Operator identifies Aviolanda 1 in Rozenburg, Netherlands; advertises colocation, 20.7 MW critical IT load, 40 MW full build-out, IT areas and infrastructure.
Netherlands / Site
NTT Amsterdam 1 · AMS1 · e-shelter AMS1
Operational colocation campus in Rozenburg, municipality of Haarlemmermeer, serving the Amsterdam/Schiphol market. NTT advertises 20.7 MW critical IT capacity and 40 MW at full build-out. Expansion was described as under construction in the March 2023 brochure and remains so in an undated industry campus listing; current completion is unconfirmed. Represented once at campus level.
PeeringDB facility geocode associated with Aviolanda 1; address corroborated by NTT and government property evidence. Marker position was not visually checked against property boundaries; no block or surveyed accuracy claimed.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 20.7 MW IT load | Advertised existing Amsterdam 1 campus critical IT capacity Operational · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of undated operator page, not commissioning date or measured consumption. Supports reported capacity above 5 MW. |
| 40 MW IT load | Amsterdam 1 campus at full build-out Planned · cumulative | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date of undated operator page. Full-build figure is not additional to existing capacity; conflicts with simple addition of brochure figures. |
| 22 MW IT load | Additional capacity in buildings C and D Under Construction · incremental | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. As-of is retrieval date only; brochure edition is explicitly March 2023, with no exact publication day. Construction status describes that edition and is not independently confirmed current. Do not add to 20.7 MW without reconciliation against 40 MW ultimate claim. |
| 6 MW IT load | Initial phase-one capacity in original development announcement Under Construction · incremental | 2018-03-28 | Reported claim ↗ Excluded from capacity totals. Announcement date; phase one was scheduled for early 2019. Historical starting capacity, not current campus total. |
| 39.6 MW IT load | Original ultimate campus design capacity, described as up to 39.6 MW Planned · cumulative | 2018-03-28 | Reported claim ↗ Excluded from capacity totals. Announcement date. Source states an upper limit; schema has no upper-bound qualifier, so exact records the stated design ceiling rather than guaranteed delivery. Later operator pages use 40 MW. |
| 20 MW IT load | Phase one as described in PeeringDB facility notes Operational · cumulative | 2025-09-26 | Conflicting claim ↗ Excluded from capacity totals. As-of is record last-updated date, not necessarily the date the notes or capacity were revised. Differs from operator's 20.7 MW existing claim. |
| 10 MW Unspecified power | Fully built-out power on opened industry specification page; campus/building scope unclear Unknown · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date. Opened page differs from search extract and operator campus data; retained as an unresolved secondary claim. |
NTT announced e-shelter site acquisition and construction, with phase one planned for early 2019.
Supporting source ↗English release records opening ceremony and describes phase-one colocation as live.
Supporting source ↗Japanese release schedules service commencement on this date; distinction from April inauguration remains unresolved.
Supporting source ↗March 2023 edition describes C/D as under construction; this is a dated source statement, not a confirmed construction-start date.
Supporting source ↗Operator-advertised figures; industry listings use different areas.
Source ↗Site acquired by e-shelter as reported in 2018; current campus boundaries unconfirmed.
Source ↗Brochure qualification differs from undated webpage wording. Apparent power is not converted into MW.
Source ↗Brochure also describes weather-dependent energy management and heat recovery for standby-system preheating.
Source ↗Operator descriptions; connection does not establish AMS-IX equipment on site.
Source ↗PeeringDB entries are connectivity evidence, not proof of contractual tenancy.
Source ↗2019 Japanese announcement equivalents, not a current installed-rack inventory.
Source ↗Facility webpage public contact; brochure lists different phone numbers.
Source ↗March 2023 brochure contact; current validity unconfirmed.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies Aviolanda 1 in Rozenburg, Netherlands; advertises colocation, 20.7 MW critical IT load, 40 MW full build-out, IT areas and infrastructure.
Published Date unavailable · Retrieved 2026-10-09
Footer explicitly marks edition 03/23. Names NTT Global Data Centers AMS1 B.V., Rozenburg (NH), existing 20.7 MW and additional 22 MW in buildings C/D under construction; describes technical infrastructure.
Published 2019-04-11 · Retrieved 2026-10-09
Original NTT announcement records campus inauguration, live phase-one colocation and ultimate 40 MW IT load.
Published 2018-03-28 · Retrieved 2026-10-09
NTT reports e-shelter acquired a 40,000 m² site, construction underway, four phases across two buildings, initial 6 MW and ultimate capacity up to 39.6 MW.
Published Date unavailable · Retrieved 2026-10-09
Facility record names NTT DATA's Global Data Centers division, Aviolanda 1, Netherlands and geocode 52.283746, 4.744425. Last updated September 26, 2025; notes describe 20 MW phase one.
Published Date unavailable · Retrieved 2026-10-09
Municipal policy identifies E-Shelter at Aviolanda 1, Corneliahoeve. Historical construction status is not treated as current.
Published Date unavailable · Retrieved 2026-10-09
Government permit document identifies a new data center at Aviolanda 1, Rozenburg, municipality of Haarlemmermeer, and cable works connecting to Vijfhuizen substation. Source URL spelling should be reconciled with the research-trail URL before import.
Published Date unavailable · Retrieved 2026-10-09
Industry campus listing identifies NTT DATA operation in Rozenburg serving Amsterdam, operational Building A and Building B under construction, 20.7 MW existing and 22 MW expansion.
Published Date unavailable · Retrieved 2026-10-09
Links C/D expansion to Amsterdam 1 at Aviolanda 1; displays year built 2025 without an opened commissioning announcement.
Published Date unavailable · Retrieved 2026-10-09
Operator advertises tours for June 9, 2026, supporting continued public presentation of Amsterdam 1 as an active facility; does not establish expansion commissioning.
Published 2019-04-11 · Retrieved 2026-10-09
Japanese announcement schedules service commencement June 1, 2019, and gives initial 4,000 m²/1,600 rack equivalents and ultimate 16,000 m²/6,400 rack equivalents.
Published Date unavailable · Retrieved 2026-10-09
Opened page displays 10 MW fully built-out power and 2,800 m², inconsistent with its search extract and campus figures; scope and currency are unresolved.
Name: Amsterdam 1 Data Center | NTT; e-shelter opens its first data center in the Netherlands
Aliases: e-shelter opens its first data center in the Netherlands; NTT Amsterdam 1 Data Center (AMS 1) - PeeringDB
Kind: e-shelter opens its first data center in the Netherlands; GDC - Amsterdam 1 Campus | Data Center Map
Country: Amsterdam 1 Data Center | NTT; Site brochure: Amsterdam 1 Data Center
Region: Site brochure: Amsterdam 1 Data Center
City: Amsterdam 1 Data Center | NTT; Watervergunning: hoogspanningsverbinding Vijfhuizen–Aviolanda 1 Rozenburg
Metro: Amsterdam 1 Data Center | NTT; GDC - Amsterdam 1 Campus | Data Center Map
Address: Amsterdam 1 Data Center | NTT; Site brochure: Amsterdam 1 Data Center; Watervergunning: hoogspanningsverbinding Vijfhuizen–Aviolanda 1 Rozenburg
Operator: NTT Amsterdam 1 Data Center (AMS 1) - PeeringDB; GDC - Amsterdam 1 Campus | Data Center Map; Amsterdam 1 Data Center Tour, 9 June | NTT DATA
Business Model: Amsterdam 1 Data Center | NTT; e-shelter opens its first data center in the Netherlands; e-shelter's growth trajectory across Europe continues as it announces first data center in Amsterdam
Statuses: e-shelter opens its first data center in the Netherlands; Site brochure: Amsterdam 1 Data Center; GDC - Amsterdam 1 Campus | Data Center Map
Summary: Amsterdam 1 Data Center | NTT; Site brochure: Amsterdam 1 Data Center; e-shelter opens its first data center in the Netherlands; Watervergunning: hoogspanningsverbinding Vijfhuizen–Aviolanda 1 Rozenburg; GDC - Amsterdam 1 Campus | Data Center Map
Location: NTT Amsterdam 1 Data Center (AMS 1) - PeeringDB; Amsterdam 1 Data Center | NTT; Watervergunning: hoogspanningsverbinding Vijfhuizen–Aviolanda 1 Rozenburg
Stable identifier: 97848193-f8e6-46f8-ad8f-6ae6903ba0b8