Five 40 MW buildings form a 200 MW campus. September 2026 energization/Q4 2026 first-building dates are targets only.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Empyrion Digital
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Johor / Johor Bahru
City / locality
Gelang Patah
Address
i-TechValley, Persiaran Bioteknologi, SiLC
Location
Property coordinate not established; no city centroid substituted.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
200 MW
Unspecified power
Advertised full-build/design capacity; commissioned share unconfirmed
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Retrieval date, not measurement date. Design ceiling is not proof of delivered/occupied load. Excluded from aggregates pending reconciliation. Five 40 MW buildings form a 200 MW campus. September 2026 energization/Q4 2026 first-building dates are targets only.

200 MW
IT load
Ultimate MY1 campus IT design; operator also gives 100–200 MW range
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation.

Development timeline

  1. No dated milestones established.

Disclosed specifications

Research clarification · 2026-09-11

200 MW is the upper end of the disclosed IT design range; 40 MW-per-building statement is not multiplied into extra capacity.

Source-backed research proposal; publication requires review.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Empyrion · MY1 Johor ↗

Published Date unavailable · Retrieved 2026-09-11

MY1 page labels 100–200 MW as IT capacity and describes a 200 MW campus design.

Operator logo · empyriondigital.com ↗

Published Date unavailable · Retrieved 2026-09-11

Empyrion operator brand mark. Image reference: https://empyriondigital.com/wp-content/uploads/2023/12/Group-3.png Visually inspected against the cited source and profile identity.

Profile field evidence

Name: Empyrion MY1 Nusajaya campus — capacity evidence

Operator: Empyrion MY1 Nusajaya campus — capacity evidence; Empyrion · MY1 Johor

Country: Empyrion MY1 Nusajaya campus — capacity evidence

Region: Empyrion MY1 Nusajaya campus — capacity evidence

Metro: Empyrion MY1 Nusajaya campus — capacity evidence

City: Empyrion MY1 Nusajaya campus — capacity evidence

Address: Empyrion MY1 Nusajaya campus — capacity evidence

Kind: Empyrion MY1 Nusajaya campus — capacity evidence

Statuses: Empyrion MY1 Nusajaya campus — capacity evidence

Summary: Empyrion MY1 Nusajaya campus — capacity evidence

Operator Logo: Operator logo · empyriondigital.com

Stable identifier: af8c8ec7-a7d5-4edd-9700-0b86c9cae296