Australia / Site

NEXTDC M4 Melbourne

M4 Melbourne Data Centre · M4 Port Melbourne · M4 Technology Campus

Under ConstructionPlanned

NEXTDC's M4 development occupies the former Westgate Park Printing Complex in Fishermans Bend. Planning approval is established and early works are reported; the ultimate campus remains planned. The published target is 150 MW IT capacity, with a separate 162 MW campus claim requiring reconciliation.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
NEXTDC Limited
Ownership
NEXTDC group
Business model / scale
Colocation / Hyperscale
Region / metro
Victoria / Melbourne
City / locality
Port Melbourne
Address
127 Todd Road, Port Melbourne VIC 3207, Australia
Location
Address corroborated by operator and Victorian planning register; no independently corroborated point coordinates established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
150 MW
IT load
Ultimate M4 target IT capacity
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated live facility page; target, not commissioned capacity. Relationship to 162 MW announcement unresolved.

162 MW
Unspecified power
M4 digital infrastructure campus
Planned · cumulative
2026-01-19Reported claim ↗

Excluded from capacity totals. As-of is announcement date. Source does not identify IT, facility or grid basis; do not combine with 150 MW IT target.

≈10 MW
Unspecified power
Initial Stage 1 capacity within M4
Planned · incremental
2026-04-20Reported claim ↗

Excluded from capacity totals. As-of is presentation date. Initial capacity is part of ultimate campus, not additional to it; power basis is not explicit in the cited project description.

10 MW
Unspecified power
M4 capacity being progressed with early works
Under Construction · unclear
2026-06-30Reported claim ↗

Excluded from capacity totals. As-of is reporting balance date, published 27 August 2026. Early works support development status, not completed data halls or operational IT load; likely overlaps Stage 1 claim.

80 MW
Unspecified power
Historical initial M4 facility concept
Planned · cumulative
2023-06-30Reported claim ↗

Excluded from capacity totals. As-of is FY23 reporting period end, not acquisition or publication date. Historical concept predates 150 MW and 162 MW announcements; do not aggregate.

Development timeline

  1. FY23 · actual_acquisition_reported

    M4 site acquired

    NEXTDC group reports acquiring the M4 site during the financial year ended 30 June 2023; precise transaction date and landholding entity unresolved.

    Supporting source ↗
  2. 2025-06-12 · announcement

    A$2 billion M4 campus announced

    NEXTDC announces the AI Factory and technology campus at 127 Todd Road.

    Supporting source ↗
  3. 2025-10-23 · actual_planning_application

    Planning application received

    Victorian register records receipt of application PA2504019.

    Supporting source ↗
  4. 2026-01-16 · actual_approval

    Planning permit granted

    Ministerial register records permit decision for the proposed data centre.

    Supporting source ↗
  5. 2HFY26 · planned_early_works

    Stage 1 early works forecast

    April presentation expected early works during the second half of FY26; this is a forecast rather than an actual start date.

    Supporting source ↗
  6. 2026-08-27 · actual_progress_report

    Early works reported in progress

    FY26 results release reports M4 early works in progress; no commissioning date established.

    Supporting source ↗

Disclosed specifications

Building configuration

Single building with three main data hall components and north/west office interfaces

Approved proposal description, not an as-built survey.

Source ↗

Technical space

26,400 m²

Undated M4 facility page target; conflicts with Melbourne comparison page's 58,200 m².

Source ↗

Technical space — alternative operator figure

58,200 m²

Undated regional comparison table; definition and relationship to 26,400 m² unresolved.

Source ↗

Mission-critical facilities area

50,000 m²

June 2025 announced scope; not established as land area or directly comparable with technical space.

Source ↗

Cooling and density

Direct-to-chip closed-loop liquid cooling; recycled non-potable water; 1,000 kW rack density

January 2026 design announcement; installed performance and rack count unverified.

Source ↗

Certification target

Uptime Institute Tier IV

Facility page identifies target certification; achieved site certification not established.

Source ↗

Energy and sustainability design

On-site solar, microgrids, waste heat recovery and recycled wastewater cooling

Proposed June 2025 features; deployment and measured environmental performance unknown.

Source ↗

Connectivity

Planned interconnection with other Melbourne facilities

Facility page describes intended low-latency cloud and AI access; carrier inventory not established.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

M4 Melbourne Data Centre ↗

Published Date unavailable · Retrieved 2026-10-09

Facility page labels M4 In Planning, targets 150 MW IT capacity and 26,400 square metres technical space, and describes intended customer segments and Tier IV target.

M4 Technology Campus Approved ↗

Published 2026-01-19 · Retrieved 2026-10-09

Announces development approval and a 162 MW campus with hyperscale AI Factory, operations centre and Technology Centre of Excellence; specifies intended liquid cooling.

NEXTDC FY23 Annual Report ↗

Published Date unavailable · Retrieved 2026-10-09

Reports acquisition of a new M4 Melbourne site during FY23, near M1, initially envisaged to support an 80 MW facility. Establishes group acquisition, not the registered title entity.

Profile field evidence

Name: M4 Melbourne Data Centre; NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend

Aliases: M4 Melbourne Data Centre; M4 Technology Campus Approved

Kind: NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend; Victorian ministerial planning permit register: PA2504019

Country: NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend; Melbourne Data Centre | AI Factories & Colocation

Region: Victorian ministerial planning permit register: PA2504019

City: Victorian ministerial planning permit register: PA2504019; Melbourne Data Centre | AI Factories & Colocation

Metro: NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend; Melbourne Data Centre | AI Factories & Colocation

Address: Victorian ministerial planning permit register: PA2504019; Melbourne Data Centre | AI Factories & Colocation

Operator: M4 Melbourne Data Centre; NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend; Victorian ministerial planning permit register: PA2504019

Owner: NEXTDC FY23 Annual Report

Business Model: M4 Melbourne Data Centre; Melbourne Data Centre | AI Factories & Colocation

Scale: M4 Technology Campus Approved

Statuses: M4 Melbourne Data Centre; FY26 Record Results and Record FY27 Growth Guidance

Summary: M4 Melbourne Data Centre; NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend; M4 Technology Campus Approved; Victorian ministerial planning permit register: PA2504019; FY26 Record Results and Record FY27 Growth Guidance

Location: Victorian ministerial planning permit register: PA2504019; Melbourne Data Centre | AI Factories & Colocation

Stable identifier: a90459bf-73cc-45cc-a8d4-caacd0dbf5a5