Hyperscale, build-to-suit campus in Sedenak Tech Park, Kulai. Phase 1 opened in October 2022 with ByteDance announced as anchor tenant. BDC's current listing describes 508 MW total IT capacity and 15 buildings; commissioning status and boundaries of that expanded scope are not disclosed. Earlier sources describe three buildings and 100–110 MW. Operational status establishes an operating portion, not completion of every advertised building.
Last researched 2026-09-11Last verified Not independently verifiedPublished revision 2
Site / building photo
MY06 exterior project photograph from Asima Architects' gallery; capture date unknown.
Published date unknown · Captured date unknown · Checked 2026-09-11
Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.
Publisher identifies this as a project photograph. No reuse license established; obtain permission from the rights holder. Publication and capture dates were not independently established.
Site profile
Operator
Bridge Data Centres
Ownership
Bridge Data Centres Malaysia III Sdn. Bhd.
Business model / scale
Colocation / Hyperscale
Region / metro
Johor / Unknown
City / locality
Kulai
Address
17 Jalan Digital 7, Sedenak Tech Park, 81000 Kulai, Johor, Malaysia
Location
PeeringDB facility geocode associated with 17 Jalan Digital 7; address corroborated by Data Center Map. Nearby supplied pin 1.700129, 103.41227 remains user-reported and unverified. No surveyed boundary or exact building point established. Precision: approximate · 1.700833, 103.4125 View location on map →
Parent
Not assigned
Location detail
PeeringDB facility geocode associated with 17 Jalan Digital 7; address corroborated by Data Center Map. Nearby supplied pin 1.700129, 103.41227 remains user-reported and unverified. No surveyed boundary or exact building point established.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
17 Jalan Digital 7, Sedenak Tech Park, 81000 Kulai, Johor, Malaysia
Loading local map…
Capacity evidence
Statements retain their dates, definitions and development scope. Do not add these rows together.
Claim / measurement
Scope and status
As of
Evidence and accounting
110 MW Unspecified power
Original three-building MY06 campus, including opened Phase 1 Planned · cumulative
Excluded from capacity totals. As-of is opening-release date. Campus project capacity, not capacity commissioned at opening; release does not explicitly distinguish IT from facility power.
100 MW IT load
Directory's original three-building MY06 full build-out Planned · cumulative
Excluded from capacity totals. As-of is retrieval of an undated listing, not claim publication or commissioning date. Conflicts with original 110 MW description; may be stale.
508 MW IT load
Current operator-advertised MY06 campus across 15 buildings Unknown · cumulative
Excluded from capacity totals. As-of is retrieval of undated live operator page. Listed as total IT capacity; operational, construction and planned portions are unspecified. Relationship to original campus footprint and capacity unresolved.
20 MW Unspecified power
Initial MY06 phase reported by DCD Operational · incremental
Excluded from capacity totals. As-of is article publication. Its stated October 2021 go-live conflicts with official groundbreaking/opening chronology; retain reported MW with this caveat, without adopting its live date.
>100 MW Unspecified power
MY06 facility contribution described in Building 1 certification announcement; exact phase scope unclear Planned · unclear
Excluded from capacity totals. As-of is announcement date. Source prospectively says facility will add more than 100 MW by end-2025. Achievement not established. The accompanying 600 MW refers to all BDC facilities and is excluded from this site's capacity.
Development timeline
2021-11 · actual_groundbreaking
MY06 groundbreaking
Groundbreaking month retrospectively reported in the official opening release.
Building 1 provisional Green Mark Platinum disclosed
BDC announced provisional certification under the BCA-IMDA international data-centre framework; subsequent operator wording omits provisional without establishing the conversion date.
Government-hosted opening release identifies MY06 in Sedenak, Johor, Malaysia; first of three buildings opened; project described as 110 MW on 38 acres; groundbreaking November 2021; ByteDance System Sdn. Bhd. anchor tenant.
Current operator listing gives MY06 total IT capacity 508 MW, 15 buildings, 275 kV intake, 99.999% uptime SLA and high-density readiness; no phase-specific commissioning breakdown.
Facility record associates Bridge Data Centres with 17 Jalan Digital 7, Sedenak Tech Park, Kulai, Johor 81000, Malaysia, and geocode 1.700833, 103.4125. Record displays last update 2025-09-26 and public sales email.
Directory corroborates street address and describes wholesale hyperscale campus with three buildings, 40 acres and 100 MW IT load. Lists neighboring facilities separately.
Project architect identifies Kulai, Johor; client Bridge Data Centres Malaysia III Sdn. Bhd.; site area 40.774 acres; Phase 1 completed; exterior project photograph gallery.
Current operator describes Bain Capital backing and hyperscale, build-to-suit and colocation services. History records Johor expansion; 2025 awards list Green Mark Platinum as provisional.
Project consultant reports completed development and 156,868 m2 gross floor area. Owner field names Bridge Data Centres Malaysia III Sdn Bhd alongside PMX Malaysia Sdn Bhd, expressly identified as D&B contractor.
Operator identifies provisional Green Mark Platinum for MY06 Building 1; describes PPVC, cold plate and indirect evaporative cooling. Says facility will add more than 100 MW by end-2025 in context of 600 MW across all BDC facilities; precise MY06 phase scope unclear.
Reports 110 MW full build-out, three buildings, PPVC, initial 20 MW phase and cooling design targeting annualized PUE below 1.2. Its October 2021 live date conflicts with the MIDA October 2022 opening chronology.
Sponsored account attributes cold plate liquid cooling and annualized PUE below 1.2 to MY06. Separately locates effluent-water treatment at MY07 in Ulu Tiram.
Contractor portfolio lists Bridge Kulai P3/P4 and MY06 Phase 5-1 plus Phase 5-7 Zone D. Does not establish current progress or a complete phase hierarchy.
Operator identifies MY06 as its first Johor campus, reports Building 1 Green Mark Platinum without the earlier provisional qualifier, and distinguishes the 400 MW Ulu Tiram campus and water-treatment project.
MY06 exterior project photograph from Asima Architects' gallery; capture date unknown. Original image: https://framerusercontent.com/images/KDhAz9sOEaLlgWhd2o4iGdI0NM.jpeg?height=563&width=1000
Bridge Data Centres operator brand mark. Image reference: https://www.bridgedatacentres.com/wp-content/uploads/2026/06/BDC-Logo.webp Visually inspected against the cited source and profile identity.