South Korea / Site

Princeton Digital Group SE1

PDG SE1 · SE1 · Bupyeong KR1

Under Construction

Hyperscale cloud and AI development in Incheon, associated with ESR’s KR1 building developed with Wide Creek AMC and leased to PDG for fit-out and operations. PDG targets service in early 2028. Published power figures require reconciliation.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Princeton Digital Group
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Incheon / Greater Seoul
City / locality
Incheon
Address
414-2 Cheongcheon-dong, Bupyeong-gu, Incheon, South Korea
Location
Parcel address supported by industry directories; no corroborated facility-marker coordinates established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
48 MW
Unspecified power
PDG SE1 announced campus capacity
Planned · cumulative
2025-11-17Reported claim ↗

Excluded from capacity totals. Announcement date; no explicit IT/facility/grid definition. National 500 MW ambition excluded.

80 MW
Facility power
ESR KR1 building leased to PDG
Planned · cumulative
2025-11-17Reported claim ↗

Excluded from capacity totals. Announcement date; source explicitly defines facility load. Overlaps SE1 and must not be added to its 48 MW.

48 MW
IT load
PDG SE1 within KR1
Under Construction · cumulative
2026-10-07Reported claim ↗

Excluded from capacity totals. Retrieval-date observation of an undated directory claim; IT definition not confirmed in opened operator announcement.

50 MW
Unspecified power
ESR KR1 project for PDG
Under Construction · unclear
2026-10-07Conflicting claim ↗

Excluded from capacity totals. Retrieval date, not publication or engineering measurement date. Undated milestone figure differs from 48 MW and 80 MW; rounding, revision or another basis is unresolved.

Development timeline

  1. 2025-11-17 · announcement

    PDG announces South Korean entry and SE1

    Announces approximately USD 700 million investment and contracted power.

    Supporting source ↗
  2. 2025-11 · planned_construction_start

    Construction scheduled to commence

    PDG says later that month; ESR says the announcement week. These are announced schedules, not proof of actual start date.

    Supporting source ↗
  3. 2026-01-14 · reported_construction

    Parcel construction reported

    Sankun identifies ongoing DL E&C work at 414-2 Cheongcheon-dong.

    Supporting source ↗
  4. early 2028 · planned_service

    SE1 ready-for-service target

    Operator target; no actual commissioning established.

    Supporting source ↗

Disclosed specifications

Land area

Approximately 11,000 sqm

Campus land area, not floor area.

Source ↗

Development responsibilities

ESR and Wide Creek AMC: core and shell; PDG: internal fit-out and operations

Developer/tenant roles do not establish legal title ownership.

Source ↗

Building

Nine storeys

Announced KR1 building configuration.

Source ↗

Workload and cooling

High-density hyperscale cloud and AI; advanced cooling technologies

Operator gives no cooling topology or rack-density numbers.

Source ↗

Power procurement

Power fully contracted

Operator statement; contract quantity and terms undisclosed.

Source ↗

Sustainability design

LEED Gold objective; building-integrated photovoltaics and fuel cells

Targets/design features, not achieved certification or proven operating performance.

Source ↗

Connectivity

Carrier-neutral

Directory claim; named carriers and fibre routes unconfirmed.

Source ↗

Efficiency target

PUE below 1.28

Directory design claim, not measured operating PUE.

Source ↗

Electrical supply

Two 154 kV lines

Directory claim; utility documentation not established.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Princeton Digital SE1 ↗

Published Date unavailable · Retrieved 2026-10-07

Lists PDG SE1 under construction at 414-2 Cheongcheon-dong; describes ESR/Wide Creek development, carrier neutrality, target PUE below 1.28 and two 154 kV lines.

Princeton PDG: Bupyeong KR1 ↗

Published Date unavailable · Retrieved 2026-10-07

Connects SE1 with ESR’s KR1 at 414-2 Cheongcheon-dong and reports whole-building lease, construction and 48 MW IT within 80 MW facility load.

Where We Operate ↗

Published Date unavailable · Retrieved 2026-10-07

Current operator portfolio includes SE1 in South Korea, Incheon, designed for hyperscale cloud and AI; lists 48 MW and location N/A.

Stack: Incheon ICN01A ↗

Published Date unavailable · Retrieved 2026-10-07

Reports historical STACK proposal at the same parcel and subsequent ESR KR1/PDG SE1 development; succession remains secondary-source evidence.

Profile field evidence

Name: PDG Enters South Korea with USD 700 Million Data Center Investment; Where We Operate

Aliases: PDG Enters South Korea with USD 700 Million Data Center Investment; Princeton PDG: Bupyeong KR1

Kind: PDG Enters South Korea with USD 700 Million Data Center Investment

Country: PDG Enters South Korea with USD 700 Million Data Center Investment; Where We Operate

Region: PDG Enters South Korea with USD 700 Million Data Center Investment; ESR and Wide Creek AMC to Develop First Data Centre in South Korea

City: PDG Enters South Korea with USD 700 Million Data Center Investment; ESR and Wide Creek AMC to Develop First Data Centre in South Korea

Metro: PDG Enters South Korea with USD 700 Million Data Center Investment

Address: Princeton Digital SE1; Princeton PDG: Bupyeong KR1

Operator: PDG Enters South Korea with USD 700 Million Data Center Investment; ESR and Wide Creek AMC to Develop First Data Centre in South Korea

Business Model: Princeton Digital SE1; Princeton PDG: Bupyeong KR1

Scale: PDG Enters South Korea with USD 700 Million Data Center Investment; Where We Operate

Statuses: Achievements and Milestones That Define Success; 부평 데이터센터 건설 현장 확인·관리하기: 청천동, 국가산단, DL이앤씨

Location: Princeton Digital SE1; Where We Operate

Summary: PDG Enters South Korea with USD 700 Million Data Center Investment; ESR and Wide Creek AMC to Develop First Data Centre in South Korea; Princeton PDG: Bupyeong KR1; Achievements and Milestones That Define Success

Stable identifier: 76792bd8-4a4d-4684-b5b8-e1a4b6ba5095