Seoul colocation facility developed and operated by the STT GDC–Hyosung joint venture. Commercial operations began in June 2026, with up to 30 MW disclosed IT capacity; commissioned or occupied load is not disclosed.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
STT GDC Korea (Hyosung STT GDC joint venture)
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Seoul / Seoul
City / locality
Seoul
Address
345-26, Gasan-dong, Geumcheon-gu, Seoul, South Korea
Location
PeeringDB facility geocode associated with the operator-confirmed Gasan-dong address; building footprint and Google Maps marker were not independently corroborated.
Precision: approximate · 37.473354, 126.882697
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode associated with the operator-confirmed Gasan-dong address; building footprint and Google Maps marker were not independently corroborated.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

345-26, Gasan-dong, Geumcheon-gu, Seoul, South Korea

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
30 MW
IT load
STT Seoul 1 maximum supported IT capacity
Operational · cumulative
2026-06-16Reported claim ↗

Excluded from capacity totals. Announcement date; source says up to 30 MW. This is an upper design/support limit, not measured demand or proof all capacity is commissioned.

Development timeline

  1. 2021 · actual

    Development and operating joint venture established

    STT GDC and Hyosung Heavy Industries established the joint venture; opening announcement reports respective interests of 60% and 40%.

    Supporting source ↗
  2. Q2 2025 · planned

    Earlier ready-for-service target

    Earlier factsheet target; does not establish actual commencement of service.

    Supporting source ↗
  3. 2025 · actual

    Architect-reported construction completion

    Junglim lists completion in 2025, distinct from commercial opening in 2026.

    Supporting source ↗
  4. 2026-05-19 · announcement

    Tier III design certification announced

    Uptime Institute design-document certification reported; June commercial launch remained targeted at this date.

    Supporting source ↗
  5. 2026-06 · actual

    Full commercial operations began

    Operator's June 16 announcement reports commercial commencement during June.

    Supporting source ↗
  6. 2026-09-02 · actual

    Global operator acquisition completed

    KKR-led consortium with Singtel acquired STTGDC; local property ownership implications are unestablished.

    Supporting source ↗

Disclosed specifications

Gross floor area — operator

39,594.7 m²

July 2026 factsheet; differs from architect's area.

Source ↗

Net lettable area

7,420 m²

Not identified as exclusively white space.

Source ↗

Site area

7,092 m²

Architect disclosure.

Source ↗

Gross floor area — architect

39,691.19 m²

Different from operator's 39,594.7 m²; measurement basis unresolved.

Source ↗

Building footprint and floors

3,779.68 m²; B2 and 10 above-ground floors

Architect project description.

Source ↗

Development arrangement

Project financing with lease-to-own model; client Gasan Landmark Datacenter PFV Co. Ltd.

Client is not treated as verified current legal owner.

Source ↗

Rack power density

Up to 12 kW per rack without supplemental cooling

Official Seoul page; total rack count absent.

Source ↗

Power resilience

Two 22.9 kV supplies, distributed redundant UPS, N+1 generators with up to 24-hour full-load fuel support

Voltage and redundancy do not establish grid MW capacity.

Source ↗

Cooling

N+1 chilled-water plant and cooling towers; N+2 fan-wall units; chilled-water buffer tank

Design specifications.

Source ↗

Energy efficiency

Design PUE below 1.3

Design target; measured operating PUE unknown.

Source ↗

Connectivity

Carrier-neutral; two MDF rooms and three diverse fibre entries

July 2026 factsheet; May announcement instead describes dual telecom entry points. Named carriers unconfirmed.

Source ↗

Uptime certification

Tier III Certification of Design Documents

Announced May 2026; constructed-facility certification not established.

Source ↗

LEED

Gold certification claimed at opening

July 2026 factsheet still says pre-certified; current registry status unresolved.

Source ↗

TIA certification history

Rated-3 design documents; certificate TIA942KR240813001

Initial certification August 13, 2024; displayed validity ended August 12, 2025. Renewal unknown.

Source ↗

Business contact

info@sttelemediagdc.com

Public general contact in operator factsheet.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

STT Seoul 1 Factsheet, July 2026 edition ↗

Published Date unavailable · Retrieved 2026-10-07

Current download from the operator's July 16, 2026 resource page; supplies parcel address, building areas, IT load and infrastructure specifications. Certification qualifications remain pre-certified or targeted.

STT Seoul 1 — PeeringDB ↗

Published Date unavailable · Retrieved 2026-10-07

Lists the same parcel address, STT GDC organization and geocode 37.473354, 126.882697; record updated September 26, 2025.

Seoul — STTGDC ↗

Published Date unavailable · Retrieved 2026-10-07

Official Seoul facility page identifies Gasan-dong locality, 30 MW IT load and up to 12 kW per rack without supplemental cooling.

STT Seoul 1 Data Center — Data Center Map ↗

Published Date unavailable · Retrieved 2026-10-07

Describes hyperscale and retail colocation services at the same address and distinguishes nearby KT, K-Square, SK Broadband and DCI properties.

Profile field evidence

Name: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; Certificate of Conformance: Hyosung STT GDC Inc., STT Seoul 1

Kind: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; STT Seoul 1 (STT Global Data Center) — Junglim Architecture

Country: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; Certificate of Conformance: Hyosung STT GDC Inc., STT Seoul 1

Region: STT Seoul 1 Factsheet, July 2026 edition; STT Seoul 1 (STT Global Data Center) — Junglim Architecture

City: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; STT Seoul 1 Factsheet, July 2026 edition

Metro: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; Chairman Cho Hyun-joon Continues Power Equipment Success Story with AI Data Centers

Address: STT Seoul 1 Factsheet, July 2026 edition; Certificate of Conformance: Hyosung STT GDC Inc., STT Seoul 1

Operator: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; Certificate of Conformance: Hyosung STT GDC Inc., STT Seoul 1; Chairman Cho Hyun-joon Continues Power Equipment Success Story with AI Data Centers

Business Model: STT Seoul 1 Data Center — Data Center Map

Scale: Chairman Cho Hyun-joon Continues Power Equipment Success Story with AI Data Centers

Statuses: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; Chairman Cho Hyun-joon Continues Power Equipment Success Story with AI Data Centers

Summary: ST Telemedia Global Data Centres Opens STT Seoul 1, Extending Its Platform into South Korea; STT Seoul 1 Data Center — Data Center Map

Location: STT Seoul 1 — PeeringDB; STT Seoul 1 Factsheet, July 2026 edition

Stable identifier: 91b8c714-5cfa-4a53-b80f-0ee53b896cad