Map
Sign in
← BW Digital NDP1

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 4 · Current

2026-10-09 23:33 UTC

Published profile snapshot

BW Digital NDP1 · Indonesia · BW Digital

BW Digital-owned colocation development at Nongsa Digital Park, Batam, designed for enterprise, cloud and AI workloads. Current specifications describe up to 144 MW IT across two buildings; this is a full-build design ceiling. Structural topping-off occurred on 7 October 2025. Operator construction language and differing 2026 service targets remain online; a directory's 24 MW live-power claim is unresolved and actual commissioning is unconfirmed. Existing coordinates identify the park reference area, not the NDP1 property footprint.

Capacity statements: 6 · Sources: 21

144 MW (exact) · it · Reported design capacity; energized and occupied load not established · 2026-09-11

144 MW (exact) · it · NDP1 total design ceiling across two buildings · None

80 MW (exact) · unspecified · Original announced data-centre ceiling · 2024-03-04

120 MW (exact) · it · NDP1 total design on legacy project detail page · None

24 MW (exact) · it · First NDP1 module targeted for availability in Q1 2026 · None

24 MW (exact) · unspecified · Directory field labelled Live Power for BW Digital NDP1 · None

Revision 3

2026-09-11 12:15 UTC

Published profile snapshot

BW Digital NDP1 · Indonesia · BW Digital

Two-building design ceiling, not delivered capacity. Operator projects page still says under construction with Q1 2026 target; actual completion unconfirmed.

Capacity statements: 1 · Sources: 4

144 MW (exact) · it · Reported design capacity; energized and occupied load not established · 2026-09-11

Revision 2

2026-09-11 09:58 UTC

Published profile snapshot

BW Digital NDP1 · Indonesia · BW Digital

Two-building design ceiling, not delivered capacity. Operator projects page still says under construction with Q1 2026 target; actual completion unconfirmed.

Capacity statements: 1 · Sources: 3

144 MW (exact) · it · Reported design capacity; energized and occupied load not established · 2026-09-11

Revision 1

2026-09-11 09:07 UTC

Published profile snapshot

BW Digital NDP1 · Indonesia · BW Digital

Two-building design ceiling, not delivered capacity. Operator projects page still says under construction with Q1 2026 target; actual completion unconfirmed.

Capacity statements: 1 · Sources: 2

144 MW (exact) · it · Reported design capacity; energized and occupied load not established · 2026-09-11