Published profile snapshot
Eleveight AI Gagarin campus · Armenia · Eleveight AI
Operational AI facility with expansion qualifying it above 5 MW. Current operator roadmap totals 40 MW, while earlier announcements described 35 MW. Historical live electrical load was 1.2 MW; phase-one design capacity is not proof of present delivered load.
Capacity statements: 4 · Sources: 9
40 MW (exact) · unspecified · Current operator full-expansion target · None
5 MW (exact) · unspecified · Phase 1 design envelope · None
1.2 MW (exact) · facility · Electrical capacity reported in use at June opening · 2026-06-01
35 MW (exact) · unspecified · Earlier full-scale expansion reservation · 2026-06-01
Revision 1
2026-10-07 06:44 UTC
Published profile snapshot
Eleveight AI Gagarin campus · Armenia · Eleveight AI
Operational AI facility with expansion qualifying it above 5 MW. Current operator roadmap totals 40 MW, while earlier announcements described 35 MW. Historical live electrical load was 1.2 MW; phase-one design capacity is not proof of present delivered load.
Capacity statements: 4 · Sources: 5
40 MW (exact) · unspecified · Current operator full-expansion target · None
5 MW (exact) · unspecified · Phase 1 design envelope · None
1.2 MW (exact) · facility · Electrical capacity reported in use at June opening · 2026-06-01
35 MW (exact) · unspecified · Earlier full-scale expansion reservation · 2026-06-01