Map
Sign in
← Explore registry

Design ceiling; this source does not prove how much is commissioned. The CSV's Cikarang expansion toward 200 MW is not established by the cited page.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
Property exterior: NeutraDC Serpong.

Site / building photo

Property exterior: NeutraDC Serpong.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

www.neutradc.com · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
NeutraDC
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
West Java / Greater Jakarta
City / locality
South Tangerang
Address
Unknown
Location
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Precision: approximate · -6.2975442, 106.668084
View location on map →
Parent
Not assigned

Location detail

Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
14 MW
IT load
Reported design/development capacity; delivered share unconfirmed
Unknown · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Design ceiling; this source does not prove how much is commissioned. The CSV's Cikarang expansion toward 200 MW is not established by the cited page.

Development timeline

  1. No dated milestones established.

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Google Maps · NeutraDC Serpong ↗

Published Date unavailable · Retrieved 2026-09-11

Named place result NeutraDC Serpong; POI coordinates -6.2975442, 106.668084. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.

Property imagery · www.neutradc.com ↗

Published Date unavailable · Retrieved 2026-09-11

Property exterior: NeutraDC Serpong. Image reference: https://www.neutradc.com/build/assets/jakarta-2-Cs_Hw9zW.webp Visually inspected against the cited source and profile identity.

Operator logo · www.neutradc.com ↗

Published Date unavailable · Retrieved 2026-09-11

NeutraDC operator brand mark. Image reference: https://www.neutradc.com/build/assets/logo-main-CHPkauUE.webp Visually inspected against the cited source and profile identity.

Profile field evidence

Name: NeutraDC Serpong — supporting evidence

Kind: NeutraDC Serpong — supporting evidence

Country: NeutraDC Serpong — supporting evidence

Region: NeutraDC Serpong — supporting evidence

Metro: NeutraDC Serpong — supporting evidence

City: NeutraDC Serpong — supporting evidence

Operator: NeutraDC Serpong — supporting evidence

Statuses: NeutraDC Serpong — supporting evidence

Summary: NeutraDC Serpong — supporting evidence

Location: Google Maps · NeutraDC Serpong

Media: Property imagery · www.neutradc.com

Operator Logo: Operator logo · www.neutradc.com

Stable identifier: 9d124cea-22cf-4221-8f81-da80b9e416ac