Australia / Site

MEL2 Melbourne

Planned

Planned multi-building hyperscale campus in Melbourne's north-west. Victorian permit records associate Airtrunk MEL2 Pty Ltd with 85 Sharps Road, Tullamarine. AirTrunk announces over 354 MW of campus capacity; its power basis and actual construction progress remain unresolved.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
AirTrunk
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Victoria / Melbourne
City / locality
Tullamarine
Address
85 Sharps Road, Tullamarine VIC 3043
Location
Government permit address established; no independently corroborated property point or Google Maps marker obtained.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
>354 MW
Unspecified power
Ultimate MEL2 campus capacity across multiple buildings
Planned · cumulative
2025-12-24Reported claim ↗

Excluded from capacity totals. As-of date is the operator announcement date. Source says over 354 MW, without specifying IT, facility or grid basis. Current undated facility page repeats 354+ MW. Exceeds 5 MW on a reported unspecified-capacity basis; not evidence of operating load.

Development timeline

  1. 2025-12-24 · announcement

    MEL2 site acquisition announced

    AirTrunk announces acquisition for its second Melbourne campus and more than A$5 billion direct investment.

    Supporting source ↗
  2. 2026-06-26 · actual planning decision

    Campus design amendment permitted

    Government register records approval reducing data hall buildings from eight to five and relocating plant to ground level.

    Supporting source ↗
  3. 2026-08-14 · actual planning decision

    Waste management plan correction permitted

    Government register records a permit correction associated with the waste management plan.

    Supporting source ↗
  4. 2027 H2 · planned opening

    Reported opening target

    CRN reports opening scheduled for the second half of 2027 through multi-phase construction; target is not an actual commissioning date or full-campus completion confirmation.

    Supporting source ↗

Disclosed specifications

Land area

8.070 ha

Operator facility-page figure; no boundary survey independently checked.

Source ↗

Gross floor area

45,578 m²

Operator design disclosure.

Source ↗

Technical data halls

Up to 32; 42,240 m²

Operator page; hall count differs from building count. Compatibility with amended five-building plans needs review.

Source ↗

Permitted data hall buildings

5, reduced from 8

June 2026 amendment; does not establish completed buildings.

Source ↗

Connectivity

Carrier neutral with multiple entry paths

No named carriers or measured network capacity established.

Source ↗

Electrical feeds

66 kV diverse high-voltage power feed

Voltage is not MW capacity or evidence of energisation.

Source ↗

Design PUE

1.15

Design target, not measured operating efficiency.

Source ↗

Security and hosting positioning

Australian Government Certified Strategic hosting provider; designed for SCEC Zone 3 or higher

Operator wording; scope available on request. No independent MEL2-specific completed certification established.

Source ↗

Corporate investors

Blackstone and CPP Investments led consortium, alongside Robin Khuda

Corporate ownership disclosed by AirTrunk; registered site land ownership remains unresolved.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

MEL2 Melbourne | AirTrunk ↗

Published Date unavailable · Retrieved 2026-10-09

Operator describes a multiple-building hyperscale campus, 354+ MW total capacity, 8.070 ha, 45,578 square metres gross floor area, up to 32 technical halls, carrier neutrality, 66 kV feeds and design PUE 1.15.

Our Investors | AirTrunk ↗

Published Date unavailable · Retrieved 2026-10-09

AirTrunk says a Blackstone and CPP Investments led consortium acquired the company in 2024 alongside founder Robin Khuda; this establishes corporate ownership rather than land title.

Profile field evidence

Name: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; MEL2 Melbourne | AirTrunk

Aliases: MEL2 Melbourne | AirTrunk

Kind: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; MEL2 Melbourne | AirTrunk

Country: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne

Region: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; Victorian ministerial permit register — PA2403452-1 correction

City: Victorian ministerial permit register — PA2403452-1 correction; Victorian ministerial permit register — PA2403452-1 amendment

Metro: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; MEL2 Melbourne | AirTrunk

Address: Victorian ministerial permit register — PA2403452-1 correction; Victorian ministerial permit register — PA2403452-1 amendment

Operator: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; MEL2 Melbourne | AirTrunk

Business Model: MEL2 Melbourne | AirTrunk

Scale: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; MEL2 Melbourne | AirTrunk

Statuses: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; Victorian ministerial permit register — PA2403452-1 amendment; AirTrunk unveils second Melbourne campus, operational from 2027

Location: Victorian ministerial permit register — PA2403452-1 correction; Victorian ministerial permit register — PA2403452-1 amendment

Summary: AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; MEL2 Melbourne | AirTrunk; Victorian ministerial permit register — PA2403452-1 correction; Victorian ministerial permit register — PA2403452-1 amendment

Stable identifier: 972d1d45-02b0-4cf0-80c7-c1ed04652ee0