Australia / Site

Beard Campus

OperationalPlanned

CDC's fourth Canberra-region campus comprises the initial BE1 facility and a planned Beard 2 expansion. Investor reporting confirms inaugural campus operations, while the undated operator location page still describes construction and 39 MW total capacity. The separate Beard 2 proposal discloses 84 MW; these figures are not reconciled or summed.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
CDC Data Centres
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Australian Capital Territory / Canberra
City / locality
Beard
Address
Block 25 Section 11, Beard, ACT
Location
Property identified by cadastral address and Tantalum Street/Copper Close access; no corroborated geographic point established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
39 MW
Unspecified power
Beard Campus as described by CDC's page, housing BE1
Under Construction · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of an undated page, not measurement or commissioning date. Page still describes construction despite investor reporting of inaugural operations. Basis is undisclosed; exceeds 5 MW as a reported development capacity.

84 MW
Unspecified power
Stage 2 / Beard 2, 12 data halls
Planned · incremental
2026-05-13Reported claim ↗

Excluded from capacity totals. As-of is signed environmental opinion date. Separate expansion capacity; opinion does not explicitly identify IT load versus facility or grid power. Backup generation is separate and not added.

Development timeline

  1. 2026-02-20 · announcement

    Inaugural Beard operations reported

    Infratil reported inaugural operations in its discussion of the 31 December 2025 valuation; exact commissioning date is not disclosed.

    Supporting source ↗
  2. 2026-05-13 · actual

    Conditional environmental significance opinion issued for Beard 2

    Opinion finds the proposal unlikely to cause significant adverse environmental impact subject to conditions; it is not evidence of construction commencement.

    Supporting source ↗
  3. 2026-09-30 · announcement

    Conditional Beard 2 development approval reported

    Industry reporting states conditional approval for the second campus stage; operational commencement is not established.

    Supporting source ↗

Disclosed specifications

Campus land area

47,644 sqm

Reported area of Block 25 Section 11; no independent cadastral measurement performed.

Source ↗

BE1 building

10 data halls; 15,347.76 sqm gross floor area

Industry reporting describes the existing first building; distinct from Beard 2.

Source ↗

Beard 2 building

Three storeys; 12 data halls; 29,924 sqm gross floor area

Planned second-stage building.

Source ↗

Future substation

Approximately 3,830 sqm

Proposed area, not a disclosed grid connection rating.

Source ↗

Beard 2 backup generators

Combined capacity up to 20 MW

Emergency generation only; excluded from data-centre capacity claims.

Source ↗

Cooling and energy approach

Closed-loop cooling; 100% renewable electricity by default

Reported CDC approach; no site-specific metered efficiency, water use or energy matching independently established.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Canberra | CDC Data Centres ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies Beard as CDC's fourth Canberra-region campus, intended to house BE1, currently described as under construction, with total capacity of 39 MW.

Infratil Newsletter – February 2026 ↗

Published 2026-02-20 · Retrieved 2026-10-09

Reports inaugural operations at Beard and Marsden Park and Brooklyn's second facility in discussion of the 31 December 2025 valuation. Its combined 196 MW increase is not Beard-specific.

Profile field evidence

Name: Canberra | CDC Data Centres

Aliases: Canberra | CDC Data Centres

Kind: Canberra | CDC Data Centres; Environmental Significance Opinion – Proposed Data Centre Development (Beard 2)

Country: Canberra | CDC Data Centres; New $200 million data centre proposed for Beard fits Territory standards on power and water

Region: Proposed Data Centre Stage 1 – BE1: Civil engineering cover and locality plan; New $200 million data centre proposed for Beard fits Territory standards on power and water

City: Proposed Data Centre Stage 1 – BE1: Civil engineering cover and locality plan; Environmental Significance Opinion – Proposed Data Centre Development (Beard 2)

Metro: Canberra | CDC Data Centres; Infratil Newsletter – February 2026

Address: Proposed Data Centre Stage 1 – BE1: Civil engineering cover and locality plan; Environmental Significance Opinion – Proposed Data Centre Development (Beard 2)

Operator: Canberra | CDC Data Centres; New $200 million data centre proposed for Beard fits Territory standards on power and water

Statuses: Infratil Newsletter – February 2026; Environmental Significance Opinion – Proposed Data Centre Development (Beard 2); CDC wins approval for AU$203.5m Beard 2 data centre in Canberra

Summary: Canberra | CDC Data Centres; Environmental Significance Opinion – Proposed Data Centre Development (Beard 2); Infratil Newsletter – February 2026

Location: Proposed Data Centre Stage 1 – BE1: Civil engineering cover and locality plan; Environmental Significance Opinion – Proposed Data Centre Development (Beard 2)

Stable identifier: 6fc670da-e495-4f0b-b0dc-882b632a24db