Map
Sign in
← Explore registry

Malaysia / Site

Computility Technology Johor

Under Construction

Directory header lists 300 MW; power basis and phased delivery remain unknown.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
Architectural rendering: ZDATA Johor GP3.

Rendering

Architectural rendering: ZDATA Johor GP3.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

www.zdatacn.com · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
ZDATA
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Johor / Johor Bahru
City / locality
Iskandar Puteri
Address
Jalan Bayu 4, Nusajaya Industrial Park 2
Location
Property coordinate not established; no city centroid substituted.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
300 MW
Unspecified power
Advertised full-build/design capacity; commissioned share unconfirmed
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Retrieval date, not measurement date. Design ceiling is not proof of delivered/occupied load. Excluded from aggregates pending reconciliation. Directory header lists 300 MW; power basis and phased delivery remain unknown.

Development timeline

  1. No dated milestones established.

Disclosed specifications

Research clarification · 2026-09-11

Operator confirmed by its own project announcement; this source does not confirm directory-reported 300 MW.

Source-backed research proposal; publication requires review.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Property imagery · www.zdatacn.com ↗

Published Date unavailable · Retrieved 2026-09-11

Architectural rendering: ZDATA Johor GP3. Image reference: https://www.zdatacn.com/public/storage/upload/files/20250313/62586cabb803d6d45255997fad1622a2.jpg Visually inspected against the cited source and profile identity.

Operator logo · www.zdatacn.com ↗

Published Date unavailable · Retrieved 2026-09-11

ZDATA operator brand mark. Image reference: https://www.zdatacn.com/public/static/index/images/logo.png Visually inspected against the cited source and profile identity.

Profile field evidence

Name: ZDATA Johor GP3 — capacity evidence

Operator: ZDATA Johor GP3 — capacity evidence; ZDATA · GP3 groundbreaking

Country: ZDATA Johor GP3 — capacity evidence

Region: ZDATA Johor GP3 — capacity evidence

Metro: ZDATA Johor GP3 — capacity evidence

City: ZDATA Johor GP3 — capacity evidence

Address: ZDATA Johor GP3 — capacity evidence

Kind: ZDATA Johor GP3 — capacity evidence

Aliases: ZDATA Johor GP3 — capacity evidence

Statuses: ZDATA Johor GP3 — capacity evidence

Summary: ZDATA Johor GP3 — capacity evidence

Media: Property imagery · www.zdatacn.com

Operator Logo: Operator logo · www.zdatacn.com

Stable identifier: 895fee1e-c3ea-4868-adf1-d7e89d4a8a50