M1 Melbourne Data Centre ↗
Published Date unavailable · Retrieved 2026-10-09
Operator identifies M1 in Port Melbourne, with 16 MW IT capacity, 6,000 m² technical space and 3,000-rack capacity; describes power, cooling and connectivity.
Australia / Facility
M1 Melbourne · M1 Port Melbourne
Operational NEXTDC hyperscale colocation facility in Port Melbourne, distinct from M4 at Todd Road. Current operator materials report 16 MW IT capacity and a competing 15 MW target IT figure. Both exceed 5 MW; neither establishes currently available customer capacity.

Site / building photo
M1 Melbourne exterior hero, labelled by NEXTDC; direct visual inspection unavailable.
Published date unknown · Captured date unknown · Checked 2026-10-09
Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.
sec.nextdc.com · Source and attribution ↗Operator-hosted gallery offers download; no explicit reuse licence established. Photographer and capture date unknown. Confirm rights and visual suitability before import. Publication and capture dates were not independently established.
OSM-derived named-building coordinate from Mapcarta, corroborated approximately by the destination coordinates in NEXTDC's Google directions link and its Lorimer Street address; no survey or visually verified property marker.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 16 MW IT load | M1 facility advertised IT capacity Operational · cumulative | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. As-of is retrieval date of undated live page, not commissioning date. Current brochure also reports 16 MW. Available capacity is not disclosed. |
| 15 MW IT load | M1 facility target IT capacity Planned · cumulative | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. As-of is retrieval date of undated operator comparison. Status reflects the source's target qualifier, not a claim that M1 itself is unbuilt. Conflicts with 16 MW facility page; do not add the figures. |
| 12 MW IT load | M1 total ICT load in historical disclosure Operational · cumulative | 2012-11-15 | Reported claim ↗ Excluded from capacity totals. Historical 2012 meeting materials with attached valuation dated 15 November 2012. Not evidence of current load or availability; subsequent 15/16 MW claims may reflect later capacity changes. |
Official opening date recorded in NEXTDC meeting materials.
Supporting source ↗NEXTDC history records completed sale of M1, S1 and P1 property assets.
Supporting source ↗NEXTDC completed compulsory acquisition of APDC; group ownership of the previously leased property portfolio followed.
Supporting source ↗Dated news article announces certification; company history instead lists March 2019, leaving a chronology discrepancy.
Supporting source ↗Operator specifies hot aisle containment in halls 1–3 and cold aisle containment in halls 4–6.
Source ↗Operator describes DRUPS and at least 12 hours onsite fuel. Individual DRUPS rating is not facility capacity.
Source ↗Separate metropolitan facilities; does not establish a physical parent campus.
Source ↗Operator-reported; independent certificate validity not checked.
Source ↗Operator table labels both as 12-month averages but provides no measurement period.
Source ↗Historical apparent-power disclosure; not converted to MW without power-factor evidence.
Source ↗2012 disclosure; different from technical space and not land area.
Source ↗Supplier figures and rounded area; lists 2011 completion rather than operational opening.
Source ↗Historical operator announcement; current certification validity and renewable electricity share unresolved.
Source ↗Builder describes delivery with Greenbox Architecture.
Source ↗General operator business enquiry channels, not facility-specific contacts.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies M1 in Port Melbourne, with 16 MW IT capacity, 6,000 m² technical space and 3,000-rack capacity; describes power, cooling and connectivity.
Published Date unavailable · Retrieved 2026-10-09
Melbourne facility contacts identify M1 at 826 Lorimer Street, Port Melbourne VIC 3207, separately from the Brisbane headquarters; publishes a Google directions link.
Published Date unavailable · Retrieved 2026-10-09
Operator's regional comparison lists M1 at Lorimer Street and M4 at 127 Todd Road; M1 target IT capacity is 15 MW, with Tier III certifications and PUE figures.
Published Date unavailable · Retrieved 2026-10-09
Page 6 describes M1 as a 16 MW hyperscale colocation facility certified to UI Tier III. Publication date not established from filename.
Published Date unavailable · Retrieved 2026-10-09
Page 12 records opening on 4 July 2012, address 826–846 Lorimer Street, gross lettable area 17,354 m², 12 MW ICT load and three 7.5 MVA feeds. An attached valuation is dated 15 November 2012; filing publication date was not independently established.
Published Date unavailable · Retrieved 2026-10-09
Records M1 going live in July 2012, sale of M1/S1/P1 property assets to APDC in January 2013, and M1 cloud interconnection and NABERS milestones.
Published 2019-08-28 · Retrieved 2026-10-09
NEXTDC reports completed acquisition of M1 land and buildings during FY19.
Published Date unavailable · Retrieved 2026-10-09
Note 26 records APDC control acquired on 18 October 2018 and compulsory acquisition completed on 30 November 2018; NEXTDC group thereby owned the formerly leased property portfolio.
Published 2019-02-05 · Retrieved 2026-10-09
Operator announces M1 NABERS five-star infrastructure certification and describes its owned rooftop solar array and participation in the Melbourne Renewable Energy Project.
Published Date unavailable · Retrieved 2026-10-09
OSM-derived building entry supplies address 826–846 Lorimer Street and coordinate -37.82264, 144.93225. Its Equinix alias and municipal attribution are questionable and are not adopted.
Published Date unavailable · Retrieved 2026-10-09
Operator contact link resolves to the facility's street address and destination coordinates. The Maps listing body, photos and Street View were inaccessible; viewport coordinates were not used.
Published Date unavailable · Retrieved 2026-10-09
Builder describes purpose-built facility, integrated fitout, rooftop photovoltaic system, and collaboration with Greenbox Architecture.
Published Date unavailable · Retrieved 2026-10-09
Supplier describes six halls, 17,500 m² building size and 5,200 m² NORTEC raised flooring; lists 820 Lorimer Street and completion 2011, differing from operator address and opening milestone. Photographs credited to Fretwell Photography.
Published Date unavailable · Retrieved 2026-10-09
Public operator gallery labels M1 hero and exterior photographs and exposes original image links. Image inspection attempts failed; filenames are not treated as capture dates.
Published Date unavailable · Retrieved 2026-10-09
M1 Melbourne exterior hero, labelled by NEXTDC; direct visual inspection unavailable. Original image: https://nextdc.com/hubfs/Data%20centre%20images/HERO%20Shots/M1_01_Hero.jpg
Name: M1 Melbourne Data Centre; Contact us — NEXTDC
Aliases: M1 Melbourne Data Centre; Melbourne Data Centre Colocation Services
Kind: M1 Melbourne Data Centre; Melbourne Data Centres — technical specifications
Country: Melbourne Data Centre Colocation Services; Next DC – M1 Data Centre — Lindner Group
Region: Contact us — NEXTDC; Melbourne Data Centre Colocation Services
City: Contact us — NEXTDC
Metro: Melbourne Data Centre Colocation Services
Address: Contact us — NEXTDC; Melbourne Data Centre Colocation Services
Operator: M1 Melbourne Data Centre; Melbourne Data Centre Colocation Services
Owner: FY19 record results & FY20 earnings guidance; NEXTDC FY19 Annual Report
Business Model: Melbourne Data Centres — technical specifications
Scale: Melbourne Data Centres — technical specifications
Statuses: M1 Melbourne Data Centre; Melbourne Data Centre Colocation Services; NEXTDC Limited — extraordinary general meeting notice
Summary: M1 Melbourne Data Centre; Melbourne Data Centre Colocation Services; Melbourne Data Centres — technical specifications
Location: Contact us — NEXTDC; M1 Melbourne Data Centre — Mapcarta; NEXTDC-published Google Maps directions to M1 address
Stable identifier: 740a3add-950a-40c6-a5d9-717bcdfc0a45