Japan / Site

Osaka OSK12 Data Center

NTT Osaka OSK12 Data Center · Osaka North 1 Data Center · 大阪北データセンター

Under ConstructionPlanned

Two-building NTT campus in Nishiai, Ibaraki, in Japan's Kansai region. The first 18 MW IT phase broke ground in October 2025 and is advertised for delivery in 2028; ultimate campus IT capacity is 36 MW. The second building was announced for completion in 2032. Campus represented once; capacities overlap and must not be added.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
NTT DATA Global Data Centers
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Osaka Prefecture / Osaka
City / locality
Ibaraki
Address
Unknown
Location
Operator establishes Nishiai, Ibaraki, Osaka Prefecture; no corroborated property point or full street address.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
18 MW
IT load
First building / first phase
Under Construction · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated operator page retrieved on as_of date; advertised capacity for 2028 delivery, not operating capacity. Included in campus total.

36 MW
IT load
Ultimate two-building campus
Planned · cumulative
2025-05-27Reported claim ↗

Excluded from capacity totals. Announcement date; explicitly describes total IT capacity at completion. Includes first and second buildings, not additional capacity beyond them.

18 MW
Unspecified power
Second building
Planned · incremental
2025-05-27Reported claim ↗

Excluded from capacity totals. Announcement date; future second building adds 18 MW in 2032. Paragraph says power without independently specifying its basis; surrounding announcement describes total campus IT load.

Development timeline

  1. 2025-05-13 · announcement

    Nishiai land acquisition disclosed

    Eight acres acquired for two data centers totaling 36 MW; first facility targeted for FY2027.

    Supporting source ↗
  2. 2025-05-27 · announcement

    Osaka North development announced

    NTT DATA Group and NTT GDC announce two-building campus.

    Supporting source ↗
  3. 2025-10-01 · actual_groundbreaking

    First building groundbreaking

    Operator post reports October 1; dated DCD report establishes 2025 year.

    Supporting source ↗
  4. FY2027 second half · planned_service_start

    Original first-phase service target

    Fiscal-year precision preserved from Japanese announcement.

    Supporting source ↗
  5. 2028 · planned_delivery

    Current advertised first-phase delivery

    Undated operator page advertises 2028; operator groundbreaking post specifies early 2028. These are compatible with the original fiscal-year window but actual completion is unconfirmed.

    Supporting source ↗
  6. 2032 · planned_completion

    Second building completion

    Schedule in May 2025 announcement; later confirmation not located.

    Supporting source ↗

Disclosed specifications

Land

Eight acres

Acquisition disclosure; no precise parcel boundary established.

Source ↗

First-building server space

Approximately 5,000 m²

Planned first-phase server rooms, not campus gross floor area.

Source ↗

Building design

Three stories; seismic isolation

First phase design.

Source ↗

Cooling

N+1 wall-blown air conditioning; air-cooled modular chiller; DLC available

Webpage description. Brochure instead lists a water-cooling system; reconcile before selecting a definitive mechanical specification.

Source ↗

Utility and backup

2N 77 kV utility supply; N+1 diesel generator or gas turbine with 48-hour autonomy; generator and UPS 4N/3

Brochure design claims; generator technology presented as alternatives. Voltage does not establish grid MW.

Source ↗

Connectivity

Carrier-neutral; four building cable entry points; two meet-me rooms

Brochure specifications; IOWN APN implementation is planned in announcement.

Source ↗

Resilience standards

Uptime Tier III and J-Tier 3 equivalent design

Design equivalence; no awarded Uptime certification established.

Source ↗

Prospective certifications

ISO 27001, PCI DSS, SOC 1 Type 2, SOC 2 Type 2

Brochure explicitly says considering obtaining; not established certifications.

Source ↗

Sustainability

Preparing for net-zero operation

Project intent within NTT DATA's corporate targets; no site-specific renewable contract, PUE or achieved net-zero status disclosed.

Source ↗

Public business contact

gdc-pmkj@ntt.com

Product/service marketing contact published in development announcement; no contact made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

大阪府での新たなデータセンターの建設について ↗

Published 2025-05-27 · Retrieved 2026-10-09

NTT DATA Group and NTT GDC announce Osaka North: 36 MW total IT capacity; first three-story seismic-isolated building with 18 MW and approximately 5,000 m² server rooms. First service scheduled for FY2027 second half; second building in 2032. Describes developer and sustainability plans.

Osaka OSK12 Data Center — Global Data Centers site brochure ↗

Published Date unavailable · Retrieved 2026-10-09

Brochure identifies Japan/Kansai, NTT Global Data Centers and cages/suites. Lists IT space, utility voltage, backup, connectivity and prospective certifications. Cooling description differs from facility webpage.

NTT Global Data Centers — Breaking Ground in Osaka ↗

Published Date unavailable · Retrieved 2026-10-09

Public operator post reports October 1 groundbreaking, a 36 MW Ibaraki campus, first of two buildings at 18 MW, early-2028 completion and design for hyperscalers. Exact post publication date not displayed.

NTT breaks ground on Osaka data center, Japan ↗

Published 2025-10-09 · Retrieved 2026-10-09

Dated industry report corroborates October 1, 2025 groundbreaking and early-2028 first-building delivery; explicitly labels accompanying property image an NTT GDC rendering.

Nishiai Building CASBEE assessment R7-0057 ↗

Published Date unavailable · Retrieved 2026-10-09

Design assessment dated September 24, 2025 lists Nishiai, three floors, site 33,009 m², building footprint 9,365 m², gross floor area 20,415 m², planned December 2027 completion and B- rating. Direct OSK12 identity linkage remains unconfirmed.

Profile field evidence

Name: Global Data Centers: Osaka OSK12 Data Center | NTT DATA

Aliases: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; 大阪府での新たなデータセンターの建設について; NTT Global Data Centers — Breaking Ground in Osaka

Kind: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; 大阪府での新たなデータセンターの建設について

Country: NTT DATA Expands Global Data Center Footprint with Land Acquisitions Across Seven Strategic Markets; Osaka OSK12 Data Center — Global Data Centers site brochure

Region: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; 大阪府での新たなデータセンターの建設について

City: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; 大阪府での新たなデータセンターの建設について

Metro: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; NTT Global Data Centers — Breaking Ground in Osaka

Operator: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; Osaka OSK12 Data Center — Global Data Centers site brochure

Business Model: Osaka OSK12 Data Center — Global Data Centers site brochure

Scale: NTT Global Data Centers — Breaking Ground in Osaka

Statuses: NTT Global Data Centers — Breaking Ground in Osaka; NTT breaks ground on Osaka data center, Japan; 大阪府での新たなデータセンターの建設について

Summary: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; 大阪府での新たなデータセンターの建設について; NTT Global Data Centers — Breaking Ground in Osaka; NTT breaks ground on Osaka data center, Japan

Location: Global Data Centers: Osaka OSK12 Data Center | NTT DATA; NTT DATA Expands Global Data Center Footprint with Land Acquisitions Across Seven Strategic Markets

Stable identifier: 9a3a33df-2f44-4e31-a7c0-36939f58a4e2