← SIC Quantum Data Centre CyberjayaPublished history
Restoring content creates a new revision. Previous revisions remain in the audit trail.
Revision 3 · Current
2026-10-10 04:29 UTC
Published profile snapshot
SIC Quantum Data Centre Cyberjaya · Malaysia · SIC Quantum Data Centre
Planned 65 MW AI/HPC data centre in Cyber Valley, Cyberjaya, developed through SIC Quantum Data Centre, a joint venture of Selangor Industrial Corporation and Data Centre Union. The project was announced in June 2026 with an estimated RM2.5 billion development value and planned immersion cooling. Electrical capacity basis, actual construction commencement and parcel ownership remain unresolved.
Capacity statements: 2 · Sources: 9
65 MW (exact) · unspecified · Reported design/development capacity; delivered share unconfirmed · 2026-09-11
65 MW (exact) · unspecified · Announced SQDC Cyberjaya development total; phase allocations undisclosed · 2026-06-23
Revision 2
2026-09-11 11:26 UTC
Published profile snapshot
SIC Quantum Data Centre Cyberjaya · Malaysia · SIC Quantum Data Centre
Joint venture announcement establishes planned site and MW; exact parcel, chronology and electrical basis remain unknown.
Capacity statements: 1 · Sources: 2
65 MW (exact) · unspecified · Reported design/development capacity; delivered share unconfirmed · 2026-09-11
Revision 1
2026-09-11 10:44 UTC
Published profile snapshot
SIC Quantum Data Centre Cyberjaya · Malaysia · SIC Quantum Data Centre
Joint venture announcement establishes planned site and MW; exact parcel, chronology and electrical basis remain unknown.
Capacity statements: 1 · Sources: 1
65 MW (exact) · unspecified · Reported design/development capacity; delivered share unconfirmed · 2026-09-11