Map
Sign in
← Eleveight AI Gagarin campus

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 2 · Current

2026-10-07 07:32 UTC

Published profile snapshot

Eleveight AI Gagarin campus · Armenia · Eleveight AI

Operational AI facility with expansion qualifying it above 5 MW. Current operator roadmap totals 40 MW, while earlier announcements described 35 MW. Historical live electrical load was 1.2 MW; phase-one design capacity is not proof of present delivered load.

Capacity statements: 4 · Sources: 9

40 MW (exact) · unspecified · Current operator full-expansion target · None

5 MW (exact) · unspecified · Phase 1 design envelope · None

1.2 MW (exact) · facility · Electrical capacity reported in use at June opening · 2026-06-01

35 MW (exact) · unspecified · Earlier full-scale expansion reservation · 2026-06-01

Revision 1

2026-10-07 06:44 UTC

Published profile snapshot

Eleveight AI Gagarin campus · Armenia · Eleveight AI

Operational AI facility with expansion qualifying it above 5 MW. Current operator roadmap totals 40 MW, while earlier announcements described 35 MW. Historical live electrical load was 1.2 MW; phase-one design capacity is not proof of present delivered load.

Capacity statements: 4 · Sources: 5

40 MW (exact) · unspecified · Current operator full-expansion target · None

5 MW (exact) · unspecified · Phase 1 design envelope · None

1.2 MW (exact) · facility · Electrical capacity reported in use at June opening · 2026-06-01

35 MW (exact) · unspecified · Earlier full-scale expansion reservation · 2026-06-01