Indonesia / Site

DayOne Kabil Industrial Tech Park campus

DayOne KITP

Planned

Grid agreement only. The operator supplies the MW equivalence; no independent MVA conversion or IT-load inference.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
DayOne
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Riau Islands / Batam
City / locality
Batam
Address
Kabil Integrated Industrial Estate, Batam
Location
Kabil industrial estate reference only; operator campus and individual building footprints unresolved.
Precision: area · 1.1098077, 104.1375694
View location on map →
Parent
Not assigned

Location detail

Kabil industrial estate reference only; operator campus and individual building footprints unresolved.. Coordinate precision: area. Street-map detail does not increase the accuracy of the sourced point.

Kabil Integrated Industrial Estate, Batam

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≈450 MW
Grid connection
Reported design capacity; energized and occupied load not established
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. Grid agreement only. The operator supplies the MW equivalence; no independent MVA conversion or IT-load inference.

Development timeline

  1. No dated milestones established.

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

DayOne Kabil power agreement ↗

Published Date unavailable · Retrieved 2026-09-11

Kabil campus PPA: operator explicitly reports 511 MVA as approximately 450 MW.

Data Center Map — address comparison ↗

Published Date unavailable · Retrieved 2026-09-11

Directory's DayOne Kabil Industrial Tech Park listing places the development in Kabil Integrated Industrial Estate. Shared estate reference only; operator parcel unresolved.

OpenStreetMap — Kabil Integrated Industrial Estate ↗

Published Date unavailable · Retrieved 2026-09-11

Kabil Integrated Industrial Estate, Batu Besar, Nongsa, Batam, Kepulauan Riau, Indonesia; representative estate point 1.1098077, 104.1375694. © OpenStreetMap contributors, ODbL. Not the data center parcel.

Operator logo · dayonedc.com ↗

Published Date unavailable · Retrieved 2026-09-11

DayOne operator brand mark. Image reference: https://dayonedc.com/markets/singapores-dayone-breaks-ground-on-first-data-center-in-singapore#header-logo Visually inspected against the cited source and profile identity.

Profile field evidence

Name: DayOne Kabil power agreement

Operator: DayOne Kabil power agreement

Country: DayOne Kabil power agreement

Region: DayOne Kabil power agreement

Metro: DayOne Kabil power agreement

City: DayOne Kabil power agreement

Kind: DayOne Kabil power agreement

Statuses: DayOne Kabil power agreement

Summary: DayOne Kabil power agreement

Aliases: DayOne Kabil power agreement

Address: Data Center Map — address comparison

Location: Data Center Map — address comparison; OpenStreetMap — Kabil Integrated Industrial Estate

Operator Logo: Operator logo · dayonedc.com

Stable identifier: 8b39585c-aca1-481a-b4b6-9f42918e799b