Evolution Bangkok platform ↗
Published Date unavailable · Retrieved 2026-09-11
TH01 Bang Na: 52 MW IT across two phases. TH02 Phraeska: 200 MW IT phased campus, targeted Q2 2027.
Thailand / Site
Operator calls TH01 an existing facility; 52 MW spans two phases. Fully commissioned share unknown.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 52 MW IT load | Reported design capacity; energized and occupied load not established Operational · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. Operator calls TH01 an existing facility; 52 MW spans two phases. Fully commissioned share unknown. |
No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
TH01 Bang Na: 52 MW IT across two phases. TH02 Phraeska: 200 MW IT phased campus, targeted Q2 2027.
Published Date unavailable · Retrieved 2026-09-11
Evolution operator brand mark. Image reference: https://evolutiondatacentres.com/wp-content/uploads/2024/11/EVO_LOGO_WHITE_TRANSPARENT4-650-135.png Visually inspected against the cited source and profile identity.
Name: Evolution Bangkok platform
Operator: Evolution Bangkok platform
Country: Evolution Bangkok platform
Region: Evolution Bangkok platform
Metro: Evolution Bangkok platform
City: Evolution Bangkok platform
Kind: Evolution Bangkok platform
Statuses: Evolution Bangkok platform
Summary: Evolution Bangkok platform
Operator Logo: Operator logo · evolutiondatacentres.com
Stable identifier: a92a53e6-72cc-487f-852e-42beb5ea8c22