Racks Central RCJM Johor campus — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
Iskandar Halal Park campus has up to 510 MW planned; initial RCJM1 offers 70 MW IT, targeting Q1 2027.
Malaysia / Site
Full-campus MW basis is not explicit; the first-phase 70 MW is explicitly IT. No duplicate building entry is created.

Rendering
Architectural rendering: Racks Central RCJM Johor campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
www.rackscentral.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 510 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Full-campus MW basis is not explicit; the first-phase 70 MW is explicitly IT. No duplicate building entry is created. |
| 70 MW IT load | Initial RCJM1 phase, included in campus development; target Q1 2027 Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Full-campus MW basis is not explicit; the first-phase 70 MW is explicitly IT. No duplicate building entry is created. |
No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Iskandar Halal Park campus has up to 510 MW planned; initial RCJM1 offers 70 MW IT, targeting Q1 2027.
Published Date unavailable · Retrieved 2026-09-11
Named place result Racks Central Sdn Bhd (RCJM); POI coordinates 1.5275158, 103.924844. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
Architectural rendering: Racks Central RCJM Johor campus. Image reference: https://framerusercontent.com/images/zDZqECSqwJifgu11hbea7N0G3E.png?width=960&height=540 Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
Racks Central operator brand mark. Image reference: https://framerusercontent.com/assets/GFpocIIf7h9ZmYfFWkwMV8fs3Ug.png Visually inspected against the cited source and profile identity.
Name: Racks Central RCJM Johor campus — supporting evidence
Kind: Racks Central RCJM Johor campus — supporting evidence
Country: Racks Central RCJM Johor campus — supporting evidence
Region: Racks Central RCJM Johor campus — supporting evidence
Metro: Racks Central RCJM Johor campus — supporting evidence
Operator: Racks Central RCJM Johor campus — supporting evidence
Statuses: Racks Central RCJM Johor campus — supporting evidence
Summary: Racks Central RCJM Johor campus — supporting evidence
Location: Google Maps · Racks Central Sdn Bhd (RCJM)
Media: Property imagery · www.rackscentral.com
Operator Logo: Operator logo · www.rackscentral.com
Stable identifier: 9cc261cf-353a-4e6a-9288-04df1c87a260