Armenia / Site

ADKARS Hrazdan AI data center project

ADKARS Razdan AI Data Center · ADKARS hyperscale AI Data Center Hrazdan

Planned

Promoter describes a 120 MW AI data-center project near Hrazdan. Publication claims construction has started, while its presentation lists a future construction schedule. Retained conservatively as planned until current site progress is corroborated; eventual operator and precise parcel are unknown.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 3
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Unknown
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Unknown / Unknown
City / locality
Hrazdan area
Address
Unknown
Location
ADKARS project property not established. Previous pin cited another project, Firebird, and used its map viewport center.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
120 MW
Facility power
Total electrical design of proposed project
Planned · cumulative
NoneReported claim ↗

Excluded from capacity totals. Promoter claim; no independent commissioning, utility allocation or measured IT load established.

Development timeline

  1. 2025-12-25 · reported

    Supermicro memorandum reported

    Supporting source ↗
  2. 2026-03-08 · actual

    Project listed by promoter

    Supporting source ↗
  3. 2026-05 · planned

    Scheduled construction start

    Do not interpret the elapsed target date as proof of construction.

    Supporting source ↗

Disclosed specifications

Project promoter

ADKARS — Reconstruction and Development Agency of Armenia

Promoter identity; not evidence of an appointed facility operator or property owner.

Source ↗

Proposed technology

16,000 NVIDIA Vera Rubin processors

Design intent only; deliveries not verified.

Source ↗

Heat reuse concept

Greenhouse heating

Proposal, not evidence of operational sustainability performance.

Source ↗

Status conflict

Web article says construction started; presentation lists future start

No fresh corroboration or exact parcel found. Reviewer should retain planned or request clarification.

Source ↗

Duplicate review

Distinct promoter and Supermicro MoU from Firebird announcements

No evidence found linking it to Firebird; parcel and legal-project identity should be reconciled before counting it as independently confirmed.

Source ↗

Project promoter

ADKARS Reconstruction and Development Agency of Armenia

Promoter identity does not establish government ownership, a project SPV, or beneficial ownership.

Source ↗

Historical leadership

Sarkis Gevorkyan, identified as ADKARS head in 2020

Also transliterated Sargis Gevorgyan. Current role and ownership unconfirmed. No reliable mining connection established in this research.

Source ↗

Google Maps research check

no matched result

Accessible embedded search yielded no matched ADKARS property. Existing profile location evidence explicitly names Firebird.ai Data Center. The saved longitude 44.7912674 is that URL viewport center; its Firebird place marker longitude is 44.7938423. Neither establishes the ADKARS project site. Propose clearing unsupported precise coordinates while retaining the old source and revision history. Photo galleries were not accessible in the available public response; no property photograph visually verified or imported. No assertion that no photos exist.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

ADKARS Hrazdan AI project ↗

Published Date unavailable · Retrieved 2026-10-07

Promoter describes a 120 MW total electrical design and 16,000 Vera Rubin processors; claims construction started. Heat reuse for greenhouses is a design proposal.

ADKARS project presentation ↗

Published Date unavailable · Retrieved 2026-10-07

Hrazdan-area project; planned construction start May 2026. Schedule is not evidence of actual delivery.

ADKARS Supermicro memorandum notice ↗

Published Date unavailable · Retrieved 2026-10-07

Promoter reports a December 25, 2025 memorandum with Supermicro for an Armenian AI data center. This does not establish Supermicro as operator.

. ↗

Published 2026-10-07 · Retrieved 2026-10-07

.

ADKARS Hrazdan project announcement ↗

Published Date unavailable · Retrieved 2026-10-07

Project promoted by ADKARS Reconstruction and Development Agency of Armenia. Does not provide a verified shareholder table or ultimate beneficial owner for the project.

Aravot: ADKARS historical leadership ↗

Published 2020-08-18 · Retrieved 2026-10-07

August 2020 reporting identifies Sarkis Gevorkyan as head of ADKARS. Historical leadership is not evidence of current ownership or project equity.

Google Maps location and photo check: adkars ↗

Published Date unavailable · Retrieved 2026-10-07

Accessible embedded search yielded no matched ADKARS property. Existing profile location evidence explicitly names Firebird.ai Data Center. The saved longitude 44.7912674 is that URL viewport center; its Firebird place marker longitude is 44.7938423. Neither establishes the ADKARS project site. Propose clearing unsupported precise coordinates while retaining the old source and revision history. Photo galleries were not accessible in the available public response; no property photograph visually verified or imported. No assertion that no photos exist.

Profile field evidence

Name: ADKARS Hrazdan AI project

Aliases: ADKARS Hrazdan AI project

Kind: ADKARS Hrazdan AI project

Country: ADKARS Hrazdan AI project

City: ADKARS Hrazdan AI project

Statuses: ADKARS Hrazdan AI project

Summary: ADKARS Hrazdan AI project

Location: Google Maps location and photo check: adkars

Stable identifier: 9f1ad90e-3dfe-4a9e-8431-298e6101f1f3