Map
Sign in
← NEXTDC P1 Perth

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 1 · Current

2026-10-09 14:21 UTC

Published profile snapshot

NEXTDC P1 Perth · Australia · NEXTDC

Operational NEXTDC colocation facility in Malaga, metropolitan Perth, with an adjacent expansion under construction. FY26 disclosures distinguish 5.5 MW built capacity from 2 MW in progress and approximately 10 MW+ total planned capacity. The contractor reports 12 MW ultimate capacity, requiring reconciliation.

Capacity statements: 7 · Sources: 14

5.5 MW (exact) · it · P1 existing built capacity · 2026-08-27

2 MW (exact) · it · P1 expansion capacity in progress · 2026-08-27

10 MW (gte) · unspecified · P1 total planned capacity including expansion · 2026-08-27

10 MW (gte) · it · P1 advertised target IT capacity · 2026-10-09

6 MW (exact) · it · P1 target in accessible facility brochure · 2026-10-09

12 MW (exact) · unspecified · P1 long-term capacity after expansion · 2026-10-09

6 MW (exact) · unspecified · Historical P1 facility capacity description · 2018-10-30