TY13x · エクイニクスTY13x · Tokyo Data Centre 5

Operational

Operational Equinix xScale hyperscale colocation facility in Inzai, Chiba, serving the Tokyo market and physically distinct from adjacent TY12x. Its opening announcement reported 8 MW in the first phase and 36 MW ultimate IT capacity. Industry reporting identifies it as Tokyo Data Centre 5 in a Keppel acquisition; an official milestones page reports completion in October 2026 without a closing day, leaving ownership as of October 9 unresolved.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
Contractor-published TY13x property image; visual suitability and capture date unconfirmed.

Site / building photo

Contractor-published TY13x property image; visual suitability and capture date unconfirmed.

Published date unknown · Captured date unknown · Checked 2026-10-09

Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.

www.shinryo.com · Source and attribution ↗
Image rights and date notes

Published by Shinryo; no reusable license established. Indexed related report credits Emina Mitsui, Kawasumi-Kobayashi Kenji Photograph Office, but image-specific attribution requires confirmation. Permission required before import or redistribution. Publication and capture dates were not independently established.

Site profile

Operator
Equinix
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Chiba Prefecture / Tokyo
City / locality
Inzai
Address
Izumino 2-chome, Inzai, Chiba 270-1360, Japan
Location
Operator-established locality: Izumino 2-chome, Inzai. No property point corroborated against accessible Maps or parcel evidence.
Precision: area
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
8 MW
IT load
TY13x first opening phase
Operational · incremental
2023-06-30Reported claim ↗

Excluded from capacity totals. As of the English announcement dateline; its present-tense first-phase figure is explicitly identified as IT power in companion source s2. Does not establish today's total commissioned capacity.

36 MW
IT load
TY13x ultimate full build, including opening phase
Planned · cumulative
2023-06-29Reported claim ↗

Excluded from capacity totals. As of the displayed Japanese archive publication date. Full-build target, not evidence that 36 MW was operational then or now. Overlaps c1 and must not be added to it.

14 MW
Unspecified power
TY13x claimed fully built-out/critical power on reseller page
Operational · unclear
2026-10-09Conflicting claim ↗

Excluded from capacity totals. As_of records retrieval of an undated claim, not commissioning or measurement date. Page mixes 14 MW with 36 MW IT potential and outdated opening language; no primary corroboration or reliable capacity basis found.

Development timeline

  1. 2023-04 · actual_completion_reported

    Contractor reports building completion

    Shinryo reports TY13x completed in April 2023; its scope may differ from later fit-out or investment-property completion dates.

    Supporting source ↗
  2. 2023-06-30 · announcement_of_actual_opening

    Equinix announces TY13x opening

    English release announces opening of the initial phase. Japanese archive displays June 29; the English dateline is June 30.

    Supporting source ↗
  3. 2026-09-01 · announcement

    Keppel announces proposed acquisition

    Keppel filing proposes purchase of majority economic interests in Tokyo Data Centre 4 and 5. TY13x correspondence is supplied by industry source s4; sellers and continuing operator are unnamed in the filing.

    Supporting source ↗
  4. 2026-10 · actual_acquisition_completion_reported

    Official milestones page reports October completion

    Month-only completion statement for Tokyo Data Centre 4 and 5 was visible on retrieval. Exact closing day and its relationship to October 9 require confirmation.

    Supporting source ↗

Disclosed specifications

Gross floor area — contractor

21,398 m²

Shinryo's April 2023 completed-building account. Retained separately from Keppel's area description.

Source ↗

Gross floor area — acquisition filing

Approximately 233,549 sq ft

Tokyo Data Centre 5, linked to TY13x by s4. Measurement differs from the contractor's figure; no reconciliation attempted.

Source ↗

Net lettable area

Approximately 101,160 sq ft

Tokyo Data Centre 5 in Keppel filing; not gross building area or land area.

Source ↗

Building form

Five storeys; seismic base isolation

Keppel filing. SemanticNet describes six storeys; counting methodology is unresolved.

Source ↗

UPS redundancy

N+1

Listed on current official TY13x page.

Source ↗

Cooling redundancy

N+20%

Listed on current official TY13x page; does not specify rack density or cooling capacity.

Source ↗

Cooling system

Chilled-water loops through thermal-storage tanks on each floor; backup HVAC and dual power arrangements

Mechanical contractor's facility-specific account.

Source ↗

Business continuity equipment

Backup generation and emergency drainage storage

Contractor description; generator count and ratings not established from a primary source.

Source ↗

Published compliance standards

ISO 22301; ISO 27001; ISO 9001; PCI DSS; SOC 1 Type II; SOC 2 Type II

Operator facility-page list; certificate scope, issue dates and expiry dates were not inspected.

Source ↗

Connectivity

Tokyo interconnection ecosystems accessible through customers' selected network providers

Opening release does not establish that every named Tokyo exchange or cloud provider is physically present at TY13x.

Source ↗

Occupancy and tenants

100% occupied; two clients

Tokyo Data Centre 5 in September 2026 acquisition filing. Tenant names undisclosed; occupancy does not establish MW utilization.

Source ↗

Smart Hands

Not available

Current Equinix service-availability documentation.

Source ↗

Business contact route

Sales and support links on official TY13x facility page

Public contact entry points observed; no form submitted and no contact initiated.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

TY13x — Equinix official facility page ↗

Published Date unavailable · Retrieved 2026-10-09

Lists Inzai, Chiba, Izumino 2-chome, postal code 270-1360, Japan. Lists N+1 UPS, N+20% cooling redundancy and six compliance standards; embedded map requires JavaScript.

Milestones — Keppel DC REIT ↗

Published Date unavailable · Retrieved 2026-10-09

Live page states that acquisition of Tokyo Data Centre 4 and 5 completed in October 2026, without specifying a day. This cannot establish whether closing preceded the research-date cutoff.

産業 — エクイニクスTY13x — 新菱冷熱工業株式会社 ↗

Published Date unavailable · Retrieved 2026-10-09

Mechanical contractor identifies TY13x, April 2023 completion and 21,398 m² gross floor area. Describes seismic isolation, backup generation, emergency drainage storage and chilled-water loops through thermal-storage tanks on each floor; supplies a property image.

Property photo · www.shinryo.com ↗

Published Date unavailable · Retrieved 2026-10-09

Contractor-published TY13x property image; visual suitability and capture date unconfirmed. Original image: https://www.shinryo.com/assets/img/sustainability/resilience_logistics_center/resilience_university_img01.png

Profile field evidence

Name: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; TY13x — Equinix official facility page

Aliases: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; GIC-Equinix JV Selling Tokyo Data Centres to Keppel DC REIT in $1.2B Deal; 産業 — エクイニクスTY13x — 新菱冷熱工業株式会社

Kind: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; 産業 — エクイニクスTY13x — 新菱冷熱工業株式会社

Country: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; TY13x — Equinix official facility page

Region: エクイニクス、東京で第二番目の ハイパースケーラー向けデータセンター「TY13x」を開設; TY13x — Equinix official facility page

City: TY13x — Equinix official facility page

Metro: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; Colocation Availability — Equinix Product Documentation

Address: TY13x — Equinix official facility page

Operator: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; TY13x — Equinix official facility page; GIC-Equinix JV Selling Tokyo Data Centres to Keppel DC REIT in $1.2B Deal

Business Model: GIC-Equinix JV Selling Tokyo Data Centres to Keppel DC REIT in $1.2B Deal; Acquisition of Two Hyperscale Colocation Data Centres Located in Inzai City, Greater Tokyo, Japan

Scale: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; エクイニクス、東京で第二番目の ハイパースケーラー向けデータセンター「TY13x」を開設

Statuses: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; TY13x — Equinix official facility page; Colocation Availability — Equinix Product Documentation

Summary: Equinix Supports Growing Demand for Cloud Services with Its Second xScale Data Center in Tokyo; エクイニクス、東京で第二番目の ハイパースケーラー向けデータセンター「TY13x」を開設; TY13x — Equinix official facility page; GIC-Equinix JV Selling Tokyo Data Centres to Keppel DC REIT in $1.2B Deal; Milestones — Keppel DC REIT

Location: TY13x — Equinix official facility page

Media: Property photo · www.shinryo.com

Stable identifier: 8440dac8-fce6-4c77-9599-ed4f19f90b7f