DayOne Nusajaya Tech Park campus — capacity evidence ↗
Published Date unavailable · Retrieved 2026-09-11
Nusajaya campus phase 1: three data centers sharing 69.5 MW IT capacity.
Malaysia / Site
GDS Nusajaya Tech Park campus
69.5 MW covers phase 1 comprising Nusajaya 1, 2 and 3. It is not the ultimate capacity of every DayOne Johor campus.

Site / building photo
Property exterior: DayOne Nusajaya Tech Park campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
dayonedc.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 69.5 MW IT load | Cumulative phase 1 capacity across three buildings Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Retrieval date, not measurement date. Design ceiling is not proof of delivered/occupied load. Excluded from aggregates pending reconciliation. 69.5 MW covers phase 1 comprising Nusajaya 1, 2 and 3. It is not the ultimate capacity of every DayOne Johor campus. |
Source-backed research proposal; publication requires review.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Nusajaya campus phase 1: three data centers sharing 69.5 MW IT capacity.
Published Date unavailable · Retrieved 2026-09-11
Operator identifies separate Nusajaya and Kempas campuses; market-wide totals are not site allocations.
Published Date unavailable · Retrieved 2026-09-11
Named place result DayOne Nusajaya Tech Park (NTP) Data Center; POI coordinates 1.4342215, 103.5995893. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: DayOne Nusajaya Tech Park campus. Image reference: https://api.dayonedc.com/wp-content/uploads/2025/07/nusajaya-data-center-scaled.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
DayOne operator brand mark. Image reference: https://dayonedc.com/markets/singapores-dayone-breaks-ground-on-first-data-center-in-singapore#header-logo Visually inspected against the cited source and profile identity.
Name: DayOne Nusajaya Tech Park campus — capacity evidence
Operator: DayOne Nusajaya Tech Park campus — capacity evidence; DayOne · Johor campuses
Country: DayOne Nusajaya Tech Park campus — capacity evidence
Region: DayOne Nusajaya Tech Park campus — capacity evidence
Metro: DayOne Nusajaya Tech Park campus — capacity evidence
City: DayOne Nusajaya Tech Park campus — capacity evidence
Address: DayOne Nusajaya Tech Park campus — capacity evidence
Kind: DayOne Nusajaya Tech Park campus — capacity evidence
Aliases: DayOne Nusajaya Tech Park campus — capacity evidence
Statuses: DayOne Nusajaya Tech Park campus — capacity evidence
Summary: DayOne Nusajaya Tech Park campus — capacity evidence
Location: Google Maps · DayOne Nusajaya Tech Park (NTP) Data Center
Media: Property imagery · dayonedc.com
Operator Logo: Operator logo · dayonedc.com
Stable identifier: 6c9cd880-129d-4813-9a13-b4afe6818a18