AirTrunk TOK2 Tokyo West

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

TOK2 · AirTrunk TOK2

OperationalPlanned

Operational AirTrunk hyperscale campus in western Tokyo, with further campus capacity planned. Initial phases reportedly exceeded 60 MW at opening; ultimate scalability exceeds 110 MW. Secondary sources identify Ome, but a primary-source street address and property coordinate were not established.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
AirTrunk
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Tokyo Prefecture / Tokyo
City / locality
Ome
Address
Unknown
Location
Western Tokyo; secondary property and market sources identify Ome. No corroborated facility point established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
>60 MW
IT load
TOK2 initial phases at opening
Operational · cumulative
2024-05-14Reported claim ↗

Excluded from capacity totals. Announcement-date claim. IT basis follows the announcement's portfolio IT-load context; no separate TOK2 electrical schedule disclosed. Included within ultimate campus capacity.

>110 MW
IT load
TOK2 ultimate campus scalability
Planned · cumulative
2024-05-14Reported claim ↗

Excluded from capacity totals. Announcement-date ultimate scalability, not commissioned capacity. IT basis follows portfolio wording; includes initial phases.

≈50 MW
Unspecified power
TOK2 second phase maximum scalability
Under Construction · incremental
2023-02-21Reported claim ↗

Excluded from capacity totals. Groundbreaking announcement-date claim for this phase; electrical basis unspecified. Part of campus, not additive to ultimate 110+ MW. Current commissioning unknown.

Development timeline

  1. 2022-05-16 · announcement

    TOK2 announced

    AirTrunk announced its second Tokyo campus.

    Supporting source ↗
  2. 2022-11-17 · actual_reported

    Campus construction commenced

    Operator reported groundbreaking and commencement of construction.

    Supporting source ↗
  3. 2023-02-21 · actual_reported

    Second phase groundbreaking

    Operator reported commencement of the approximately 50 MW scalable phase.

    Supporting source ↗
  4. 2024-05-14 · actual_reported

    TOK2 opened

    Operator announced opening with initial phases exceeding 60 MW.

    Supporting source ↗
  5. 2027-03-31 · planned

    2C building planned completion

    Secondary building source reports this target; not evidence of achieved completion or current construction.

    Supporting source ↗

Disclosed specifications

Campus land area

4.6 hectares

Current facility page; announcement describes more than 4.6 hectares. Rounded campus figure.

Source ↗

Power supply

66 kV high-voltage feeds

Voltage only; no grid MW inferred.

Source ↗

Design PUE

1.15

Design target, not measured operating performance.

Source ↗

Cooling

Direct air-free cooling

Operator-disclosed design terminology.

Source ↗

Connectivity

Carrier neutral; multiple entry paths

Named carriers and routes not disclosed on opened facility page.

Source ↗

Availability commitment

100% availability backed by SLAs

Operator marketing commitment; not independently measured uptime.

Source ↗

Development partner

Daiwa House Industry

Operator names partner for TOK2 development.

Source ↗

Corporate ownership change

Blackstone and CPP Investments acquisition completed

Corporate platform ownership; TOK2 legal property owner remains unresolved.

Source ↗

Building client

TOK2特定目的会社

Secondary building source; does not establish current land or building title.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

TOK2 Tokyo West | AirTrunk ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies a multi-building hyperscale campus in Tokyo Prefecture; lists 110+ MW, 4.6 ha, carrier neutrality, 66 kV feeds and design PUE 1.15.

Greater Tokyo — H2 2024 | Cushman & Wakefield ↗

Published Date unavailable · Retrieved 2026-10-09

Development table pairs TOK1 E/A and TOK2 B with Inzai and Ome respectively; reports 27.5 MW / 12 MW and construction status. Footnote defines capacity as total IT load.

AT TOK2 Project 2B棟 | 超高層ビル部 ↗

Published 2024-05-21 · Retrieved 2026-10-09

Updated 2025-11-25; identifies TOK2 in Ome and parcel Shinmachi 6-chome 16-21, names TOK2 special-purpose company as building client, and reports building completion followed by fit-out.

AT TOK2 Project 2C棟 | 超高層ビル部 ↗

Published 2024-05-21 · Retrieved 2026-10-09

Identifies a planned third building adjoining 2B; reports unstarted construction at a May 2025 observation and planned completion 2027-03-31. Government records cited by author were not independently opened.

Profile field evidence

Name: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future; TOK2 Tokyo West | AirTrunk

Aliases: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future

Kind: TOK2 Tokyo West | AirTrunk

Country: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future; AirTrunk scales up in Japan with announcement of second Tokyo hyperscale data centre

Region: TOK2 Tokyo West | AirTrunk

City: Greater Tokyo — H2 2024 | Cushman & Wakefield; AT TOK2 Project 2B棟 | 超高層ビル部

Metro: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future; AirTrunk scales up in Japan with announcement of second Tokyo hyperscale data centre

Operator: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future; AirTrunk breaks ground on TOK2; Begins construction on 110+MW facility in West Tokyo

Business Model: TOK2 Tokyo West | AirTrunk; AirTrunk breaks ground on second phase of TOK2 data centre

Scale: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future; TOK2 Tokyo West | AirTrunk

Statuses: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future; AT TOK2 Project 2C棟 | 超高層ビル部

Summary: AirTrunk opens second Tokyo hyperscale data centre to accelerate Japan’s digital future; TOK2 Tokyo West | AirTrunk; Greater Tokyo — H2 2024 | Cushman & Wakefield; AT TOK2 Project 2B棟 | 超高層ビル部

Location: TOK2 Tokyo West | AirTrunk; Greater Tokyo — H2 2024 | Cushman & Wakefield; AT TOK2 Project 2B棟 | 超高層ビル部

Stable identifier: 8a28c1be-1c37-48ac-a0b2-1389c9fa2787