S7 Sydney Data Centre · NEXTDC S7 Data Centre, Eastern Creek · S7 Eastern Creek

Planned

Planned NEXTDC hyperscale campus in Eastern Creek, western Sydney. Operator material reports 550 MW+ IT capacity, while SSD-113934740 reports 612 MW without specifying the power basis. The planning portal remains at Prepare EIS. OpenAI collaboration is announced under an MoU; operation and development approval are not established.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
NEXTDC
Ownership
Unknown / not established
Business model / scale
Unknown / Hyperscale
Region / metro
New South Wales / Sydney
City / locality
Sydney
Address
Honeycomb Drive, Eastern Creek, NSW, Australia (street-level identification; street number unconfirmed)
Location
Eastern Creek locality established by operator sources; industry reporting places the parcel south of Honeycomb Drive and east of Future Archbold Road. No independently corroborated property point was obtained.
Precision: area
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≈550 MW
Unspecified power
Potential full S7 development
Planned · cumulative
2024-10-17Reported claim ↗

Excluded from capacity totals. Announcement-date potential capacity, subject to development approval; not commissioned load. Source does not explicitly identify IT versus total facility power.

≥550 MW
IT load
Future S7 campus IT capacity
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of date is retrieval of an undated operator page. Source displays 550 MW+ IT capacity; plus notation is retained as a lower-bound claim. FY26 presentation still reports approximately 550 MW+ planned power. Do not add to other campus figures.

612 MW
Unspecified power
Campus proposed under SSD-113934740
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of date is retrieval of the undated live planning record. Operational capacity describes the intended operating proposal, not an operational status. Power basis is unspecified and remains unreconciled with the operator IT figure.

Development timeline

  1. 2024-10-17 · announcement

    S7 land purchase agreement announced

    NEXTDC announced an agreement to buy the Eastern Creek site, with progressive FY25 settlements anticipated subject to conditions.

    Supporting source ↗
  2. 2025-12-05 · announcement

    OpenAI infrastructure MoU

    NEXTDC announced an MoU to collaborate on a hyperscale AI campus and GPU supercluster at S7.

    Supporting source ↗
  3. 2027 H2 · planned

    Initial phase delivery target

    First-phase delivery targeted for the second half of calendar 2027, subject to necessary approvals; no actual delivery established.

    Supporting source ↗

Disclosed specifications

Developable land area

Approximately 258,000 m²

Operator acquisition announcement; distinct from technical floor area.

Source ↗

Reported parcel area

255,135 m²

Industry reporting; difference from operator developable-area figure remains unresolved.

Source ↗

Planning reference

SSD-113934740; Blacktown LGA; Prepare EIS

Live planning record retrieved 2026-10-09; approval not established.

Source ↗

Proposed buildings

Three two-storey data-storage buildings

Portal description. Industry reporting describes nine preliminary buildings across three blocks; hierarchy and revision history require reconciliation.

Source ↗

Backup power and electrical infrastructure

340 diesel generators, diesel storage and onsite substation proposed

Planned infrastructure; grid connection capacity and energisation date not disclosed in the reviewed portal summary.

Source ↗

Planned cooling

Closed-loop high-density liquid cooling

December 2025 operator statement says ongoing potable drinking water would not be required for cooling; final approved engineering design is unconfirmed.

Source ↗

Public AI partnership

OpenAI MoU

Planning and development collaboration; does not establish an operating tenant, binding lease or allocated MW.

Source ↗

Initial capacity

TBD

Explicitly undisclosed in FY26 results presentation, page 32.

Source ↗

Capital structure

Third-party capital and JVCo options under evaluation

FY26 presentation discusses potential asset-level financing and partnerships for S4 and S7; no completed ownership transfer established.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

S7 Sydney Data Centre ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies Eastern Creek in Sydney, New South Wales; labels S7 in planning, hyperscale, and 550 MW+ IT capacity. Technical area remains TBD.

NEXTDC to Join OpenAI in Australia as an Infrastructure Partner ↗

Published 2025-12-05 · Retrieved 2026-10-09

Announces an OpenAI MoU for planning, developing and operating an AI campus at S7. Describes planned closed-loop liquid cooling without ongoing potable cooling water, and a first-phase target of second-half 2027 subject to approvals.

NEXTDC FY26 Results Presentation ↗

Published Date unavailable · Retrieved 2026-10-09

Page 32 lists S7 total planned power approximately 550 MW+, initial capacity TBD and Design & Town Planning, subject to development approval. Other slides say S7 planning works are in progress and capital-partnership options remain under evaluation.

NEXTDC FY26 Annual Report & Appendix 4E ↗

Published 2026-08-27 · Retrieved 2026-10-09

Lists S7 within the Australian Sydney portfolio. Discusses liquid and closed-loop cooling for development projects including S7. Consolidated entity disclosures list wholly owned S7 companies and trusts; this does not establish registered title to the site.

Profile field evidence

Name: S7 Sydney Data Centre; NEXTDC S7 Data Centre, Eastern Creek — NSW Planning Portal

Aliases: S7 Sydney Data Centre; NEXTDC S7 Data Centre, Eastern Creek — NSW Planning Portal

Kind: NEXTDC Announces Massive Expansion Plans with Acquisition of S7 Data Centre Site in Sydney; NEXTDC to Join OpenAI in Australia as an Infrastructure Partner

Country: S7 Sydney Data Centre; NEXTDC FY26 Annual Report & Appendix 4E

Region: S7 Sydney Data Centre

City: S7 Sydney Data Centre; NEXTDC to Join OpenAI in Australia as an Infrastructure Partner

Metro: S7 Sydney Data Centre; NEXTDC Announces Massive Expansion Plans with Acquisition of S7 Data Centre Site in Sydney

Address: NextDC S7 Australian data center to offer 612MW of capacity, OpenAI Stargate planned as customer

Operator: S7 Sydney Data Centre; NEXTDC to Join OpenAI in Australia as an Infrastructure Partner

Scale: S7 Sydney Data Centre; NEXTDC to Join OpenAI in Australia as an Infrastructure Partner

Statuses: S7 Sydney Data Centre; NEXTDC S7 Data Centre, Eastern Creek — NSW Planning Portal; NEXTDC FY26 Results Presentation

Summary: S7 Sydney Data Centre; NEXTDC S7 Data Centre, Eastern Creek — NSW Planning Portal; NEXTDC to Join OpenAI in Australia as an Infrastructure Partner; NEXTDC FY26 Results Presentation

Location: NEXTDC Announces Massive Expansion Plans with Acquisition of S7 Data Centre Site in Sydney; NextDC S7 Australian data center to offer 612MW of capacity, OpenAI Stargate planned as customer

Stable identifier: 734746ac-684c-40d3-9f61-e9ef3b47afc8