified power
AMS04
Operational · unclear
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Retrieval date; compare 21 MW without selecting a preferred value.

240 MW
Grid connection
Amsterdam phased substation for future hyperscale requirements
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval date; described as delivered in multiple phases. Actual energized phases and allocation to AMS01–AMS05 unknown.

Development timeline

  1. 2016-07-26 · announcement

    AMS01 environmental notification published

    Municipality reported receiving the establishment notification; not evidence of a commissioning date.

    Supporting source ↗
  2. 2020-11-23 · actual-status-report

    Four operating buildings and AMS05 construction listed

    Municipal policy inventory classified AMS01–AMS04 operating and AMS05 under construction.

    Supporting source ↗

Disclosed specifications

Building addresses

AMS01: Koolhovenlaan 12; AMS02: Cessnalaan 55; AMS03: Koolhovenlaan 20; AMS04: Cessnalaan 36; AMS05: Koolhovenlaan 6

Operator policy. Municipal inventory instead uses 55A for AMS02 and 32 for AMS04.

Source ↗

Campus space

Over 34,000 m² total; over 16,000 m² completed data halls

Indexed datasheet; other narrative says over 44,000 m² building space. Definitions unreconciled.

Source ↗

AMS05 proposed facility area

18,116 m²

Customer-specific future facility in operator sheet; directory gives conflicting 5,140 m².

Source ↗

Land bank

Over 180,000 m²

Historical operator product sheet; not a verified current parcel footprint.

Source ↗

Rack density capability

20+ kW per cabinet

Advertised capability, not installed average density.

Source ↗

Cooling

1 m raised-floor forced-air plenum; N+1 CRACs in separate suites

Directory description of AMS01; not independently validated across all buildings.

Source ↗

Connectivity at AMS01

NL-ix; Arelion, euNetworks, Eurofiber, Relined Fiber Network

Public PeeringDB entries; no contractual service availability verification.

Source ↗

Compliance advertised

ISO 27001, PCI-DSS, SOC 2 Type 2, ISO 14001

Datasheet claims; certificates, scope and validity not inspected.

Source ↗

Corporate relationship

EdgeConneX Netherlands B.V. and EdgeConneX AMS04 B.V. indirectly owned by EdgeConneX Europe B.V.

2023 policy statement; does not establish real-estate ownership or current group structure.

Source ↗

Public sales contact

info@edgeconnex.com

Public facility record; no contact made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

EdgeConneX Amsterdam data sheet ↗

Published Date unavailable · Retrieved 2026-10-09

Search-indexed operator PDF identifies five buildings, mixed colocation/build-to-suit use and building power. Direct opening failed; publication date unconfirmed.

Netherlands Environmental Management Policy 2023 ↗

Published Date unavailable · Retrieved 2026-10-09

Opened PDF lists AMS01–AMS05 addresses and Dutch operating entities. It says four properties but enumerates five; corporate ownership is distinct from property title.

EdgeConnex Amsterdam Data Center ↗

Published Date unavailable · Retrieved 2026-10-09

Industry directory identifies an operational Schiphol-Rijk campus in Amsterdam metro, North Holland; says EdgeConneX does not own the building without naming its owner.

EdgeConnex: AMS05 Data Center ↗

Published Date unavailable · Retrieved 2026-10-09

Directory labels AMS05 operational at Koolhovenlaan 6, but its 5,140 m² specification conflicts with operator material.

Edgeconnex AMS05 — Glent ↗

Published Date unavailable · Retrieved 2026-10-09

Contractor identifies an additional Amsterdam data centre, client Winthrop, and groundworks/landscaping scope; no commissioning date.

Profile field evidence

Name: EdgeConneX Amsterdam data sheet; Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084

Aliases: EdgeConneX Amsterdam data sheet

Kind: EdgeConneX Amsterdam data sheet; EdgeConneX hyperscale data center product sheet

Country: EdgeConneX Amsterdam data sheet; Netherlands Environmental Management Policy 2023

Region: EdgeConnex Amsterdam Data Center; Contactgegevens Gemeente Haarlemmermeer — Overheid.nl

City: Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084

Metro: EdgeConnex Amsterdam Data Center

Address: Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084; EdgeConneX Amsterdam (EDCAMS01) — PeeringDB

Operator: Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084

Business Model: EdgeConneX Amsterdam data sheet; Netherlands Environmental Management Policy 2023

Scale: EdgeConneX hyperscale data center product sheet

Statuses: Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084; EdgeConnex Amsterdam Data Center

Summary: EdgeConneX Amsterdam data sheet; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084; EdgeConneX hyperscale data center product sheet; EdgeConnex Amsterdam Data Center; EdgeConnex: AMS05 Data Center; Beschikbare ontwikkelruimte voor datacenters — Gemeenteblad 2024, 549662

Location: EdgeConneX Amsterdam (EDCAMS01) — PeeringDB; Netherlands Environmental Management Policy 2023; Datacenterbeleid gemeente Haarlemmermeer — Gemeenteblad 2020, 306084

Stable identifier: 56c7b050-0ba3-4921-8fd6-86828e13d958