Finland / Site

Microsoft Vihti data center

Vihdin datakeskus

Under ConstructionPlanned

Microsoft cloud campus south of Nummela, comprising four buildings in the assessed plan. Construction is documented, with later expansion planned. Approximately 192 MW of planned campus IT capacity is reported in indexed EIA text; operational capacity is unconfirmed.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Microsoft
Ownership
Unknown / not established
Business model / scale
Owner Operated / Unknown
Region / metro
Uusimaa / Helsinki
City / locality
Vihti
Address
Hankasalontie 12, 03150 Huhmari, Finland
Location
Property identified by municipal address and parcel 927-406-5-201, corroborated by EIA locality between road 110 and motorway 1; no sourced point coordinates established.
Precision: area
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≈192 MW
IT load
Four-building campus assessed in the EIA
Planned · cumulative
2026-10-07Reported claim ↗

Excluded from capacity totals. As_of is the retrieval date of indexed primary-source text, not a confirmed design revision date. Direct PDF access failed. This exceeds 5 MW for the assessed planned campus, without establishing delivered capacity.

≈220 MW
Facility power
Campus peak electricity demand in the 2023 EIA programme
Planned · cumulative
2023-05-24Estimate claim ↗

Excluded from capacity totals. As_of is the date displayed in indexed programme text. Historical peak-demand estimate, distinct from IT load; current approved demand and grid reservation were not established.

Development timeline

  1. 2022-06-06 · announcement

    Vihti campus announced

    Microsoft named Vihti as the third campus in its Finnish datacenter region.

    Supporting source ↗
  2. 2023-04-03 · actual

    Rosti zoning became legally effective

    Date reported in Microsoft's May 2023 community update.

    Supporting source ↗
  3. 2024-06-05 · actual

    EIA reasoned conclusion issued

    Completion of environmental assessment procedure; not evidence of facility operation.

    Supporting source ↗
  4. 2024-09 · actual

    Preconstruction began

    Operator and contractor document initial site works; contractor passages disagree between 3 and 4 September, so month precision is retained.

    Supporting source ↗
  5. 2025-06 · actual

    Mercury became main contractor

    Destia continued earthworks.

    Supporting source ↗
  6. 2026-04-28 · announcement

    Second-phase construction decision confirmed

    Microsoft reported permits for all three campuses and intended a 2026 construction start.

    Supporting source ↗
  7. 2026–2027 · planned

    First-phase construction completion

    Expected around the turn of the year, followed by commissioning preparation; no operational date confirmed.

    Supporting source ↗

Disclosed specifications

Assessed land area

Approximately 60 ha

EIA project boundary, not independently verified land title area.

Source ↗

Municipal property identifier

927-406-5-201 MICROSOFT

Named property in municipal project announcement.

Source ↗

Assessed building count

Four datacenter buildings

Campus plan; first municipal construction phase comprises one building plus support facilities.

Source ↗

Project-responsible entity

Microsoft 3465 Finland Oy

EIA developer entity; does not establish legal land ownership.

Source ↗

Cooling concept

Direct outside-air cooling

Historical 2023 programme retrieved through indexed text; current installed design unconfirmed.

Source ↗

Heat recovery concept

Office heating and exploration of external heat reuse

Historical programme proposal; external offtake agreement and implemented system unconfirmed.

Source ↗

Electricity supply

National grid

Grid connection MW not established.

Source ↗

Construction contact

info.hel10@mercuryeng.com

Public project contact published by Microsoft; no contact attempted.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Vihdin datakeskus ↗

Published 2024-02-07 · Retrieved 2026-10-07

ELY project page, updated 5 June 2024: Microsoft 3465 Finland Oy is responsible; approximately 60 ha south of Nummela, between roads 110 and 1; four buildings assessed; national-grid electricity.

Microsoftin datakeskushanke etenee Vihdissä ↗

Published 2024-06-26 · Retrieved 2026-10-07

Municipality identifies parcel 927-406-5-201 and Hankasalontie 12, 03150 Huhmari. Initial phase comprises one datacenter building and support buildings.

Vihti datacenter project updates ↗

Published Date unavailable · Retrieved 2026-10-07

Operator construction updates identify Rosti business park; Mercury became main contractor in June 2025 and Destia continued earthworks.

Vihti – Ympäristövaikutusten arviointi ↗

Published Date unavailable · Retrieved 2026-10-07

Live indexed original-PDF text states approximately 192 MW IT capacity for four planned buildings. Direct open and linked open returned internal errors; document publication date was not independently inspected.

Vihdin datakeskus YVA-ohjelma ↗

Published 2023-05-24 · Retrieved 2026-10-07

Indexed original programme text displays 24 May 2023 and describes approximately 220 MW peak electricity demand, direct outside-air cooling, and exploration of external heat reuse. Direct PDF open failed.

Vihdin datakeskustontin esirakentaminen ↗

Published Date unavailable · Retrieved 2026-10-07

Contractor confirms Rosti location and ongoing earthworks; page reports bulk earth transport ended in week 40 of 2026. Historical start-date passages differ by one day.

Profile field evidence

Name: Vihti datacenter project updates; Microsoftin datakeskusalueen kolmas sijaintipaikkakunta on Vihti

Aliases: Vihdin datakeskus

Kind: Vihdin datakeskus; Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen

Country: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; Microsoftin datakeskusalueen kolmas sijaintipaikkakunta on Vihti

Region: Vihdin datakeskus; Vihdin datakeskustontin esirakentaminen

City: Vihdin datakeskus; Microsoftin datakeskushanke etenee Vihdissä

Metro: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen

Address: Microsoftin datakeskushanke etenee Vihdissä

Operator: Vihti datacenter project updates; Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen

Business Model: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; Microsoftin datakeskusalueen kolmas sijaintipaikkakunta on Vihti

Statuses: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; Vihdin datakeskustontin esirakentaminen

Summary: Vihdin datakeskus; Vihti – Ympäristövaikutusten arviointi; Vihdin datakeskustontin esirakentaminen

Location: Vihdin datakeskus; Microsoftin datakeskushanke etenee Vihdissä

Stable identifier: 60a529fa-6e99-4922-a389-742bf57b1976