Map
Sign in
← Explore registry

Singapore / Facility

Digital Loyang I · SIN11

Operational

New Digital Loyang facility: 13.2 MW IT capacity.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
Property exterior: Digital Realty SIN11.

Site / building photo

Property exterior: Digital Realty SIN11.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

www.theedgesingapore.com · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
Digital Realty
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Unknown / Singapore
City / locality
Singapore
Address
Unknown
Location
PeeringDB facility geocode; independently verified block/building placement remains pending.
Precision: approximate · 1.370929, 103.968336
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode; independently verified block/building placement remains pending.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
13.2 MW
IT load
Reported design capacity; energized and occupied load not established
Operational · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review.

Development timeline

  1. No dated milestones established.

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Property imagery · www.theedgesingapore.com ↗

Published Date unavailable · Retrieved 2026-09-11

Property exterior: Digital Realty SIN11. Image reference: https://edgemarkets-transferred.s3-ap-southeast-1.amazonaws.com/styles/article_detail_v2/s3/Digital%20Realty%20SIN11%20%281%29.jpg Visually inspected against the cited source and profile identity.

Operator logo · www.digitalrealty.com ↗

Published Date unavailable · Retrieved 2026-09-11

Digital Realty operator brand mark. Image reference: https://res.cloudinary.com/digitalrealty/image/upload/f_auto,c_limit,w_3840,q_auto/images/logo.png Visually inspected against the cited source and profile identity.

Profile field evidence

Name: Digital Realty Digital Loyang opening

Operator: Digital Realty Digital Loyang opening

Country: Digital Realty Digital Loyang opening

Region: Digital Realty Digital Loyang opening

Metro: Digital Realty Digital Loyang opening

City: Digital Realty Digital Loyang opening

Kind: Digital Realty Digital Loyang opening

Statuses: Digital Realty Digital Loyang opening

Summary: Digital Realty Digital Loyang opening

Aliases: Digital Realty Digital Loyang opening

Location: PeeringDB — Digital Realty Singapore SIN11; Digital Realty Digital Loyang opening

Media: Property imagery · www.theedgesingapore.com

Operator Logo: Operator logo · www.digitalrealty.com

Stable identifier: 8435c820-49ff-4248-9287-3371ef0542b8